# China Construction Science and Industry Corporation

CSCEC steel structure arm that makes steel MiC modules on an automated line in Huizhou for Hong Kong public housing and export.

- **Operating status:** Active. Its manufacturing bases page claims nine plants and names eight, including an Egypt plant opened in 2024, and its overview names CSCEC as parent. [3][2]
- **Momentum:** Expanding
- **Ownership:** Part of China State Construction Engineering Corp. Ltd. (CSCEC)
- **Headquarters:** Shenzhen, Guangdong, China
- **Role:** Manufacturer, Builder, General contractor
- **Method:** Volumetric modules, Kit of parts
- **Material:** Other
- **Product:** Room modules, Structural kits
- **Builds:** Multifamily, Affordable housing
- **Website:** https://sstr.cscec.com/english/ (loaded when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/china-construction-science-and-industry/

## Summary by the Lead Analyst

The steel structure arm of CSCEC, based in Shenzhen, with steel plants in China, Dubai, Algeria and Egypt rated at over 1.2 million metric tons a year. Its Huizhou plant runs an automated steel module line that Xinhua reports at about 50 modules a day. The Hong Kong government confirms an order of about 9,300 MiC modules for Light Public Housing, and the first estate, Yau Pok Road, was occupied in 2025. No waste, carbon, price or headcount figures were found.

Verify first: Whether the 50 modules a day line rate, given by a company engineer, holds over a full year of output.

## What it is

China Construction Science and Industry, which calls itself CSCEC Science and Industry, is headquartered in Shenzhen and is part of China State Construction Engineering Corp. It works in steel structure contracting, general contracting, green building and new energy products. Its site lists plants in Huizhou, Tianjin, Wuhan, Meishan and Jiangyin in China and in Dubai, Algeria and Egypt, with combined capacity of over 1.2 million metric tons of steel a year. [3]
Xinhua reported in August 2026 that the Huizhou plant runs a fully automated steel module line over 400 meters long, building each room as six faces on parallel sub-lines with welding, assembly and grinding robots. A chief engineer of the green technology subsidiary put output at about 50 modules a day. Modules ship through Dongguan port to projects including an apartment building in New South Wales, and the company installed 101 ward modules and 168 equipment modules for a Shenzhen hospital in 12 days. [4]
In Hong Kong, the government says the company was commissioned to make about 9,300 MiC modules for Light Public Housing at Yau Pok Road, Tuen Mun Area 3A and Choi Hing Road. The company reports the Yau Pok Road estate, 1,767 homes of 14 square meters and 389 of 26 square meters, was occupied on March 28, 2025. [5][6]

## Key facts

- Headquarters: Shenzhen, Guangdong [2]
- Factory: Nine plants claimed; modular line in Huizhou [3][4]
- Ownership: Part of CSCEC [2]
- Serves: Hong Kong, Mainland China, Australia [4][5]

## Production and technology

- Production: Large central factory, Huizhou modules shipped overseas through Dongguan port [4]
- Technology: Robotics, Welding, assembly and grinding robots with AGVs in Huizhou [4]
- Technology: Automated production, 400 meter automated steel module line [4]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules, Kit of parts
- Materials: Other
- Products: Room modules, Structural kits
- Building markets: Multifamily, Affordable housing
- Factory: 6 factories: Huizhou, China; Tianjin, China; Wuhan, China and 3 more
- Markets served: Hong Kong, China, Australia
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Order backlog: 9,300 modules on order, 2024 (Hong Kong government, about 9,300 MiC modules for Light Public Housing) [5]

## Factories

- Huizhou, Guangdong, China: Huiyang district; steel modular line; 400,000 sq m of land [3][4]
- Tianjin, China: Xiqing district steel plant, 300,000 metric tons a year [3]
- Wuhan, Hubei, China: Steel plant, 250,000 metric tons a year [3]
- Meishan, Sichuan, China: Steel plant, 220,000 metric tons a year [3]
- Jiangyin, Jiangsu, China: Steel plant, 220,000 metric tons a year [3]
- Dubai, United Arab Emirates: Jebel Ali, opened 2021, 8,000 metric tons a year [3]

## Serves

- Hong Kong (HK) [5]
- China (CN) [4]
- Australia (AU) [4]

