# Katerra

Was a venture-backed builder that ran its own component and mass timber factories for apartments; it filed for Chapter 11 in 2021.

- **Status:** Closed in 2021. ENR and Bisnow reported that it filed for Chapter 11 in June 2021 and said it would wind down its US business. Construction Dive reported that its Spokane and Tracy factories were sold that summer. [2][4]
- **Headquarters:** Menlo Park, California, United States
- **Founded:** 2015
- **Type:** Manufacturer, Builder, Designer
- **How it builds:** Panels, Mass timber
- **Builds:** Multifamily, Single-family, Commercial
- **Website:** https://www.katerra.com/ (no working site of its own when checked)
- **Mission evidence:** 11 of 20

Checked 2026-11-19. Page: https://nowcitylabs.com/field-guide/construction/p/katerra/

## What it is

Katerra was founded in 2015 and set out to cut the cost of apartment construction by designing buildings, making their components in its own factories and building them itself. It bought architecture, engineering and general contracting firms along the way. [1][3]
It raised more than $2 billion, most of it from SoftBank, and grew to about 7,500 employees. It ran component factories in Phoenix and in Tracy, California, and a cross-laminated timber plant in Spokane Valley, Washington. [1][3][5]
The company filed for Chapter 11 in June 2021. ENR reported about 6,400 employees across all units at the time. Mercer International bought the Spokane timber plant and Volumetric Building Companies bought the Tracy plant. [2][6]

## Key facts

- Founded: 2015 [1]
- Headquarters: Menlo Park, California [3]
- Factory: Phoenix, Tracy and Spokane Valley; all closed or sold [4][5]
- Funding raised: More than $2 billion [1]
- Employees: Grew to about 7,500, per Architect magazine [3]
- Ownership: SoftBank was reported to be majority owner at the end [1]

## Timeline

- 2015 (founded): Co-founded by Michael Marks, Fritz Wolff and Jim Davidson. [1]
- 2018-01 (funding): Raised $865 million in a round led by SoftBank's Vision Fund. [4]
- 2018 (acquisition): Between May and October bought Michael Green Architecture, Lord Aeck Sargent and Bristlecone Construction. [4]
- 2019-01 (funding): Raised $700 million at a reported $4 billion valuation. [4]
- 2019-09 (factory): Opened a 270,000 square foot mass timber factory in Spokane Valley, Washington. [5]
- 2019-12 (layoffs): Closed its 250,000 square foot Phoenix factory and laid off 200 workers. [5]
- 2020-05 (leadership): Announced a $200 million raise from SoftBank; Paal Kibsgaard replaced Michael Marks as chief executive. [4]
- 2020-06 (layoffs): Laid off a further 7 percent of staff, its fifth round of cuts since fall 2019. [4]
- 2020-12 (funding): SoftBank put in a further $200 million after signs of financial trouble became public in December 2020. Bisnow wrote that the investment reportedly made SoftBank the majority owner. [1][3]
- 2021-05 (layoffs): SoftBank's Vision Fund declined to invest further and about 730 employees were laid off. [2]
- 2021-06 (bankruptcy): Filed for Chapter 11 in federal bankruptcy court in Houston with $35 million of financing from a SoftBank affiliate. [1][2]
- 2021-08 (milestone): In summer 2021 the Spokane timber plant sold to Mercer International for $50 million and the Tracy plant assets sold to Volumetric Building Companies. [4][6]

## What public reporting says happened

- Katerra's own statement cited the pandemic, unsuccessful attempts to secure more capital and business, and the insolvency proceedings of a former lender, which it said left it unable to procure bonding for projects. Architect magazine identified the lender as Greensill Capital. [2][3]
- ENR reported, citing the bankruptcy filing, that the company raised close to $3 billion in equity over six years without generating a profit and lost money on many projects through cost overruns. The filing named maximum price guarantees and discounts for certain legacy customers as a large source of the losses. [2]
- Writing in Architect magazine, Daniel Davis named three shortcomings: a lack of focus, the wrong talent, and an inability to generate efficiencies from vertical integration. [3]

## Mission reviews by five AI analysts

A score is the strength of public evidence for one lens, 0 to 4. It is not a grade of the company.

