# Broad Sustainable Building

Makes stainless steel building modules in Changsha, China that ship at the size of a 40-foot container.

- **Operating status:** Active. The BROAD Group site is live and lists modular building among its businesses, with a United States section. [1]
- **Momentum:** Unknown
- **Ownership:** Part of BROAD Group
- **Headquarters:** Changsha, Hunan, China
- **Founded:** 2009
- **Role:** Manufacturer
- **Method:** Volumetric modules
- **Material:** Other
- **Product:** Room modules
- **Builds:** Multifamily, Commercial, Emergency shelter
- **Website:** https://en.broad.com/ (loaded when checked)

Checked 2026-11-20. Page: https://nowcitylabs.com/fieldguide/construction/p/broad-sustainable-building/

## Summary by the Lead Analyst

The modular building arm of BROAD Group of Changsha, founded in 2009. Its Holon system uses stainless steel sandwich slabs and modules that travel as 40-foot containers and unfold on site. A trade body profile reports an 11-floor, 56-module building in Changsha and hospital isolation rooms delivered to Seoul. The same source reports a plan for 80 United States cities and future United States factories. No building delivered in the United States or Canada was found in the sources read.

Verify first: Whether any Holon building has been permitted and built in North America, and the price per square foot delivered.

## What it is

BROAD Group was founded in China in 1988 and incorporated a United States company in 1997. Its modular arm, BROAD Sustainable Building, was founded in 2009. The Modular Building Institute reports that all of its factories are in Changsha, Hunan, and that its automated line produced 22,000 square feet a day with a plan to reach 110,000. [2]
Its Holon Building is a mid-rise and high-rise residential system built from B-CORE, a sandwich of stainless steel plates and tubes. Modules are 40 feet long, 8 feet wide and 10 feet high, the size of a high-cube shipping container, and fold out to 16 feet wide on site, with services and interior fixtures installed in the factory. The first example, in Changsha, is an 11-floor apartment building of 56 modules made in 15 days and stacked in under 29 hours. [2]
The Modular Building Institute also reports turnkey negative-pressure isolation rooms built for Seoul National University Hospital in 23 days from contract, and a company plan to place Holon buildings in 1,000 cities, 80 of them in the United States. It says B-CORE slabs are made in the Chinese factories and shipped to destination markets, and that the company plans factories in those markets, including the United States, with no date given. [2][3]

## Key facts

- Founded: 2009; parent BROAD Group founded 1988 [2]
- Headquarters: BROAD Town, Changsha, Hunan, China [1]
- Factory: Changsha; 22,000 sq ft a day, per a trade body [2]
- Ownership: Modular arm of BROAD Group [2]

## Production and technology

- Production: Large central factory, All factories in Changsha; slabs shipped to destination markets [2]
- Technology: Automated production, Automated line producing 22,000 sq ft a day [2]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: Other
- Products: Room modules
- Building markets: Multifamily, Commercial, Emergency shelter
- Factory: Changsha, China
- Markets served: China, South Korea
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Factories

- Changsha, Hunan, China: All factories are in Changsha, per the Modular Building Institute [2]

## Serves

- China (CN) [2]
- South Korea (KR) [2]

## Timeline

- 1988 (founded): BROAD Group was founded in China. [2]
- 1997 (milestone): BROAD incorporated a company in the United States. [2]
- 2009 (founded): BROAD Sustainable Building was founded as the group's modular arm. [2]
- 2010 (milestone): Completed its first building, per the Modular Building Institute. [2]
- 2019 (milestone): Completed the group's 16-floor, 81,000 square foot F Building in Changsha using B-CORE. [2][3]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Claims only (level 1)

The company presents stainless steel B-CORE as its structural material. No recycled content figure, factory waste figure or disassembly record was found.

- Evidence: A trade body profile describes B-CORE as a sandwich of stainless steel plates and tubes used for the structure. [2]
- Gap: Recycled content of the steel, factory waste, and any building that has been taken apart and moved.

### Energy and Carbon: Specifics published (level 2)

A trade body profile carries the company's figures: 8.5 inches of rockwool in exterior walls and a claim of 80 to 90 percent lower energy use. No measured data or independent verifier is cited.

- Evidence: The Modular Building Institute profile reports 8.5 inches of rockwool insulation and a claimed 80 to 90 percent lower energy use. [2]
- Gap: Measured energy use of an occupied Holon building and an embodied carbon figure for stainless steel structure.

### Cost and Access: No public evidence (level 0)

No price and no affordable housing delivery was found in the sources read.

- Gap: Price per square foot delivered, and who lives in the Changsha buildings.

### Workforce: No public evidence (level 0)

No headcount, training or safety information for the modular business was found in the sources read.

- Gap: Factory workforce and safety record.

### Delivery Record: Specifics published (level 2)

A trade body profile reports an 11-floor, 56-module building and an office building in Changsha, and hospital rooms delivered in Seoul. The figures originate with the company. No North American delivery was found.

- Evidence: The Modular Building Institute profile reports the 56-module Changsha building, made in 15 days and stacked in under 29 hours. [2]
- Evidence: The same source reports isolation rooms for Seoul National University Hospital. [2]
- Gap: A count of buildings delivered, any export beyond South Korea, and United States state approvals.

## Sources

1. [BROAD Group home page](https://en.broad.com/) (BROAD Group)
2. [Innovating in Modular Construction: BROAD's Holon Building](https://www.modular.org/2021/08/29/innovating-in-modular-construction-broads-holon-building) (Modular Building Institute)
3. [B-CORE: The Modern Material from BROAD](https://www.modular.org/2021/10/28/b-core-the-modern-material-from-broad) (Modular Building Institute)