Blumer Lehmann began as Leonhard Lehmann's sawmill at Erlenhof near Gossau in 1875. It bought Blumer Elementtechnik in 1997, merged with it in 2000 and added Wey Modulbau in 2005. It works across the timber chain: a sawmill, planing and finger-jointing mills, laminated timber, CLT and panel products, pellets from residues, timber engineering, modular buildings, silos and free-form structures such as the Swatch headquarters in Biel. Its modules are built in weather-protected halls.[2][9][10]
At Erlenhof the sawmill cut a record of about 174,000 cubic meters of round timber in 2022 to 2023, three new halls expanded framing, element and module production, and a laminating facility was due from 2025. Abroad it opened a sales site in Luxembourg in 2019, an office in Grafschaft and a rented assembly hall in Großenlüder in 2021, and bought oa.sys baut of Alberschwende, Austria, in 2023.[1][2][6]
In June 2026 the company said its new plant in Steinau an der Strasse, Hesse, will start in January 2027 with wall, floor and ceiling lines and module assembly, designed for 400 modules a year and expandable to two or three times that, with about 40 staff. It says its modules can be taken apart and reused thanks to their connection system. Frutiger Unternehmungen agreed in August 2025 to buy 30 percent of the holding company, with a full takeover planned by 2029.[4][5][7][8]