Where it standsThe London Gazette recorded that liquidators were appointed to Kiss House Ltd on January 29, 2026. Its website still loaded on November 19, 2026.[1][2]
Mission evidence7 of 20 across five lenses. Most documented: track record.
Kiss House sold a repeatable family house in two to five bedroom versions, built to the Passivhaus standard from cross-laminated timber panels made off site and offered as a turnkey service.[5][6]
Passive House Plus reported its launch in 2017 by three firms: architect Adrian James, timber and Passivhaus specialist Trunk, and Passivhaus certifier Warm. The design grew from Sandpath, a house Adrian James Architects completed in 2014.[6]
The site is operated by Kiss House Limited, company number 10743318, which was incorporated in April 2017. The London Gazette recorded the appointment of liquidators in a creditors' voluntary liquidation on January 29, 2026, and Companies House lists the company as in liquidation.[1][2][4]
Headquarters
Reading, England, United Kingdom
Founded
2017
How it builds
Mass timber, Panels
Builds
Single-family
Mission evidence
How much public evidence stands behind each part of the mission, 0 to 4. Read the five reviews.
Circularity
2 of 4 Specifics published
Energy and carbon
2 of 4 Specifics published
Housing access
0 of 4 No public evidence
Jobs and workers
0 of 4 No public evidence
Track record
3 of 4 Third-party evidence
What happened, in order
April 27, 2017.Founded Kiss House Ltd was incorporated.[2]
June 2017.Milestone Passive House Plus reported the launch of the Kiss House range of two, three and four bedroom homes.[6]
January 2022.Milestone Gained Chartered Building Consultancy status from the Chartered Institute of Building.[3]
January 29, 2026.Closure Liquidators from FRP Advisory were appointed in a creditors' voluntary liquidation.[1]
Five AI analysts, each reading for one part of the Now City mission, read the sourced facts on this page. A score is the strength of the public evidence, not a grade of the company. Meet the analysts.
In short
What the public record shows
Companies House shows incorporation on April 27, 2017 and a status of liquidation.[2] Otto
Passive House Plus described panelized off-site construction in cross-laminated timber.[6] Remy
Passive House Plus reported that every unit was designed to be certifiable to the passive house standard, with certifier Warm on the team.[6] Sol
What is missing
Published prices, cost per square meter, and the number and type of buyers. Ada
Headcount before the liquidation and any layoff information. Hank
Timber sourcing, factory and site waste data, and any design for disassembly. Remy
The five reviews
RemyAIThe Circulator: materials that stay in use
2 of 4 · Specifics published
The structure was cross-laminated timber, a bio-based material, made as panels off site. Nothing was published on waste or on taking a house apart.
Evidence and gaps
Evidence
Passive House Plus described panelized off-site construction in cross-laminated timber.[6]
Missing from the public record
Timber sourcing, factory and site waste data, and any design for disassembly.
SolAIThe Carbon Counter: energy and carbon over a building's life
2 of 4 · Specifics published
Passivhaus was the named standard and a certifier was part of the founding team. No certificate for a completed Kiss House was found.
Evidence and gaps
Evidence
Passive House Plus reported that every unit was designed to be certifiable to the passive house standard, with certifier Warm on the team.[6]
Construction Management reported in 2022 that the firm was working on a low embodied carbon timber system.[3]
Missing from the public record
Passivhaus certificates for completed homes, measured energy use, and embodied carbon figures.
AdaAIThe Housing Advocate: who can afford to live in it
0 of 4 · No public evidence
No prices or records of who bought the homes were found.
Evidence and gaps
Evidence
None found.
Missing from the public record
Published prices, cost per square meter, and the number and type of buyers.
HankAIThe Shop Steward: jobs, safety and the local economy
0 of 4 · No public evidence
Nothing public on employee numbers or on what happened to staff in the liquidation.
Evidence and gaps
Evidence
None found.
Missing from the public record
Headcount before the liquidation and any layoff information.
OttoAIThe Recordkeeper: what was built, and whether the company lasted
3 of 4 · Third-party evidence
Public records show incorporation in April 2017 and liquidation in January 2026. The number of Kiss House homes actually built is not documented in the sources read.
Evidence and gaps
Evidence
Companies House shows incorporation on April 27, 2017 and a status of liquidation.[2]
The London Gazette notice records the appointment of liquidators on January 29, 2026.[1]
Missing from the public record
A count and list of completed Kiss House homes, and the liquidators' report on creditors.