# Factory OS (Harbinger)

Built apartment modules in a union factory on Mare Island, Vallejo; renamed Harbinger in 2024; warned of layoffs in 2026.

- **Operating status:** Unverified. The Vallejo Sun reported a February 2026 notice that all 280 employees could be laid off from April; the company said then it was not planning to close. No source found confirms whether the layoffs happened or whether the plant is producing. [1]
- **Momentum:** Contracting
- **Ownership:** Acquired
- **Headquarters:** Vallejo, California, United States
- **Founded:** 2017
- **Role:** Manufacturer
- **Method:** Volumetric modules
- **Product:** Room modules
- **Builds:** Multifamily, Affordable housing, Emergency shelter
- **Website:** https://harbinger.homes/ (loaded when checked)

Checked 2026-11-20. Page: https://nowcitylabs.com/fieldguide/construction/p/factory-os/

## Summary by the Lead Analyst

Factory OS, renamed Harbinger Production after a 2024 sale, made apartment modules in a 250,000 square foot union plant in Vallejo and said it had shipped more than 4,000 homes, 90 percent affordable. In February 2026 it gave notice that all 280 workers could be laid off, citing a lack of new business and lost capital funding. The outcome is not public.

Verify first: Whether the Vallejo plant is producing and who owns it; no source after February 2026 was found.

## What it is

Rick Holliday and Larry Pace started Factory OS on Mare Island in Vallejo in 2017 to build finished apartment modules with union carpenters. The plant is a 250,000 square foot former Navy machine shop. Alphabet was its first customer, with an order for 300 apartments, and the company raised money from Autodesk, Citi, Google, JPMorgan Chase and Saint-Gobain between 2019 and 2021. [1][3]
The Vallejo Sun reported that a private-equity-backed consortium acquired the company in 2024, including its factory and intellectual property, and renamed it Harbinger Production. Its site says the team and facility have delivered 4,000 homes in California and Hawaii, including temporary homes for wildfire survivors in Lahaina. [1][4]
In February 2026 the company told officials it might lay off all of its employees from April; the Vallejo Sun put the number at 280 and CBS Sacramento at 290. It said it was not planning to close and was pursuing new contracts. [1][2]

## Key facts

- Founded: 2017 [1]
- Headquarters: Mare Island, Vallejo, California [1]
- Factory: 250,000 sq ft, Mare Island, Vallejo [1]
- Homes delivered: More than 4,000 since 2017, the company said [1][2]
- Funding raised: About $100 million reported from 2019 to 2021 [1]
- Employees: About 280 at the February 2026 layoff notice [1]

## Production and technology

- Production: Large central factory, One Vallejo plant that has delivered homes to California and Hawaii [4]
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: No data
- Products: Room modules
- Building markets: Multifamily, Affordable housing, Emergency shelter
- Factory: Vallejo, CA
- Markets served: California, Hawaii
- Demonstrated scale: 4,000 homes shipped, 2026
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Units delivered: 4,000 homes delivered, 2026 (company statement to press: homes built and shipped since 2017) [2]
- Factory floor area: 250,000 sq ft factory floor area [1]

## Factories

- Vallejo, California, United States: 250,000 sq ft, Former Navy machine shop on Mare Island, built 1940; in use from 2017 [1]

## Serves

- California (US-CA) [4]
- Hawaii (US-HI) [4]

## Timeline

- 2017 (founded): Rick Holliday and Larry Pace began operations on Mare Island. [1]
- 2018-05-16 (factory): Held its grand opening with 58 workers at 24 assembly stations. [3]
- 2019 (funding): Raised $22.7 million, including from Autodesk and Citi. [1]
- 2020 (funding): Received $17 million from Google and Autodesk. [1]
- 2021-04 (funding): Raised $60 million from JPMorgan Chase and Saint-Gobain, and reported more than 1,000 units produced. [1]
- 2024 (acquisition): A private-equity-backed consortium acquired the company, its factory and its intellectual property and renamed it Harbinger Production. [1]
- 2025 (leadership): Tom Smith became chief executive about a year after the sale; former chief executive Kevin Brown became president and chief commercial officer. [1]
- 2025-06-21 (milestone): Announced completion of 167 temporary homes in Lahaina for wildfire survivors. [4]
- 2026-02 (layoffs): Gave officials notice that all of its roughly 280 employees could be laid off from April, citing a lack of new business and loss of capital funding. [1][2]

## What public reporting says happened

- The layoff notice cited a lack of new business and a loss of capital funding, the Vallejo Sun reported. [1]
- The company told CBS Sacramento it faced a gap in its production pipeline while reporting record productivity of up to six homes a day. [2]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No public figure or statement on factory waste, material sourcing, reuse or disassembly was found in the sources read.

- Gap: Factory waste figures, material sourcing, and what becomes of unfinished modules in the sale.

### Energy and Carbon: No public evidence (level 0)

No energy standard, measured energy use or embodied carbon figure was found in the sources read.

- Gap: Energy performance of delivered buildings and embodied carbon per module.

### Cost and Access: Specifics published (level 2)

The company said 90 percent of more than 4,000 homes shipped were affordable housing, and its site reports 167 temporary homes for wildfire survivors in Lahaina. The share is a company statement relayed by press; no cost per unit was found in the sources read.

- Evidence: CBS Sacramento relayed the company statement of more than 4,000 homes, 90 percent affordable. [2]
- Evidence: The company site reports 167 temporary homes completed in Lahaina in June 2025. [4]
- Gap: Cost per unit against site-built equivalents, verified by a third party, and a list of buildings delivered.

### Workforce: Third-party evidence (level 3)

Local press documents a union workforce that grew from 58 in May 2018 to about 280, and a February 2026 notice that all could be laid off. The carpenters union said it was working to keep members employed. Whether the layoffs happened is not confirmed.

- Evidence: The Vallejo Sun reported the February 2026 notice covering all 280 employees and the union response. [1]
- Evidence: KTVU reported 58 workers at the May 2018 opening. [3]
- Gap: How many workers were laid off and when, severance, and the plant's safety record.

### Delivery Record: Third-party evidence (level 3)

Named press confirms the factory, about $100 million raised from 2019 to 2021, a 2024 sale and a 2026 layoff notice. Unit totals of 1,000 in 2021, 3,000 in 2024 and 4,000 in 2026 are company statements.

- Evidence: The Vallejo Sun reported the funding rounds, the 2024 sale and company unit counts of 3,000 homes in 28 buildings by 2024. [1]
- Gap: What happened after the 2026 layoff notice, the buyers in 2024, and an independent count of buildings delivered.

## Sources

1. [Vallejo modular home manufacturer tells officials it may close, laying off all employees](https://www.vallejosun.com/vallejo-modular-home-manufacturer-to-close-laying-off-all-employees/) (The Vallejo Sun)
2. [Another Solano company prepares for mass layoffs, could push job losses over 1,000 since December](https://www.cbsnews.com/sacramento/news/more-mass-layoffs-possible-solano-county) (CBS Sacramento)
3. [Affordable, much-needed modular homes on Vallejo's Mare Island](https://www.ktvu.com/news/affordable-much-needed-modular-homes-on-vallejos-mare-island) (KTVU)
4. [Harbinger Homes home page](https://harbinger.homes/) (Harbinger Production)