# Blokable

Developed steel-framed modular apartments for affordable housing, built in a Vancouver, Washington plant.

- **Operating status:** Unverified. The website returned a server error (HTTP 526) on November 19, 2026. The latest coverage found is from November 2022, and no source reports a closure, a sale or current activity. [1][4]
- **Momentum:** Unknown
- **Ownership:** Unknown
- **Headquarters:** Sacramento, California, United States
- **Founded:** 2016
- **Role:** Manufacturer, Developer
- **Method:** Volumetric modules
- **Material:** Other
- **Product:** Room modules
- **Builds:** Multifamily, Affordable housing
- **Website:** https://blokable.com/ (no working site of its own when checked)

Checked 2026-11-19. Page: https://nowcitylabs.com/fieldguide/construction/p/blokable/

## Summary by the Lead Analyst

Blokable, launched in 2016, developed steel-framed modular apartments for affordable housing, built at a 50,000 square foot plant in Vancouver, Washington. The one delivered project on record is 12 apartments in Auburn, Washington, announced in December 2020 at a stated $125,000 per door. Press reported a $23 million round in 2019 and a move to Sacramento. No coverage after November 2022 was found and its website returns an error, so whether it still operates is unconfirmed.

Verify first: Confirm the company still exists: check the Washington and California business registries before any engagement.

## What it is

Blokable designed a steel-structured modular building system and acted as developer and builder of its own projects. A trade profile describes a kit of parts assembled into modules at a warehouse plant in Vancouver, Washington, that could be arranged as anything from single homes to multi-story apartments. [2][5]
Its one completed development in the public record is Blokable at Phoenix Rising, 12 small apartments in Auburn, Washington, announced in December 2020. The company started in Seattle and was described as Sacramento-based by 2022, when it was preparing its system for California codes. [2][4]

## Key facts

- Founded: 2016, per a 2020 company statement [2]
- Headquarters: Sacramento, California (as of 2022); began in Seattle [4]
- Factory: 50,000 sq ft plant in Vancouver, Washington (2018) [7]
- Homes delivered: 12 apartments at Phoenix Rising, Auburn, Washington [2]
- Funding raised: $23 million round reported in December 2019 [3]

## Production and technology

- Production: No data
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: Other
- Products: Room modules
- Building markets: Multifamily, Affordable housing
- Factory: No data
- Markets served: Washington
- Demonstrated scale: 12 homes delivered, 2020
- Annual capacity: No data
- Cost: $125,000 per home, scope not stated, 2020
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Units delivered: 12 homes delivered, 2020 (Company release, apartments at Phoenix Rising, Auburn) [2]
- Price: $125,000 per home, scope not stated, 2020 [2]

## Serves

- Washington (US-WA) [2]

## Timeline

- 2016 (founded): Launched, according to a December 2020 company statement that dates the start four years earlier. [2]
- 2017-10 (funding): The Columbian reported $4.8 million in investments and a planned ramp-up of the Vancouver, Washington operation. [6]
- 2019-12 (funding): Pro Builder reported a $23 million fundraising round, a new corporate office in Sacramento and plans for a California manufacturing facility. [3]
- 2020-03 (milestone): Supplied a quarantine unit for rapid housing with the Washington State Department of Health during the COVID-19 response. [5]
- 2020-12 (milestone): Announced Blokable at Phoenix Rising: 12 apartments of 280 to 340 square feet in Auburn, Washington, at a stated $125,000 per door. [2]
- 2022-11 (milestone): A Modular Building Institute article described the company as Sacramento-based and working to meet California structural and energy codes. [4]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No public evidence on factory waste, reused materials or disassembly of the steel modules was found as of November 2026.

- Gap: Waste figures, material sourcing and any plan for disassembly or reuse of modules.

### Energy and Carbon: Specifics published (level 2)

The December 2020 Phoenix Rising release lists all-electric systems and energy recovery ventilation and projects 60 percent less heating and cooling energy. A 2022 trade article cites a National Renewable Energy Laboratory report. No metered data from the building was found.

- Evidence: The Phoenix Rising announcement lists all-electric systems, an efficient envelope and energy recovery ventilation, and projects 60 percent less heating and cooling energy. [2]
- Evidence: A Modular Building Institute article says a National Renewable Energy Laboratory report on the company pointed toward all-electric, net-zero multifamily housing. [4]
- Gap: Metered energy data from Phoenix Rising, the lab report itself, and any embodied carbon figure.

### Cost and Access: Third-party evidence (level 3)

One affordable project is documented by the company and a trade body: 12 apartments in Auburn, Washington, announced December 2020, for residents at about 30 percent of area median income, at a stated $125,000 per door. No second delivered project was found.

- Evidence: Phoenix Rising has 12 apartments for people earning about 30 percent of area median income; the state paid $125,000 per door and the total cost was $1.5 million. [2]
- Evidence: The Modular Building Institute describes the project as built for Valley Cities, a nonprofit behavioral health provider, with a state capital budget appropriation. [4]
- Gap: Any second project, resident outcomes, and costs confirmed by the funder rather than the company.

### Workforce: No public evidence (level 0)

No public figure exists for the Vancouver, Washington plant workforce or for what happened to it. No layoff notice was found as of November 2026.

- Gap: Headcount, wages, training, safety records and any layoff notices.

### Delivery Record: Third-party evidence (level 3)

Press and a trade body confirm one 12-unit project (2020) and funding reports of $4.8 million (2017) and $23 million (2019). The website returned an error on November 19, 2026 and no coverage after November 2022 was found, so current status is unconfirmed.

- Evidence: Pro Builder reported a $23 million round in December 2019. [3]
- Evidence: The 12-unit Phoenix Rising project is described by both the company and the Modular Building Institute. [2][4]
- Gap: Any building delivered in California, any news after 2022, and a filing or notice showing the company is active or dissolved.

## Sources

1. [Blokable home page (returned HTTP 526, did not load)](https://blokable.com/) (Blokable)
2. [Blokable Unveils Phoenix Rising](https://www.prnewswire.com/news-releases/blokable-unveils-phoenix-rising-the-worlds-first-vertically-integrated-modular-housing-development-providing-high-quality-energy-efficient-housing-at-less-than-half-the-seattle-regions-average-cost-per-door-301193353.html) (PR Newswire (Blokable release))
3. [Off-site Start-up Blokable Expands to California Market Following $23 Million Fundraising Round](https://www.probuilder.com/construction/off-site-construction/modular/article/55215362/off-site-start-up-blokable-expands-to-california-market-following-23-million-fundraising-round) (Pro Builder)
4. [Affordable Housing Reimagined](https://www.modular.org/2022/11/15/affordable-housing-reimagined/) (Modular Building Institute)
5. [Blokable](https://housinginnovation.co/collaborative/blokable/) (Housing Innovation Collaborative)
6. [Building blocks at Blokable may change industry](https://columbian.com/news/2017/oct/01/building-blocks-at-blokable-may-change-industry) (The Columbian)
7. [Blokable builds on idea](https://columbian.com/news/2018/jun/17/blokable-builds-on-idea) (The Columbian)