CIMC Modular Building Systems designs and manufactures volumetric modules that leave the factory fitted out. Its site lists a steel system and a concrete system, each described as suited to buildings of up to 40 floors, and projects that include hotels, apartments, student housing, public housing, mining camps and senior living.[1]
It is a division of CIMC Group, the Chinese container and transport equipment maker. A 2022 CIMC release said the group had started more than 100 module projects in markets including the United States, Britain, the Netherlands, Australia, New Zealand, Japan, Norway and Hong Kong. The company site now counts more than 200 projects.[1][3]
Its documented United States project is the citizenM hotel on the Meta campus in Menlo Park, California: 161 modules holding 240 rooms over five floors. CIMC said the modules were built and shipped in under five months. Hotel Management Network reported that the modules were designed for seismic design category E and that the project followed LEED Gold.[2][3]