Nibbi Brothers General Contractors
General contractor based in San Francisco, CA · checked November 27, 2026
General contractor in San Francisco building affordable multifamily housing with volumetric modules in the Bay Area.
What it is
Nibbi Brothers says NibbiPrefab works with clients, design teams, modular manufacturers and its operations staff from preconstruction through delivery.[2] Firm's claim
At a glance
Capabilities on record
Signals
- Offsite or VDC team
- Runs NibbiPrefab, a modular team that works with clients, design teams and modular manufacturers[2]
Projects
Buildings this firm completed or has under construction with an industrialized method, mass timber or a performance certification, and its role on each.
355 Sango Court[3][6]
- Place
- Milpitas, CA
- Status
- Completed, 2023
- Role
- General contractor
- Building
- Affordable housing, 102 homes
- Built with
- Volumetric modules
- Manufacturer
- Autovol
330 Distel Circle[4][7]
- Place
- Los Altos, CA
- Status
- Under construction, 2027
- Role
- General contractor
- Building
- Affordable housing, 90 homes
- Built with
- Volumetric modules, Mass timber
El Cerrito Plaza Parcel A South[5][8][9]
- Place
- El Cerrito, CA
- Status
- Under construction, 2027
- Role
- General contractor
- Building
- Affordable housing, 70 homes
- Built with
- Volumetric modules, Light wood frame, Concrete
Sources
9 sources, checked November 27, 2026.
- Nibbi Brothers General Contractors. Contact Us. Accessed November 27, 2026.
- Nibbi Brothers General Contractors. NibbiPrefab / Modular. Accessed November 27, 2026.
- Modular Building Institute. Inside the Construction of 355 Sango Court. Accessed November 27, 2026.
- Nibbi Brothers General Contractors. 330 Distel Circle. Accessed November 27, 2026.
- Nibbi Brothers General Contractors. El Cerrito Plaza Parcel A South. Accessed November 27, 2026.
- Nibbi Brothers General Contractors. Sango Court. Accessed November 27, 2026.
- California Construction News. Los Altos' first 100% affordable housing community under construction. Accessed November 27, 2026.
- Bay Area Rapid Transit. First phase of Transit-Oriented Development underway at El Cerrito Plaza Station. Accessed November 27, 2026.
- Related California. El Cerrito Plaza BART Parcel South. Accessed November 27, 2026.
Work with us.
Commission deeper research and reporting. Or get help building your industrialized construction value chain: partnerships, cost estimates and deal structures.
Now City Development ServicesApply the research in NowCity.ai