# Entekra

Made panelized wood framing packages for California homebuilders at a Modesto plant; dissolved by its board in 2023.

- **Operating status:** Closed in 2023. Its board announced on April 24, 2023 that it would cease operations and dissolve the company, with the wind-down due by June 30, 2023, Pro Builder reported. The company website did not respond when checked. [1]
- **Momentum:** Unknown
- **Ownership:** Part of Louisiana Pacific
- **Headquarters:** Modesto, California, United States
- **Founded:** 2015
- **Role:** Manufacturer, Supplier
- **Method:** Panels
- **Material:** Light wood frame
- **Product:** Panels, Components
- **Builds:** Single-family, Commercial
- **Website:** https://www.entekra.com/ (no working site of its own when checked)

Checked 2026-11-19. Page: https://nowcitylabs.com/fieldguide/construction/p/entekra/

## Summary by the Lead Analyst

Entekra delivered whole-house framing packages of wall and floor panels and roof trusses to homebuilders in Northern California. Its Modesto plant was described as able to supply 3,000 homes a year; actual output was never published. Its board dissolved it in 2023, with Louisiana Pacific as majority owner, saying growth needed capital that outside investors would not provide. Press reports 138 to 240 jobs lost.

Verify first: The company is dissolved; no successor operating its plants was identified in the sources read.

## What it is

Entekra made prefabricated wood framing systems. Its package for a house included wall and floor panels, roof trusses and related materials for assembly on site. Customers named by the trade press included Beazer Homes, Van Daele Homes, Wathen Castanos and A.G. Spanos Companies. [1][2]
Pro Builder reports it was founded in Ireland in 2015 by Gerard McCaughey, began US operations with a plant in Ripon, California in 2016 and in 2019 built a $35 million headquarters and 200,000 square foot plant in Modesto described as capable of 3,000 homes a year. HousingWire dates the company to 2017 in Ripon. [1][2]
Louisiana Pacific invested $45 million in 2018 and became majority owner in 2021. In April 2023 the board decided to cease operations and dissolve the company. The Modesto Bee reported 138 workers losing jobs at Modesto and Patterson; Pro Builder reported up to 240 affected, about 200 in Modesto and 40 in Monaghan, Ireland. [1][2][3]

## Key facts

- Founded: 2015 in Ireland; US operations from 2016 [1]
- Headquarters: Modesto, California [1][3]
- Factory: 200,000 sq ft, Modesto; earlier plant in Ripon [1]
- Funding raised: $45 million from LP in 2018 [1][2]
- Employees: 138 to 240 jobs lost at closure, by source [1][3]
- Ownership: LP was majority owner from 2021 [1][2]

## Production and technology

- Production: No data
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Panels
- Materials: Light wood frame
- Products: Panels, Components
- Building markets: Single-family, Commercial
- Factory: Modesto, CA; Ripon, CA; Patterson, CA
- Markets served: California
- Demonstrated scale: No data
- Annual capacity: 3,000 homes a year, reported 2019
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Capacity per year: 3,000 homes/yr capacity, reported 2019 (described capability of the Modesto plant, per Pro Builder; not output) [1]
- Factory floor area: 200,000 sq ft factory floor area [1]

## Factories

- Modesto, California, United States: 200,000 sq ft, Built 2019 with the headquarters for $35 million; closed 2023 [1]
- Ripon, California, United States: First US plant, opened 2016 [1]
- Patterson, California, United States: Named with Modesto in the April 2023 layoff letters [3]

## Serves

- California (US-CA) [2]

## Timeline

- 2015 (founded): Founded in Ireland by Gerard McCaughey. [1]
- 2016 (factory): Began US operations with a plant in Ripon, California. [1]
- 2018-05 (funding): LP invested $45 million. [1][2]
- 2019 (factory): Built a $35 million headquarters and 200,000 square foot plant in Modesto, California. [1]
- 2021 (acquisition): LP became majority owner. [1][2]
- 2023-04-17 (layoffs): Sent letters to Stanislaus County officials reporting 138 permanent job cuts between April 18 and June 16. [3]
- 2023-04-24 (closure): The board announced it would cease operations and dissolve the company, with the wind-down to finish by June 30, 2023. [1][2]

## What public reporting says happened

- The board said long-term success required scalable operations through regional expansion and greater capacity, that this needed more capital, and that the company could not attract sufficient outside investment. [1]
- Louisiana Pacific said a review of strategic alternatives drew no outside investment interest and that it would rather invest in its core businesses, the Modesto Bee reported. [3]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No public figure or statement on factory waste, lumber sourcing, reuse or disassembly was found in the sources read.

- Gap: Offcut and waste figures from the Modesto plant and lumber sourcing.

### Energy and Carbon: No public evidence (level 0)

No energy or embodied carbon figure was found in the sources read.

- Gap: Any energy or carbon assessment of homes framed with its panels.

### Cost and Access: No public evidence (level 0)

No price, cost saving figure or affordable housing project was found in the sources read. Its named customers were homebuilders.

- Gap: Cost per home of the framing package against site framing, and any affordable projects supplied.

### Workforce: Third-party evidence (level 3)

Local press reports 138 permanent job cuts in Stanislaus County between April and June 2023, from letters sent to county officials, and that employees were not unionized. Trade press reported up to 240 affected including Ireland.

- Evidence: The Modesto Bee reported 138 job cuts from April 17, 2023 letters to county officials and that employees were not unionized. [3]
- Evidence: Pro Builder reported up to 240 associates affected, about 200 in Modesto and 40 in Monaghan. [1]
- Gap: Severance terms and where the workers went.

### Delivery Record: Third-party evidence (level 3)

Named press documents two California plants, a $45 million investment in 2018, majority ownership by LP from 2021 and dissolution in 2023. No count of homes framed was found; 3,000 homes a year was a described capability, not output.

- Evidence: Pro Builder reported the Modesto plant, its $35 million cost and its described capability of 3,000 homes a year. [1]
- Evidence: HousingWire reported the LP investment, the 2021 majority stake and the planned shutdown. [2]
- Gap: Homes framed by year, financial results, and what became of the Modesto plant.

## Sources

1. [Entekra Exit: The Off-Site Construction Company Will Shut Down by June 30](https://www.probuilder.com/construction/off-site-construction/article/55198562/entekra-exit-the-off-site-construction-company-will-shut-down-by-june-30) (Pro Builder)
2. [Entekra to dissolve and shut down operations by June 30](https://www.housingwire.com/articles/entekra-to-dissolve-and-shut-down-operations-by-june-30/) (HousingWire)
3. ['Revolutionary' construction company in Modesto is dissolved. Workers getting pink slips](https://ca.news.yahoo.com/revolutionary-construction-company-modesto-dissolved-200700268.html) (The Modesto Bee, via Yahoo News)