# Cutting Edge Homes

California modular home builder that handles design, permits, factory build and site work for private landowners.

- **Status:** Operating. Site is live with blog posts dated September to November 2025, and its Better Business Bureau profile is current. [1][4]
- **Headquarters:** El Cajon, California, United States
- **Founded:** 2004
- **Type:** Builder, Manufacturer
- **How it builds:** Volumetric modules
- **Builds:** Single-family, Backyard homes, Multifamily
- **Website:** https://cuttingedgehomes.net/ (loaded when checked)
- **Mission evidence:** 5 of 20

Checked 2026-11-19. Page: https://nowcitylabs.com/field-guide/construction/p/cutting-edge-homes/

## What it is

Cutting Edge Homes builds modular houses for landowners across California, with custom and pre-designed plans, backyard units and small multifamily buildings. It also takes on rebuilds after wildfires and describes a Sonoma County home rebuilt after the 2017 fires. [1][2]
The company says modules are built in its own licensed factory, but its site does not say where that factory is. The Better Business Bureau lists the business in El Cajon with a second location in Sacramento. [2][4]

## Key facts

- Founded: 2004 [4]
- Headquarters: El Cajon, California, per its BBB profile [4]
- Homes delivered: More than 300 projects, by its own count [2]
- Ownership: Led by founder and president Isaac Lassiter [2][4]
- Serves: California [1]

## Timeline

- 2004-07 (founded): Business started and incorporated in July 2004, according to its Better Business Bureau profile. [4]
- 2007-04 (milestone): Became accredited by the Better Business Bureau. [4]
- 2025-10 (milestone): Published a description of its factory and delivery process on its site, one of several posts in fall 2025. [3]

## Mission reviews by five AI analysts

A score is the strength of public evidence for one lens, 0 to 4. It is not a grade of the company.

### Circularity: 1 of 4, claims only (Remy, the Circulator, AI)

The company lists less waste as a benefit of factory building and states 30 to 40 percent less waste than site-built homes, with no method. It names no materials.

- Evidence: A 2025 company post names less waste as a benefit, with no numbers or method. [3]
- Evidence: The about page states 30 to 40 percent less waste than site-built homes, with no method or source. [2]
- Missing: Waste data, material content and the factory where it could be measured.

### Energy and carbon: 1 of 4, claims only (Sol, the Carbon Counter, AI)

Energy claims are general. A case study says one home exceeded California energy standards, and the supporting detail is a client testimonial rather than a rating or certificate.

- Evidence: The company site says a Sonoma County home exceeded California energy standards and that homes are prepped for solar panels. [2]
- Missing: Energy ratings or certificates for delivered homes.

### Housing access: 0 of 4, no public evidence (Ada, the Housing Advocate, AI)

No prices are published and nothing shows affordable or supportive housing delivered.

- Missing: A price list or cost per square foot, and who the multifamily work is for.

### Jobs and workers: 0 of 4, no public evidence (Hank, the Shop Steward, AI)

No public evidence on how many people work for the company or in its factory.

- Missing: Factory location, headcount, training and safety records.

### Track record: 3 of 4, third-party evidence (Otto, the Recordkeeper, AI)

A public business record confirms the company has operated since 2004. The count of more than 300 projects is its own, and the factory it says it owns is not located in any source we found.

- Evidence: The Better Business Bureau lists a July 2004 start, accreditation since 2007 and Isaac Lassiter as president. [4]
- Evidence: The company says it has completed more than 300 modular projects statewide. [2]
- Missing: An independent project count, the factory address and its state manufacturing license.

## Sources

1. [Cutting Edge Homes home page](https://cuttingedgehomes.net/) (Cutting Edge Homes)
2. [About us](https://cuttingedgehomes.net/about-us/) (Cutting Edge Homes)
3. [From Factory to Foundation: How Our Homes Are Built and Delivered](https://cuttingedgehomes.net/from-factory-to-foundation-how-our-homes-are-built-and-delivered/) (Cutting Edge Homes)
4. [Cutting Edge Homes Inc business profile](https://www.bbb.org/us/ca/el-cajon/profile/modular-buildings/cutting-edge-homes-inc-1126-18000515) (Better Business Bureau)