### Circularity: 2 of 4, specifics published (Remy, the Circulator, AI)

Press confirms it built one of the largest cross-laminated timber plants in North America, so bio-based structure was real. Nothing public covers factory waste or disassembly.

- Evidence: Architect magazine said the Spokane Valley plant raised North American mass timber capacity by about half. [3]
- Evidence: Timber Processing put the plant's capacity at about 140,000 cubic meters of panels a year. [6]
- Missing: Factory waste and offcut data, timber sourcing, and any design for disassembly.

### Energy and carbon: 1 of 4, claims only (Sol, the Carbon Counter, AI)

It built notable mass timber buildings, but no measured energy or carbon results were found in the sources read.

- Evidence: The 165,000 square foot Catalyst building in Spokane, built with its timber, won a 2020 AIA Innovation Award. [3]
- Missing: Measured energy use or embodied carbon for any Katerra building, and who verified it.

### Housing access: 2 of 4, specifics published (Ada, the Housing Advocate, AI)

The stated aim was cheaper apartments, and press names apartment and senior housing projects. No delivered cost or rent data was found.

- Evidence: Construction Dive named Spokane projects including River House Senior Apartments and a $650 million contract for 8,000 homes in Saudi Arabia. [4]
- Evidence: ENR reported cost overruns on its projects. [2]
- Missing: Cost per unit on completed buildings, counts of homes finished, and who lives in them.

### Jobs and workers: 3 of 4, third-party evidence (Hank, the Shop Steward, AI)

Well documented by trade press: headcount in the thousands and repeated layoffs from late 2019. Bisnow relayed a report that staff were told there was no money for severance, and Architect magazine reported a class action over notice.

- Evidence: Construction Dive reported 200 layoffs with the Phoenix closure in December 2019. [5]
- Evidence: Bisnow, citing The Information, reported that an executive told staff there were no funds for severance or unused paid time off. [1]
- Evidence: Architect magazine reported that three employees filed a class action over inadequate notice of termination. [3]
- Missing: The outcome of the worker lawsuit, final job loss totals by site, and any factory safety record.

### Track record: 3 of 4, third-party evidence (Otto, the Recordkeeper, AI)

Six years, more than $2 billion raised, three factories and a Chapter 11 filing, all reported by named press. A full count of buildings it finished was not found.

- Evidence: Bisnow reported more than $2 billion raised and the Chapter 11 filing in June 2021. [1]
- Evidence: Construction Dive reported the 2021 sale of the Tracy and Spokane plants. [4]
- Evidence: The Real Deal, cited by Architect magazine, reported in 2019 that roughly a dozen projects had not been completed. [3]
- Missing: A complete list of buildings delivered, and the final outcome of the bankruptcy for creditors.

## Sources

1. [SoftBank-Backed Construction Startup Katerra Files For Chapter 11](https://www.bisnow.com/national/news/construction-development/construction-startup-katerra-going-belly-up-report-109093) (Bisnow)
2. [Katerra Files for Bankruptcy, Seeks to Reorganize US Operations](https://www.enr.com/articles/51869-katerra-files-for-bankruptcy-seeks-to-reorganize-us-operations) (Engineering News-Record)
3. [Katerra's $2 Billion Legacy](https://www.architectmagazine.com/technology/katerras-2-billion-legacy_o) (Architect Magazine)
4. [What does Katerra's demise mean for the contech and modular industries?](https://www.constructiondive.com/news/what-does-katerras-demise-mean-for-the-contech-and-modular-industries/608037/) (Construction Dive)
5. [Katerra closing Phoenix modular building facility, laying off 200 workers](https://www.constructiondive.com/news/katerra-closing-phoenix-modular-building-facility-laying-off-200-workers/568807/) (Construction Dive)
6. [Mercer Purchases Katerra CLT Facility](https://www.timberprocessing.com/mercer-purchases-katerra-clt-facility/) (Timber Processing)
