# Ecoworks

Retrofits German apartment blocks with factory-made facade and roof elements, planned from a 3D scan of each building.

- **Operating status:** Active. Venture-backed and led by its founder, one of its main shareholders; it announced a 192-apartment retrofit in Hagen in March 2026 and a DGNB-certified Nuremberg project in June 2026. [2][9][8]
- **Momentum:** Stable
- **Ownership:** Independent
- **Headquarters:** Berlin, Germany
- **Founded:** 2019
- **Role:** General contractor, Designer
- **Method:** Panels
- **Material:** Light wood frame
- **Product:** Panels
- **Builds:** Multifamily
- **Website:** https://www.ecoworks.tech/ (loaded when checked)

Checked 2026-11-21. Page: https://nowcitylabs.com/fieldguide/construction/p/ecoworks/

## Summary by the Lead Analyst

Ecoworks is a Berlin general contractor that retrofits apartment blocks with prefabricated facade and roof elements made by partner factories, including the Oikos Group. BDEW reported completed retrofits in Bochum and Mönchengladbach in 2023, 24 projects and 130 staff in 2025. Press confirms rounds of 7.7, 22 and 40 million euros in 2022 and 2023. Not public: an apartment count, measured energy results after retrofit, and which plants make its elements.

Verify first: Its About page now lists 90 or more staff against 130 reported by BDEW in April 2025; confirm current headcount and delivery volume.

## What it is

Ecoworks plans and carries out serial energy retrofits of existing apartment buildings in Germany, acting as general contractor for housing companies. Each project starts with a laser 3D scan that becomes a digital model of the building. Facade elements with insulation, windows and ventilation built in, and roof elements carrying solar panels, are made in a factory and fixed to the old walls on site. The company says it moves up to 80 percent of the work from the site into the factory. [1][2][3]
Emanuel Heisenberg is founder and chief executive and one of the main shareholders; Paul Birkner is chief operating officer. The company does not name its own plant. In January 2024 it signed the Oikos Group, owner of the prefab home brands Bien-Zenker, Hanse Haus and Living Haus, as a manufacturing partner for facade elements, and its About page also names Brüninghoff Holz, which has three production sites in Germany. [2][7]
Projects include three 1966 buildings with 72 apartments in Nuremberg for Dawonia, which received DGNB Silver certification in 2026, and 12 buildings with 192 apartments in Hagen for the cooperative Wohnungsverein Hagen, a 23 million euro job using timber-frame facade modules. [8][9]

## Key facts

- Founded: 2019, per its own timeline [2]
- Headquarters: Berlin, Germany [3]
- Factory: Partner plants, including the Oikos Group [2][7]
- Funding raised: 7.7M euros (2022), 22M euros (2023), 40M euros (2023) [3][4][5]
- Employees: 130 (BDEW, April 2025); 90 or more (own site, 2026) [10][2]
- Price range: About 1,800 euros per m2 on average before subsidy (2025) [10]

## Production and technology

- Production: No data
- Technology: Robotics, BDEW reports robots prefabricating facade and roof elements in the factory [10]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Panels
- Materials: Light wood frame
- Products: Panels
- Building markets: Multifamily
- Factory: N/A, design firm
- Markets served: Germany
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: EUR 1,800 per sq m, scope not stated, 2025
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Strong · Checked Nov 2026

## Measured

- Price: EUR 1,800 per sq m, scope not stated, 2025 [10]

## Serves

- Germany (DE) [1]

## Timeline

- 2019 (founded): Started serial renovation work in 2019, per the timeline on its About page. [2]
- 2022-06-02 (funding): Raised 7.7 million euros from new investors Warema Group, JLL Spark, Zacua Ventures and Blackhorn Ventures, with existing investors PropTech1 and Motu Ventures. [3]
- 2023 (milestone): Completed retrofits of three 1965 apartment buildings in Bochum and five 1956 buildings in Mönchengladbach, BDEW reported. [10]
- 2023-07-28 (funding): Raised a 22 million euro Series A, tech.eu reported. [4]
- 2023-12-14 (funding): Closed a 40 million euro round led by World Fund, with Haniel, KOMPAS VC and ISAI, to scale its technology and raise automation. [5][6]
- 2024-01-29 (milestone): Signed the Oikos Group as a manufacturing partner for facade elements; the release said Ecoworks was working on more than 20 serial retrofit projects. [7]
- 2025-04-03 (milestone): BDEW reported 24 retrofit projects under way worth 158 million euros and 130 employees. [10]
- 2026-03-31 (milestone): Announced a 23 million euro retrofit of 12 buildings with 192 apartments in Hagen for Wohnungsverein Hagen. [9]
- 2026-06 (milestone): Its Nuremberg retrofit for Dawonia, three buildings with 72 apartments, received DGNB Silver and the QNG seal, per the company. [8]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Specifics published (level 2)

The company names prefabricated timber-frame facade modules for its 2026 Hagen project, a bio-based structure. No factory waste figure, recycled content figure or plan for taking the elements off a building later is published as of November 2026.

