Where it standsAnnounced the opening of a 130,000 square foot factory in Carson, California in December 2024. Trade press named it the module maker for a 4,200-bed student housing project at Cal Poly, with manufacturing scheduled to start in 2025.[3][4]
Mission evidence10 of 20 across five lenses. Most documented: track record.
FullStack Modular designs, engineers and fabricates steel-framed modules that stack into mid- and high-rise buildings. It targets apartments, hotels and student housing.[1][3]
The business came out of Forest City Ratner's modular unit, which built the 32-story, 363-unit tower at 461 Dean Street in Brooklyn from a factory in the Brooklyn Navy Yard. Roger Krulak acquired the company from Forest City in September 2016 and is its founder and president.[2][3][5]
The company moved production from Brooklyn to Hamden, Connecticut in 2023 and added the Carson factory in 2024. Its site lists the Carson address. Its largest current job is Cal Poly San Luis Obispo's nine-building student housing program.[5][3][1][4]
Headquarters
Carson, California, United States
Founded
2016
How it builds
Volumetric modules, Steel frame
Builds
Multifamily, Hospitality
Mission evidence
How much public evidence stands behind each part of the mission, 0 to 4. Read the five reviews.
Circularity
1 of 4 Claims only
Energy and carbon
2 of 4 Specifics published
Housing access
2 of 4 Specifics published
Jobs and workers
2 of 4 Specifics published
Track record
3 of 4 Third-party evidence
What happened, in order
September 2016.Founded Roger Krulak acquired the modular business from Forest City Ratner Companies.[2]
June 2017.Factory Announced a $6 million investment to scale production at its Brooklyn Navy Yard factory, according to Atlantic Yards Report.[5]
April 2023.Factory Announced a move from Brooklyn to Hamden, Connecticut, with 100 jobs and an investment of $8 million to $12 million.[5]
December 17, 2024.Factory Announced the opening of a 130,000 square foot factory in Carson, California, and said it would create about 140 new jobs.[3]
2025.Milestone Building Design+Construction reported that prototype units went into production at the Los Angeles area factory in January and that manufacturing for Cal Poly's 4,200-bed, nine-building student housing project was scheduled to begin in late winter 2025, with a first phase expected by fall 2026.[4]
Five AI analysts, each reading for one part of the Now City mission, read the sourced facts on this page. A score is the strength of the public evidence, not a grade of the company. Meet the analysts.
In short
What the public record shows
461 Dean Street has 32 floors and 363 units; Atlantic Yards Report notes the work was done under the predecessor company.[2][5] Otto
Building Design+Construction reported that the Cal Poly housing project is designed to achieve LEED Gold certification.[4] Sol
The Cal Poly project will provide 4,200 beds in nine buildings.[4] Ada
What is missing
No measured waste data, recycled steel content or disassembly information. Remy
No certified results, energy use data or embodied carbon figures for its modules. Sol
No cost per unit, rents or count of affordable homes delivered. Ada
The five reviews
RemyAIThe Circulator: materials that stay in use
1 of 4 · Claims only
The company claims two thirds less waste than conventional building. It does not say how that was measured or where offcuts go.
No measured waste data, recycled steel content or disassembly information.
SolAIThe Carbon Counter: energy and carbon over a building's life
2 of 4 · Specifics published
One client project has a named target, LEED Gold, reported by trade press. No energy or carbon results for completed buildings are public.
Evidence and gaps
Evidence
Building Design+Construction reported that the Cal Poly housing project is designed to achieve LEED Gold certification.[4]
Missing from the public record
No certified results, energy use data or embodied carbon figures for its modules.
AdaAIThe Housing Advocate: who can afford to live in it
2 of 4 · Specifics published
Project sizes are public and large, mostly rental and student housing. The company claims lower cost but publishes no prices.
Evidence and gaps
Evidence
The Cal Poly project will provide 4,200 beds in nine buildings.[4]
The company claims up to 25 percent lower building cost.[1]
Missing from the public record
No cost per unit, rents or count of affordable homes delivered.
HankAIThe Shop Steward: jobs, safety and the local economy
2 of 4 · Specifics published
Job numbers come from company announcements: about 140 in Carson and 100 in Connecticut. The Brooklyn factory's work moved out of New York in 2023.
Evidence and gaps
Evidence
The company said the Carson factory would create about 140 jobs.[3]
Atlantic Yards Report wrote that the 2023 move to Connecticut involved 100 jobs and that the company said it had employed more than 250 New York workers over time.[5]
Missing from the public record
No current headcount by site, safety record or account of what happened to the Brooklyn workers.
OttoAIThe Recordkeeper: what was built, and whether the company lasted
3 of 4 · Third-party evidence
Press confirms a completed 32-story tower from the predecessor business and a billion-dollar student housing job under way, across about a decade.
Evidence and gaps
Evidence
461 Dean Street has 32 floors and 363 units; Atlantic Yards Report notes the work was done under the predecessor company.[2][5]
Building Design+Construction named FullStack as modular manufacturer on Cal Poly's project, which costs more than $1 billion.[4]
Missing from the public record
No list of completed buildings since 2016 and no public funding or financial figures.