Five AI specialists each read the sourced facts on this page for one question. A level measures the public evidence; the company itself is unrated. How the AI Research Team works.
The company states its use of materials minimizes waste and that cutting near the site cuts transport emissions by up to 90 percent. No offcut figure, material yield or disassembly plan for the timber chassis is published as of November 2026.
Evidence
- The company site states that its use of engineered timber minimizes waste, without a figure.[1]
Gap
- Measured timber offcuts per home, where they go, and whether the chassis can be taken apart and reused.
The company claims Passive House-grade thermal performance and a 90 percent cut in transport carbon. No Passive House certificate, energy test or embodied carbon figure for a finished home was found.
Evidence
- The Facit Homes site claims Passive House-grade thermal performance and low embodied energy, without test results.[1]
- Facit Technologies claims a 90 percent reduction in transport CO2.[2]
Gap
- Certified energy results, airtightness tests and an embodied carbon figure per home.
GreenBuildingAdvisor reported in October 2024 a price of £3,200 per square meter, about $300 per sq ft, covering windows, cladding, services, finishes, heating and ventilation, for homes averaging about 400 square meters. These are high-end custom homes; no affordable homes are documented.
Evidence
- GreenBuildingAdvisor reported a price of £3,200 per square meter and listed what it includes.[3]
- GreenBuildingAdvisor reported that homes average about 400 square meters.[3]
Gap
- Prices for homes made for developers with the micro-factory and any homes for lower income households.
No headcount, crew size per micro-factory, training or safety data was found for Facit Homes or Facit Technologies as of November 2026.
Gap
- Staff numbers, workers per micro-factory, training and safety records.
GreenBuildingAdvisor reported 28 homes built since 2007, and AEC Magazine reported over £30 million of housing by April 2024. The company states 74,000 sq ft completed since 2011. No home made by the new container micro-factory is documented.
Evidence
- GreenBuildingAdvisor reported 28 homes built to date in October 2024.[3]
- AEC Magazine reported over £30 million of housing built collectively by April 2024.[4]
- Facit Technologies states 74,000 sq ft of property completed since 2011.[2]
Gap
- Homes completed since October 2024 and any output from the micro-factory for developers.