# Cadolto

German maker of steel-framed modular hospitals, labs and data centers, built in two plants in Bavaria and Thuringia.

- **Operating status:** Active. Its site is live, names plants at Cadolzburg and Krölpa, about 260 staff and Zech Group ownership since 2018; its latest news item is dated September 2024. [1][2]
- **Momentum:** Unknown
- **Ownership:** Part of Zech Group
- **Headquarters:** Cadolzburg, Bavaria, Germany
- **Founded:** 1890
- **Role:** Manufacturer, General contractor
- **Method:** Volumetric modules
- **Material:** Other
- **Product:** Room modules
- **Builds:** Commercial, Senior housing
- **Website:** https://www.cadolto.com/ (loaded when checked)

Checked 2026-11-26. Page: https://nowcitylabs.com/fieldguide/construction/p/cadolto/

## Summary by the Lead Analyst

A German modular builder with roots in an 1890 wagon works, part of the Zech Group since 2018. It makes steel column and beam modules for hospitals, operating theaters, labs and data centers at Cadolzburg and Krölpa, and reports about 260 staff, 790 projects and more than 20,000 square meters a year. A 31-module, 99-bed ward for Magdeburg University Hospital is one documented job. No price, carbon or recent output figure was found.

Verify first: Current output and order book, since the site's news stops in September 2024.

## What it is

Cadolto plans and builds modular buildings and hands them over turnkey, with medical, lab and building services, bathrooms and built-in furniture installed in the factory. Modules use column and beam steel structures and can be up to 100 square meters each. Its main market is hospitals and clinics, sold or rented, along with laboratories, offices, schools, data centers, telecom stations and a senior residence. [1][3][4][5][6]
The business began as a wagon maker in 1890, built its first room module in 1972 and its first modular clinic in 1986, and joined the Zech Group in 2018. It reports two German plants, Cadolzburg near Nuremberg and Krölpa in Thuringia, about 260 employees, 790 projects worldwide and average output of more than 20,000 square meters of floor area a year. [1][2][3]
In 2020 it won a contract for a three-story, 31-module ward building with 99 beds at Magdeburg University Hospital, due for handover in spring 2021. In 2022 it handed over a modular operating theater building in Viersen, and in 2023 and 2024 it reported lab buildings for the University of Bonn and the Heidelberg Innovation Park. [5][6]

## Key facts

- Founded: 1890 as a wagon maker; first module 1972 [2]
- Headquarters: Cadolzburg, Bavaria, Germany [6]
- Factory: Cadolzburg and Krölpa, Germany [1]
- Employees: About 260, per the company [2]
- Ownership: Zech Group since 2018 [2]
- Output: Over 20,000 sq m of floor area a year, average [2]

## Production, technology and cost

- Production: Large central factory, Two German plants shipping modules of up to 100 sq m [3]
- Technology: No data
- Cuts cost through: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: Other
- Products: Room modules
- Building markets: Commercial, Senior housing
- Factory: Cadolzburg, Germany; Krölpa, Germany
- Markets served: Germany, Italy, Switzerland
- Demonstrated scale: 790 projects delivered, 2026
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Units delivered: 790 projects delivered, 2026 (company-reported projects realized worldwide) [2]

## Factories

- Cadolzburg, Bavaria, Germany: Production site near Nuremberg [1]
- Krölpa, Thuringia, Germany: Werk Thüringen [1][3]

## Serves

- Germany (DE) [5]
- Italy (IT) [5]
- Switzerland (CH) [7]

## Timeline

- 1890 (founded): Founded as a wagon-making business in Cadolzburg. [2]
- 1972 (milestone): Built its first room module. [2]
- 1986 (milestone): Built its first clinic in modular construction. [2]
- 2004 (milestone): Between 2004 and 2007 built 11 clinics in Russia, per the company. [2]
- 2018 (acquisition): Became part of the Zech Group. [2]
- 2020-07 (milestone): Won a contract for a 31-module, 99-bed ward building at Magdeburg University Hospital. [6]
- 2022-12-12 (milestone): Handed over a modular operating theater building in Viersen. [5]
- 2024-09 (milestone): Published a film on its lab rotation building for the University of Bonn. [5]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4.

### Materials and Circularity: Specifics published (level 2)

The company says about 30 percent of its buildings are reused at another site, and names a four-story ward at Klinikum Kulmbach erected in 2016, dismantled in 2019 and reused in two other clinic projects. No waste or recovery tonnage is published.

- Evidence: The modular construction page says about 30 percent of buildings are reused elsewhere. [3]
- Evidence: The Kulmbach interim ward was dismantled in 2019 and reused at two other sites. [4]
- Gap: Factory waste figures and a third-party account of reused modules.

### Energy and Carbon: Claims only (level 1)

A 2020 project release describes a green roof, ventilated facade and district heating connection for the Magdeburg ward. No energy rating, embodied carbon figure or certification was found.

- Evidence: The Magdeburg release lists a green roof and district heating as energy measures. [6]
- Gap: Embodied carbon per module and certified energy performance.

### Cost and Access: No public evidence (level 0)

No prices were found, and the company's work is mainly hospitals, labs and data centers rather than homes.

- Gap: Prices, rental rates and any housing delivered.

### Workforce: Specifics published (level 2)

The company reports about 260 employees, about 130 of them in design, engineering, sales and administration. Its own news page says its module builders received the BGHM Schlaue Fuchs workplace safety award in 2022; no insurer or press source confirming it was read.

- Evidence: The company page gives about 260 employees. [2]
- Evidence: A November 2022 news item reports the BGHM Schlaue Fuchs safety award. [5]
- Gap: Dated plant headcount, injury rates and a third-party record of the safety award.

### Delivery Record: Specifics published (level 2)

The company reports 790 projects and names dated jobs, including a 31-module ward in Magdeburg contracted in 2020 for handover in spring 2021 and an operating theater in Viersen handed over in December 2022. These are company statements; no filing or press confirmation was read.

- Evidence: The company page cites 790 projects realized worldwide. [2]
- Evidence: The Magdeburg release gives 31 modules and 2,304.66 sq m of gross floor area. [6]
- Gap: Revenue, modules per year and independent confirmation of recent projects.

## Sources

1. [Cadolto home page](https://www.cadolto.com/) (Cadolto Modulbau)
2. [Unternehmen](https://www.cadolto.com/cadolto-unternehmen/) (Cadolto Modulbau)
3. [Modulbau](https://www.cadolto.com/cadolto-modulbau/) (Cadolto Modulbau)
4. [Nachhaltigkeit](https://www.cadolto.com/nachhaltigkeit/) (Cadolto Modulbau)
5. [Aktuelles](https://www.cadolto.com/aktuelles2/) (Cadolto Modulbau)
6. [Cadolto erhält Auftrag zur Realisierung eines Bettenhauses am Universitätsklinikum in Magdeburg](https://www.zech-group.com/fileadmin/images/Newsroom/Presse/PDF_Pressemitteilungen/Cadolto_UniklinikumMagdeburg.pdf) (Zech Group)
7. [Cadolto ist neues Mitglied des CBI](https://zech-group.com/fileadmin/images/Newsroom/Presse/PDF_Pressemitteilungen/Cadolto_Cadolzburg.pdf) (Zech Group)