# Blufab (Casais Group)

Offsite unit of the Portuguese builder Casais, making pre-equipped walls and MEP elements in Braga for timber-hybrid buildings.

- **Operating status:** Active. Its site is live and Casais lists it among the companies of the Offsite & Technology Hub that the group opened in Braga on October 9, 2026. [1][2][5]
- **Momentum:** Expanding
- **Ownership:** Part of Grupo Casais
- **Headquarters:** Braga, Braga District, Portugal
- **Role:** Manufacturer, Supplier
- **Method:** Panels
- **Material:** Mass timber, Concrete
- **Product:** Panels, Components
- **Builds:** Affordable housing, Student housing, Hospitality, Multifamily
- **Website:** https://www.blufab.pt/ (loaded when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/casais-blufab/

## Summary by the Lead Analyst

Blufab is the offsite construction unit of Grupo Casais, a family-owned Braga builder with about 1,018 million euros of 2025 revenue. It supplies sites with factory-made MEP systems and pre-equipped walls for timber-hybrid buildings and sits in the Offsite & Technology Hub Casais opened in Braga in October 2026. Casais claims over 60 percent lower carbon and about half the build time. No output, headcount, plant size or price for Blufab itself is published.

Verify first: Whether Blufab is a separate legal company and what it produces each year, since sources describe it only as a unit of Casais.

## What it is

Casais describes Blufab as its offsite construction unit, supplying building sites with elements made and assembled in a factory. Blufab's own site lists MEP systems, pre-equipped walls and complete solutions, and gives an address in Padim da Graça, Braga. The name Blufab is the one used by Casais, its own site and national press; no source read gives a separate legal company name or founding year, so this record uses the unit name with the group. [1][2][4]
When Prime Minister António Costa visited in May 2023, Casais said the system cuts carbon footprint by more than 60 percent through engineered timber and uses a third of the concrete of a conventional building, and shortens construction by about 50 percent. Casais chief executive António Carlos Rodrigues said the group targets controlled-cost housing and student residences. Its example was a B&B hotel in Guimarães that Casais called the first hybrid building in the Iberian Peninsula. That year Casais became the third shareholder of the Austrian timber builder Cree, with the Zech and Rhomberg groups. [3][4]
On October 9, 2026 Casais opened the Offsite & Technology Hub in Braga, an industrial and technology facility that combines offsite production and component integration and showed a robotic micro-factory. Blufab is listed among nine group companies there. Casais reported about 1,018 million euros of revenue in 2025 and work in 18 countries. [1][5]

## Key facts

- Headquarters: Padim da Graça, Braga, Portugal [2]
- Factory: Casais Offsite & Technology Hub, Braga (2026) [1][5]
- Ownership: Unit of Grupo Casais, a family-owned builder [1][3]

## Production and technology

- Production: No data
- Technology: Robotics, Robotic micro-factory shown at the Braga hub opening in 2026 [5]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Panels
- Materials: Mass timber, Concrete
- Products: Panels, Components
- Building markets: Affordable housing, Student housing, Hospitality, Multifamily
- Factory: Braga, Portugal
- Markets served: No data
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Thin · Checked Nov 2026

## Factories

- Braga, Braga District, Portugal: Casais Offsite & Technology Hub, opened October 2026 [1][5]

## Timeline

- 2023-05 (milestone): Prime Minister António Costa visited Blufab in Braga; Casais presented its offsite system for controlled-cost housing and student residences. [3][4]
- 2023-05 (milestone): Press reported that Casais had become the third shareholder of the timber builder Cree, alongside the Zech and Rhomberg groups. [4]
- 2026-10-09 (factory): Casais opened the Offsite & Technology Hub in Braga, housing Blufab and eight other group companies. [1][5]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Claims only (level 1)

Casais describes its Guimarães hybrid hotel as using a carbon-storing biomaterial in a circular economy approach. No waste, reuse or disassembly figure for Blufab was found.

- Evidence: The 2023 release describes a bio-based material used in a circular economy approach. [3]
- Gap: Factory waste data, timber sourcing and any reuse of Blufab elements.

### Energy and Carbon: Specifics published (level 2)

Casais states that its offsite system cuts carbon footprint by more than 60 percent and uses a third of the concrete of a conventional building (May 2023). No baseline, project calculation or verifier was published.

- Evidence: Over 60 percent lower carbon footprint and one third of the concrete, per Casais. [3]
- Gap: A life cycle assessment or EPD for a Blufab building, checked by a third party.

### Cost and Access: Claims only (level 1)

Casais says the system targets controlled-cost housing and student residences, but no price, cost per square meter or count of affordable homes built with Blufab elements was found.

- Evidence: The chief executive said the group builds industrial solutions into controlled-cost housing and student residences. [3]
- Gap: Prices and named affordable or student projects that used Blufab elements, with unit counts.

### Workforce: No public evidence (level 0)

No source read gives Blufab's headcount, training or safety data.

- Gap: Number of factory workers and safety records.

### Delivery Record: Claims only (level 1)

Sources name one Casais hybrid project, a B&B hotel in Guimarães, but do not say which elements Blufab made. No count of buildings or elements produced was found.

- Evidence: The Guimarães B&B hotel was cited as an example of Casais hybrid construction. [3][4]
- Gap: Elements or buildings delivered by Blufab per year and its founding date.

## Sources

1. [Industrialization and off-site](https://casais.pt/en/innovation/industrialization-and-off-site/) (Casais)
2. [Blufab home page](https://www.blufab.pt/) (Blufab)
3. [Primeiro-Ministro visita a Blufab, unidade pioneira em construção off-site sustentável do Grupo Casais](https://casais.pt/wp-content/uploads/2023/05/PR_PM-Visita-Grupo-Casais.pdf) (Casais)
4. [Empresa de Braga propõe construção à prova de inflação e taxas de juros](https://eco.sapo.pt/2023/05/03/empresa-de-braga-propoe-construcao-a-prova-de-inflacao-e-taxas-de-juros/) (ECO)
5. [Grupo Casais inaugura hub tecnológico dedicado à construção](https://www.portugalglobal.pt/pt/noticias/2026/outubro/grupo-casais-inaugura-hub-tecnologico-dedicado-a-construcao/) (Portugal Global (AICEP))