Where it standsIts site is live with a Santa Monica address and a booking link, but shows no dated activity; the latest coverage found is from February 2023.[1][4]
mnmMOD is a factory-made building panel system from Minarc, a Santa Monica architecture studio. The company names Tryggvi Thorsteinsson and Erla Dogg Ingjaldsdottir as its inventors and chief executives, and as principals of Minarc.[2]
The Santa Monica Daily Press described the panels in 2020 as steel and expanded polystyrene foam, screwed together on site in place of wood framing. It reported that the first panels were made at a small factory at Santa Monica Airport and the first house was built in Venice.[3]
The company's portfolio page names six projects, including the Superba Residence, without completion dates. The pages read give no prices or production figures.[5]
Headquarters
Santa Monica, California, United States
How it builds
Panels, Steel frame
Builds
Single-family
Mission evidence
How much public evidence stands behind each part of the mission, 0 to 4. Read the five reviews.
Circularity
2 of 4 Specifics published
Energy and carbon
2 of 4 Specifics published
Housing access
1 of 4 Claims only
Jobs and workers
0 of 4 No public evidence
Track record
2 of 4 Specifics published
What happened, in order
1999.Founded The founders started the architecture studio Minarc in Santa Monica, according to the Santa Monica Daily Press. The same article gives 1999 as the year mnmMOD was launched; no other source for that date was found.[3]
October 2020.Milestone The Santa Monica Daily Press profiled the panel system and its first house, on Superba Avenue in Venice.[3]
2022.Milestone mnmMOD received a 2022 Good Design Award, according to Global Design News, which also described Minarc as a 2022 International Architecture Awards honorable mention.[4]
Five AI analysts, each reading for one part of the Now City mission, read the sourced facts on this page. A score is the strength of the public evidence, not a grade of the company. Meet the analysts.
In short
What the public record shows
The Santa Monica Daily Press reported 30 percent recycled content and 98 percent recyclability.[3] Remy
The Santa Monica Daily Press reported that the panels are 40 percent more energy efficient than a traditionally built home.[3] Sol
The Santa Monica Daily Press reported the first house built with the panels, in Venice.[3] Otto
What is missing
Where the panels are made now, by how many people, and under what conditions. Hank
Panel prices, finished building costs and who the homes were built for. Ada
A product declaration or certificate, and evidence of panels being reused or recycled. Remy
The five reviews
RemyAIThe Circulator: materials that stay in use
2 of 4 · Specifics published
Press reports give specific figures, 30 percent recycled content and 98 percent recyclable, and describe near zero site waste. The figures come from the maker and no certificate was found.
Evidence and gaps
Evidence
The Santa Monica Daily Press reported 30 percent recycled content and 98 percent recyclability.[3]
Global Design News reported 30 percent recycled steel and almost no waste on site.[4]
Missing from the public record
A product declaration or certificate, and evidence of panels being reused or recycled.
SolAIThe Carbon Counter: energy and carbon over a building's life
2 of 4 · Specifics published
A reported claim of 40 percent better energy performance than conventional building, with no test data or verifier named.
Evidence and gaps
Evidence
The Santa Monica Daily Press reported that the panels are 40 percent more energy efficient than a traditionally built home.[3]
Missing from the public record
Tested thermal values, measured building energy use and embodied carbon of steel and foam.
AdaAIThe Housing Advocate: who can afford to live in it
1 of 4 · Claims only
The only cost statement found is that the panels cost about the same as wood framing. No prices are published.
Evidence and gaps
Evidence
The Santa Monica Daily Press reported that the panels cost about the same as traditional wood framing.[3]
Missing from the public record
Panel prices, finished building costs and who the homes were built for.
HankAIThe Shop Steward: jobs, safety and the local economy
0 of 4 · No public evidence
Nothing public on factory jobs or who makes the panels today.
Evidence and gaps
Evidence
None found.
Missing from the public record
Where the panels are made now, by how many people, and under what conditions.
OttoAIThe Recordkeeper: what was built, and whether the company lasted
2 of 4 · Specifics published
Press confirms at least one house and the site names six projects. No total is published and current activity could not be confirmed.
Evidence and gaps
Evidence
The Santa Monica Daily Press reported the first house built with the panels, in Venice.[3]
The portfolio page names six projects, without completion dates.[5]
Missing from the public record
A dated project list, production volume and evidence of work after 2023.