# Clever Core

Fletcher Building's Auckland plant that made wall, floor and roof panels for house cores; closed in 2025.

- **Operating status:** Closed in 2025. Fletcher Building said in March 2025 it would close Clever Core by June 30, 2025 because the volumes needed to be viable had not materialized. [3][4]
- **Momentum:** Contracting
- **Ownership:** Part of Fletcher Building
- **Headquarters:** Wiri, Auckland, New Zealand
- **Role:** Manufacturer
- **Method:** Panels
- **Product:** Panels
- **Builds:** Single-family
- **Website:** https://fletcherbuilding.com/news/fletcher-building-opens-new-zealands-largest-offsite-home-manufacturing-facility (no working site of its own when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/clever-core/

## Summary by the Lead Analyst

Fletcher Building's offsite unit opened a NZ$15 million panel plant in Wiri, Auckland in 2019 with a stated capacity of 500 home cores a year and 35 jobs. Fletcher closed it by June 2025, saying volumes never reached viable levels; its housing head cited design lock-in before consent, cyclical demand and stalled Kainga Ora work. No count of homes actually supplied was found.

Verify first: How many home cores the plant actually produced before it closed, which no source read reports.

## What it is

Clever Core made the wall, floor and roof panels that form the weathertight core of a house, with insulation, double glazing and allowances for wiring and plumbing fitted in the factory. Trained builders assembled the cores on site. Fletcher said this cut on-site build time by 60 percent and waste by up to 80 percent per home. [1][2]
Fletcher Building opened the Wiri plant in October 2019 with 35 positions and a stated capacity of at least 500 homes a year, first supplying its own developments at Ormiston, Swanson and Beachlands. Press reported the investment as NZ$15 million. [1][2][3]
In March 2025 Fletcher said the plant would close by June 30, 2025 and that a PlaceMakers frame and truss plant would take over the site. [3][4]

## Key facts

- Ownership: Fletcher Building [1]
- Factory: Wiri, Auckland, about 5,000 sq m [3]
- Employees: Up to 35 [3]
- Serves: Auckland, New Zealand [2]
- Closed: By June 30, 2025 [3]

## Production and technology

- Production: Large central factory, One Wiri plant serving Fletcher's Auckland developments [1]
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Panels
- Materials: No data
- Products: Panels
- Building markets: Single-family
- Factory: Wiri, New Zealand
- Markets served: New Zealand
- Demonstrated scale: No data
- Annual capacity: 500 homes a year, reported 2019
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Capacity per year: 500 homes/yr capacity, reported 2019 (company-stated capacity at opening, at least 500 home cores a year) [1]
- Plant capital: 15,000,000 NZD to build one plant, 2019 (investment stated by Fletcher's then chief executive, reported by NZ Herald) [3]
- Factory floor area: 53,820 sq ft factory floor area [3]

## Factories

- Wiri, Auckland, New Zealand: 53,820 sq ft, About 5,000 sq m leased; opened 2019, closed by June 2025 [3]

## Serves

- New Zealand (NZ) [2]

## Timeline

- 2017-08-23 (milestone): Fletcher erected its first house built in a day, a three-bedroom home at Hobsonville. [5]
- 2019-10-16 (factory): Fletcher Building opened the Clever Core plant in Wiri, Auckland, with capacity for at least 500 homes a year. [1][2]
- 2025-03-31 (closure): Fletcher announced the plant would close by June 30, 2025, with staff to be redeployed where possible and a PlaceMakers frame and truss plant to use the site. [3][4]

## What public reporting says happened

- Fletcher said the volumes needed to be commercially viable never materialized, citing the market downturn and the industry's reluctance to adopt offsite manufacturing at scale. [3]
- Its housing head said offsite designs must be fixed before building and often resource consent, and that consent delays and weather made production hard to plan. [5]
- He said internal demand was steady but the business needed government guarantees of demand, and demand dried up when Kainga Ora work stalled. [5]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Specifics published (level 2)

Fletcher claimed up to 80 percent less waste per home in 2019; RNZ reported timber offcuts burned as fuel at the Golden Bay Cement plant and insulation offcuts reused. No measured waste figure was published.

- Evidence: RNZ reported offcuts used as fuel at Golden Bay Cement and insulation offcuts reused. [2]
- Gap: Measured waste per home and any audit of the 80 percent claim.

### Energy and Carbon: No public evidence (level 0)

No energy rating or carbon figure for homes built with the panels was found in the sources read.

- Gap: Energy performance and embodied carbon of the house cores.

### Cost and Access: Claims only (level 1)

The first 100 homes were planned for Fletcher developments at Ormiston, Swanson and Beachlands by the end of 2019. No price, affordable home count or delivered total was found.

- Evidence: RNZ reported the first 100 homes were due by the end of 2019 for three Auckland developments. [2]
- Gap: How many homes were built and at what price.

### Workforce: Specifics published (level 2)

The plant opened with 35 positions, some filled through a first-time job seeker program. At closure in 2025 Fletcher said it aimed to redeploy as many staff as possible; how many were redeployed was not reported.

- Evidence: Fletcher's 2019 release states 35 positions and the Switch Up recruitment program. [1]
- Evidence: NZ Herald reported the redeployment aim at closure. [3]
- Gap: How many workers were redeployed or lost jobs in 2025.

### Delivery Record: Third-party evidence (level 3)

Named press confirms the October 2019 opening, the NZ$15 million cost and the March 2025 decision to close by June 30, 2025. No total of homes produced over its life was found.

- Evidence: RNZ reported the 2019 opening. [2]
- Evidence: NZ Herald and BusinessDesk reported the 2025 closure. [3][4]
- Gap: Lifetime output of the Wiri plant.

## Sources

1. [Fletcher Building opens New Zealand's largest offsite home manufacturing facility](https://fletcherbuilding.com/news/fletcher-building-opens-new-zealands-largest-offsite-home-manufacturing-facility) (Fletcher Building)
2. [Hundreds more homes to be produced after off-site manufacturer boosts capacity](https://www.rnz.co.nz/news/national/401136/hundreds-more-homes-to-be-produced-after-off-site-manufacturer-boosts-capacity) (RNZ)
3. [Fletcher Building's $15m Clever Core prefab house-building factory to shut](https://nzherald.co.nz/property/fletcher-buildings-15m-clever-core-prefab-house-building-factory-to-shut/265ZVSHGAVCETPUHVOIKHPLAWM) (NZ Herald)
4. [Fletcher Building's Clever Core prefab house-building factory to shut](https://businessdesk.co.nz/article/property/fletcher-buildings-clever-core-prefab-house-building-factory-to-shut) (BusinessDesk)
5. [Six reasons why Fletcher's $15m pre-fab house-building facility Clever Core failed](https://nzherald.co.nz/property/six-reasons-why-fletchers-15m-pre-fab-house-building-facility-clever-core-failed-steve-evans/U7YMO3BODZADXN5J66AQE2O2MU) (NZ Herald)