Where it standsMetropolis reported in February 2026 its robotic factory running on a Pacific Palisades lot and about 40 clients in design or permitting.[7]
Cosmic Buildings designs homes with AI-assisted software and frames their wood wall panels with an ABB robot in a mobile micro-factory on Los Angeles fire rebuild lots. Press reported the factory running in Pacific Palisades from mid 2025 and still in February 2026, a model ADU on its first site, and prices of $550 to $700 per sq ft. Not public: homes completed, headcount, funding and measured energy results.
Verify first. Ask how many homes are finished and occupied; ABC7 expected the first two by the end of 2025 and no completion report was found.
What it is
Cosmic Buildings was started in San Francisco in 2022 by architect Sasha Jokic, its chief executive. It began with backyard homes and in 2024 moved into larger fire-resistant single-family homes in Northern California. After the January 2025 Los Angeles fires it set up a robotic micro-factory in a tent on a vacant Pacific Palisades lot, with plans to rotate between Palisades and Altadena.[7][5][2][4]
Inside, an ABB IRB 6710 robot assembles lumber framing and nails on plywood to make wall panels; Dezeen reported two workers feeding and unloading it and about 20 minutes per panel. AI and computer vision guide the robot, and AI-assisted design software checks code compliance and makes the robot instructions. Cladding, flooring and roofing are made off site. Each home includes rooftop solar and batteries.[3][5][7]
Five AI specialists each read the sourced facts on this page for one question. A level measures the public evidence; the company itself is unrated. How the AI Research Team works.
Materials and Circularity
Where do the offcuts go, and can this building be taken apart and used again?
Claims only
Metropolis reported in February 2026 that the robotic arm reduces construction waste, and the company site says its wood panels store carbon. No offcut figure, recycled content or design for disassembly is published.
Evidence
Metropolis reported that the robotic arm cuts labor by about 60 percent and further reduces construction waste, without a waste figure.[7]
Gap
Measured lumber and plywood waste per home and what happens to offcuts.
Energy and Carbon
What is the measured energy use or embodied carbon, and who checked it?
Specifics published
The company specifies rooftop solar, battery storage and all-electric appliances in every home, and Metropolis reported net-zero energy features and homes that exceed wildland urban interface fire standards. No energy rating, measured use or embodied carbon figure is published.
Evidence
The company site lists solar, battery storage, all-electric appliances and high-performance walls in each home.[1]
Metropolis reported in February 2026 that every model includes rooftop solar, battery storage and graywater recycling.[7]
Gap
Energy ratings or measured use of finished homes and an embodied carbon figure.
Cost and Access
What does a finished home cost, and who has moved in?
Third-party evidence
Metropolis and the Los Angeles Business Journal reported prices of $550 to $700 per sq ft, depending on upgrades, in 2025 and 2026. The Journal reported a pledge of one donated 900 sq ft home for every 10 contracts. No donated home is reported as delivered.
Evidence
Metropolis reported average costs of $550 to $700 per sq ft in February 2026.[7]
The Los Angeles Business Journal reported in August 2025 one donated 900 sq ft, two-bedroom home for every 10 contracts.[6]
Gap
What the per sq ft price includes, and whether any donated home has been built and occupied.
Workforce
How many people work there, and what happened to them when plans changed?
Claims only
Dezeen reported two people feeding and unloading the robot in August 2025, and the company claims about 60 percent less labor. No headcount, wage, training or safety figure was found as of November 2026.
Evidence
Dezeen reported two workers feeding materials and removing finished panels at the Palisades micro-factory.[5]
Gap
Total staff, site crew sizes, wages, training and safety records.
Delivery Record
How many buildings exist today, and is the company still here?
Specifics published
Pro Builder reported backyard homes and, from 2024, single-family homes in Northern California, without a count. ABC7 expected the first two fire rebuilds by the end of 2025; Metropolis reported in February 2026 a model ADU on its first Palisades site. No completed Los Angeles home or funding figure is confirmed.
Evidence
ABC7 reported in August 2025 that the first two homes, in the Eaton and Palisades burn zones, were expected by the end of 2025.[4]
Metropolis reported in February 2026 that clients meet designers in a model home, an ADU built on the first Palisades site.[7]
Pro Builder reported in July 2025 that the company built backyard homes first and single-family homes in Northern California in 2024.[2]
Gap
Count of homes completed, occupancy dates for the fire rebuilds, and capital raised.
Timeline
2022.Founded Founded in San Francisco by architect Sasha Jokic, Metropolis and Dezeen reported.[7][5]
2024.Milestone Expanded from backyard homes into larger fire-resistant single-family homes in Northern California, Pro Builder reported.[2]
July 2025.Factory Set up its first mobile micro-factory, a tent with one ABB robot arm, in Pacific Palisades; setup took about 30 days, Dezeen reported.[2][5]
August 2025.Milestone The Los Angeles Business Journal reported 12 signed contracts among 48 families with designs, county permit approval for an Altadena home, and plans for three to four more factories.[6]
February 2026.Milestone Metropolis reported the robotic factory running on a Lower Marquez lot, a model ADU built on that first site, and about 40 clients in design or permitting.[7]