- Evidence: The March 2026 Hagen release describes prefabricated timber-frame facade modules with integrated insulation and windows. [9]
- Gap: Factory scrap rates and where offcuts go, recycled content, and whether elements can be removed and reused.

### Energy and Carbon: Specifics published (level 2)

For Hagen the company projects a 36 percent cut in final energy demand and just under 190 metric tons of CO2 saved a year, to the KfW Efficiency House 55 standard. It reports DGNB Silver and QNG for a 72-apartment Nuremberg project in June 2026. No measured post-retrofit energy data is published.

- Evidence: The Hagen release projects a 36 percent drop in final energy demand and just under 190 metric tons of CO2 saved a year with rooftop solar. [9]
- Evidence: The company reported DGNB Silver and the QNG seal for its Nuremberg project with Dawonia, the first serial retrofit it says was DGNB certified. [8]
- Gap: Measured energy use before and after retrofit, the DGNB certificate on the certifier's own register, and embodied carbon of the elements.

### Cost and Access: Third-party evidence (level 3)

BDEW reported in April 2025 an average cost of about 1,800 euros per square meter of retrofitted living space before subsidy, and 1,000 euros with KfW grants. Clients include the cooperative Wohnungsverein Hagen. What the average covers and any effect on rents are not published.

- Evidence: BDEW reported an average of about 1,800 euros per square meter without subsidy and 1,000 euros with KfW grants. [10]
- Evidence: The cooperative Wohnungsverein Hagen hired the company for 192 apartments in 2026. [9]
- Gap: What the average price includes, rent changes for tenants after retrofit, and prices by project.

### Workforce: Third-party evidence (level 3)

BDEW reported 130 employees in April 2025. The company's About page, read in November 2026, lists 90 or more. No source explains the difference. No factory jobs, training or safety figures are public, and factory work is done by partners.

- Evidence: BDEW reported in April 2025 that the company had 130 employees. [10]
- Evidence: The company's About page lists 90 or more employees. [2]
- Gap: Current headcount with a date, jobs at partner plants making its elements, training and safety records.

### Delivery Record: Third-party evidence (level 3)

BDEW confirms retrofits completed in Bochum and Mönchengladbach in 2023 and 24 projects worth 158 million euros under way in April 2025. Press confirms 7.7 million euros raised in 2022 and 22 and 40 million euros in 2023. No count of apartments completed is published.

- Evidence: BDEW reported three Bochum buildings and five Mönchengladbach buildings retrofitted in 2023. [10]
- Evidence: tech.eu reported the 22 million euro Series A in July 2023. [4]
- Evidence: Haniel announced the 40 million euro round in December 2023. [6]
- Gap: A dated count of apartments and buildings completed, and completion of the Hagen project.

## Sources

1. [ecoworks home page](https://www.ecoworks.tech/) (Ecoworks)
2. [Über uns](https://www.ecoworks.tech/ueber-uns) (Ecoworks)
3. [ecoworks rakes in EUR 7.7 million to boost carbon-free retrofitting for housing](https://tech.eu/2022/06/02/ecoworks-rakes-in-eur77-million-to-boost-carbon-free-retrofitting-for-housing/) (tech.eu)
4. [Berlin's ecoworks secures EUR 22M for its eco-friendly retrofitting tech](https://tech.eu/2023/07/28/berlins-ecoworks-secures-eur22m-for-its-eco-friendly-retrofitting-automation-tech) (tech.eu)
5. [ecoworks schließt 40-Millionen-Euro-Runde ab](https://www.ecoworks.tech/aktuelles/ecoworks-schliesst-40-millionen-euro-runde-ab-um-skalierung-seiner-technologie-und-automatisierungsgrad-zu-steigern) (Ecoworks)
6. [Direct investment in ecoworks: Haniel expands its growth capital portfolio](https://www.haniel.de/en/press-releases/news/direct-investment-in-ecoworks-haniel-expands-its-growth-capital-portfolio/) (Haniel)
7. [ecoworks und Fertighaushersteller Oikos Group vereinbaren strategische Partnerschaft](https://www.ecoworks.tech/aktuelles/ecoworks-und-fertighaushersteller-oikos-group-vereinbaren-strategische-partnerschaft-um-klimaneutrale-sanierung-voranzutreiben) (Ecoworks)
8. [Erste DGNB-Zertifizierung einer seriellen Sanierung](https://www.ecoworks.tech/aktuelles/erste-dgnb-zertifizierung-einer-seriellen-sanierung) (Ecoworks)
9. [23 Millionen Projekt in Hagen: Deutschlands größte genossenschaftliche serielle Sanierung](https://www.ecoworks.tech/aktuelles/hagen-pressemitteilung) (Ecoworks)
10. [Start-up Ecoworks: Gebäudesanierung vom Fließband](https://www.bdew.de/online-magazin-zweitausend50/neustart/start-up-ecoworks-gebaeudesanierung-vom-flie%C3%9Fband/) (BDEW)