## Timeline

- 2019 (factory): Opened a steel plant in northern Algeria, 90 km from the port of Algiers. [3]
- 2021 (factory): Opened a steel plant in the Jebel Ali Industrial Area, Dubai. [3]
- 2024 (factory): Opened a steel plant in the TEDA Suez Canal zone in Egypt, rated at 14,000 metric tons a year. [3]
- 2024-03-25 (milestone): Hong Kong's Secretary for Housing inspected the Huizhou plant making about 9,300 MiC modules for Light Public Housing. [5]
- 2025-03-28 (milestone): Residents moved into Light Public Housing at Yau Pok Road, Yuen Long, built with its MiC modules. [6]
- 2026-04 (milestone): Its news page reported a dual certification for the EU and UK markets. [1]
- 2026-08 (milestone): Received CSA A277 certification for factory-built buildings for the Canadian market. [7]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Claims only (level 1)

The company says its MiC method reduces construction waste and moves over 95 percent of work into factories, with no waste figure. No offcut, recycling or disassembly data was found.

- Evidence: The 2025 Yau Pok Road release says the method reduces construction waste without a figure. [6]
- Gap: Steel scrap rates at Huizhou and whether the five-year Light Public Housing modules will be reused.

### Energy and Carbon: No public evidence (level 0)

No energy standard, emissions or embodied carbon figure for the modules or plants was found in the sources read.

- Gap: Embodied carbon per module and plant energy use.

### Cost and Access: Third-party evidence (level 3)

The Hong Kong government confirms the company makes about 9,300 MiC modules for Light Public Housing. The company reports Yau Pok Road, 2,156 small flats, occupied in March 2025. No cost per home was found.

- Evidence: A March 2024 government release names the company and the three Light Public Housing sites. [5]
- Evidence: The company gives 1,767 flats of 14 square meters and 389 of 26 square meters at Yau Pok Road. [6]
- Gap: Cost per flat and rent paid by residents.

### Workforce: Claims only (level 1)

A company engineer told Xinhua an Australian project needed less than half the usual site workforce. The company claims Hong Kong site labor cost at 30 percent of conventional. No headcount, factory jobs or safety data was found.

- Evidence: Xinhua quotes a chief engineer on site labor below half of a conventional crew in New South Wales. [4]
- Evidence: The 2025 Yau Pok Road release puts on-site worker cost at 30 percent of conventional Hong Kong construction. [6]
- Gap: Employees at the Huizhou plant and safety record.

### Delivery Record: Third-party evidence (level 3)

The Hong Kong government and Xinhua confirm the Huizhou plant, the 9,300 module order and a Shenzhen hospital installed in 12 days. The company names eight steel plants. No total count of modules delivered was found.

- Evidence: Xinhua reports 101 ward and 168 equipment modules installed at Shenzhen People's Hospital Bao'an Hospital in 12 days. [4]
- Evidence: The manufacturing bases page gives capacity of over 1.2 million metric tons across its plants. [3]
- Gap: Modules produced per year and buildings completed.

## Sources

1. [CSCEC Science and Industry English home page](https://sstr.cscec.com/english/) (CSCEC Science and Industry)
2. [Overview](https://sstr.cscec.com/english/AboutUs/Overview/) (CSCEC Science and Industry)
3. [Manufacturing Bases](https://sstr.cscec.com/english/AboutUs/ManufacturingBases/) (CSCEC Science and Industry)
4. [Huizhou steel modular smart factory report](https://www.news.cn/fortune/20260805/905e318c71cb479d9df9cdc96fe12b1b/c.html) (Xinhua)
5. [S for Housing conducts visit to Huizhou to inspect production progress of Light Public Housing MiC modules](https://www.info.gov.hk/gia/general/202403/25/P2024032500352.htm) (Hong Kong SAR Government)
6. [Hong Kong's first light public housing estate is officially open for occupancy](https://sstr.cscec.com/english/News/202504/3868366.html) (CSCEC Science and Industry)
7. [CSCEC Science and Industry receives CSA A277 modular product certification](https://sstr.cscec.com/english/News/202608/3955569.html) (CSCEC Science and Industry)
