# Gerdau

Brazilian steelmaker whose venture arm, Gerdau Next Ventures, backs construction, logistics and energy startups.

- **Status:** Active. Its investor site describes current steel operations in seven countries and the Gerdau Next unit. [1]
- **Type:** Corporate
- **Also named as:** No data
- **Headquarters:** São Paulo, Brazil
- **Founded:** 1901
- **Website:** https://ri.gerdau.com/en/ (loaded when checked)
- **Stages:** Seed, Growth
- **Sectors:** Construction technology, logistics, industry 4.0, renewable energy, carbon capture and circular economy
- **Geographies:** Brazil, United States
- **Pillars:** Industrialized Construction, Green Infrastructure
- **Roles in the guide:** Investor
- **Evidence:** Strong
- **Latest fund:** $80 million, 2020 (initial capital of Paris Ventures, as reported by Exame in 2021) [4]

Checked 2026-11-21. Page: https://nowcitylabs.com/fieldguide/construction/investors/gerdau/

## Summary by the Lead Analyst

Gerdau is a Brazilian long steel producer. Its corporate venture program, called Paris Ventures in 2021 press and Gerdau Next Ventures today, co-led Plant Prefab's 2021 Series B, and Gerdau's venture arm led the 2022 Series C. Gerdau also took a third of the Brazilian off-site builder Brasil ao Cubo in 2020. Current fund size and most deal amounts are not public.

Verify first: That Paris Ventures and Gerdau Next Ventures are the same program; no single source read names both.

## What it is

Gerdau traces its history to 1901, when João Gerdau bought a nail factory in Porto Alegre. It makes long and special steel, with plants in seven countries across the Americas, and makes about 70 percent of its steel from scrap. Gerdau Next, launched in 2020, builds and invests in businesses in construction, logistics, infrastructure and renewable energy. [1]
Plant Prefab named Paris Ventures, which it described as the corporate venture capital program of Gerdau, as co-lead of its 30 million dollar Series B in August 2021. [5]
Global Corporate Venturing reported that Gerdau set up its venture unit in 2020 with Touchdown Ventures, which ran it for about two years before Gerdau took it in-house as Gerdau Next Ventures under Arthur Alves, who started in April 2023. Its thesis covers construction, AI for industry and sustainability topics such as solar, wind, green hydrogen and carbon capture. [3]

## Key facts

- Founded: 1901, Porto Alegre [1]
- Headquarters: São Paulo, Brazil [6]
- Venture arm: Gerdau Next Ventures [3]
- Initial venture capital: $80 million (2020) [4]
- Team: Arthur Alves, head of Gerdau Next Ventures [3]

## Card fields

The same eleven fields every investor card, table row and comparison shows. A missing value says why.

- Type: Corporate
- Headquarters: São Paulo, Brazil
- Stages: Seed, Growth
- Focus: Construction technology, logistics, industry 4.0, renewable energy, carbon capture and circular economy
- Pillars: Industrialized Construction, Green Infrastructure
- Portfolio in guide: 1 company: Plant Prefab
- Round sizes in guide: $42 million: the sum of disclosed round or deal sizes on 1 of 1 events that name it, not its own share
- Latest deal: Dec 2022, Plant Prefab
- Roles: Investor
- Evidence: Strong
- Checked: Nov 2026

## Portfolio in the guide

Amounts are the disclosed size of each round or deal, not this investor's share.

- 2022-12, [Plant Prefab](https://nowcitylabs.com/fieldguide/construction/p/plant-prefab.md) (funding, $42 million): Reported $42 million in Series C and other funding, led by the venture arm of steelmaker Gerdau, with debt and equipment financing, to finish the Tejon Ranch factory. Source: https://www.globalconstructionreview.com/us-modular-housing-firm-plant-prefab-secures-42m-for-expansion/

## Notable investments outside the guide

- Brasil ao Cubo (2020): Gerdau put 60 million reais, about 10.5 million dollars, into a Brazilian off-site modular builder for a 33 percent stake. [2]
- Instacasa: Seed round in a Brazilian proptech company, per Global Corporate Venturing. [3]
- Newave Energia: Gerdau Next venture developing about 2.5 GW of solar and wind power, with 30 percent of output for Gerdau mills. [1]

## Sources

1. [History and corporate profile](https://ri.gerdau.com/en/gerdau/history-and-corporate-profile/) (Gerdau)
2. [Brasil ao Cubo gets Gerdau funding](https://globalventuring.com/blog/2020/11/04/brasil-ao-cubo-gets-gerdau-funding/) (Global Corporate Venturing)
3. [Why Brazil's Gerdau chose to take back its CVC](https://globalventuring.com/corporate/overview/why-brazils-gerdau-chose-to-take-back-its-cvc/) (Global Corporate Venturing)
4. [Amazon e Gerdau investem em startup de casas pré-fabricadas](https://exame.com/esg/amazon-gerdau-startup-casas-pre-fabricadas/) (Exame)
5. [Plant Prefab announces $30 million Series B and the opening of a second factory](https://www.plantprefab.com/press-center/Plant-Prefab-Announces-$30-Million-Series-B-and-the-Opening-of-a-Second-Factory) (Plant Prefab)
6. [Gerdau S.A. Form 20-F for 2023](https://sec.gov/Archives/edgar/data/1073404/000110465924040516/ggb-20231231x20f.htm) (US Securities and Exchange Commission)
7. [US modular housing firm Plant Prefab secures $42m for expansion](https://www.globalconstructionreview.com/us-modular-housing-firm-plant-prefab-secures-42m-for-expansion/) (Global Construction Review)
