# Fading West

Builds modular homes, townhomes and apartments in Buena Vista, Colorado for mountain towns, nonprofits and its own communities.

- **Operating status:** Active. Its site counts more than 1,000 homes built since 2016 and lists a 2026 Modular Building Institute award. The latest press found on factory output is from 2024. [1][3]
- **Momentum:** Unknown
- **Ownership:** Unknown
- **Headquarters:** Buena Vista, Colorado, United States
- **Role:** Manufacturer, Developer
- **Method:** Volumetric modules
- **Product:** Whole homes
- **Builds:** Single-family, Multifamily, Workforce housing, Affordable housing, Emergency shelter, Backyard homes
- **Website:** https://www.fadingwest.com/ (loaded when checked)

Checked 2026-11-19. Page: https://nowcitylabs.com/fieldguide/construction/p/fading-west/

## Summary by the Lead Analyst

Fading West runs one 110,000 square foot modular plant in Buena Vista, Colorado and develops its own neighborhood there. It planned for over 700 homes a year in 2021; press in May 2024 reported up to two homes a week. The company counts more than 1,000 homes since 2016; press says the first 70 to 80 at The Farm came from a Nebraska factory. Named press confirms workforce projects in several Colorado towns. No current output, price per square foot, waste or energy data is public.

Verify first: Actual homes per week today; the 2021 plan of over 700 a year is far above the two a week reported in 2024.

## What it is

Fading West builds modular single-family homes, townhomes and apartments for developers, municipalities, nonprofits, builders and homeowners. Its site names The Farm in Buena Vista with 218 homes, 60 workforce apartments in Breckenridge and 82 modular homes delivered to Lahaina, Maui for FEMA wildfire relief. [1]
Founder and chief executive Charlie Chupp built the Buena Vista factory after the first 70 to 80 homes at The Farm used units from a Nebraska factory. A 2021 release gave the plant 110,000 square feet, more than 100 jobs and a planned output of over 700 homes, townhomes and apartments a year. Press later put its cost at $25 million to $30 million. [2][3][4][5]
In May 2024 the plant was reported to be making up to two homes a week, with a two-bedroom unit taking nine days. A supplier profile that September counted roughly 130 employees. [3][4]

## Key facts

- Headquarters: Buena Vista, Colorado [2]
- Factory: 110,000 sq ft, Buena Vista [1][2]
- Homes delivered: More than 1,000 since 2016, the company says [1]
- Employees: Roughly 130 (September 2024) [4]
- Price range: $250,000 to about $700,000 in 2021, per Denver7 [6]
- Serves: Colorado mountain towns; Maui for FEMA [1][5]

## Production and technology

- Production: No data
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: No data
- Products: Whole homes
- Building markets: Single-family, Multifamily, Workforce housing, Affordable housing, Emergency shelter, Backyard homes
- Factory: Buena Vista, CO
- Markets served: Colorado, Hawaii
- Demonstrated scale: 1,000 homes delivered, 2026
- Annual capacity: 700 homes a year, reported 2021
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Units delivered: 1,000 homes delivered, 2026 (company site, as read 2026-11: homes built since 2016) [1]
- Capacity per year: 700 homes/yr capacity, reported 2021 (company release: planned yearly output of homes, townhomes and apartments) [2]
- Factory floor area: 110,000 sq ft factory floor area [2]

## Factories

- Buena Vista, Colorado, United States: 110,000 sq ft, Production expected to start in late 2021, per the company [2]

## Serves

- Colorado (US-CO) [5]
- Hawaii (US-HI) [1]

## Timeline

- 2021-02-24 (factory): Announced that construction was under way on a 110,000 square foot factory in Buena Vista, with production expected in late 2021. [2]
- 2023-06-15 (milestone): The Vail Daily reported orders including 16 duplex homes in Eagle with Habitat for Humanity Vail Valley, 20 apartments in Edwards and 60 units in Breckenridge. [5]
- 2024-05-24 (milestone): Route Fifty republished a report that the factory was producing up to two homes a week. [3]
- 2024-09-12 (milestone): A Boise Cascade profile counted roughly 130 employees. [4]
- 2026 (milestone): Lists a first place Modular Building Institute award for relocatable social and supportive housing. [1]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No public figure or statement on factory waste, material sourcing, reuse or disassembly was found.

- Gap: Factory waste figures, lumber sourcing, and whether homes can be relocated or taken apart.

### Energy and Carbon: No public evidence (level 0)

No energy standard, measured energy use or embodied carbon figure was found on the company site or in the press read.

- Gap: Energy ratings of delivered homes and any embodied carbon assessment.

### Cost and Access: Third-party evidence (level 3)

Named press confirms workforce and nonprofit projects: duplexes with Habitat for Humanity in Eagle, 60 units in Breckenridge and homes at The Farm priced for median-income buyers. The company claims savings of about 20 percent; no cost per square foot is published.

- Evidence: The Vail Daily named projects in Eagle, Edwards, Breckenridge and Fairplay in June 2023. [5]
- Evidence: Route Fifty reported that most homes at The Farm sold at prices affordable to median-income earners, and that the 20 percent saving alone does not reach low-income families. [3]
- Evidence: Denver7 reported in September 2021 homes starting at $250,000 and reaching about $700,000. [6]
- Gap: Price per square foot at the factory and installed, and resale restrictions on the homes sold.

### Workforce: Specifics published (level 2)

A 2021 company release projected more than 100 jobs, and a supplier profile in September 2024 counted roughly 130 employees. No wage or safety data was found.

- Evidence: A Boise Cascade profile counted roughly 130 employees in September 2024. [4]
- Evidence: The 2021 release projected more than 100 jobs. [2]
- Gap: Wages against local housing costs, turnover and safety record.

### Delivery Record: Third-party evidence (level 3)

Named press confirms the factory and projects or orders in five Colorado towns by June 2023. The total of more than 1,000 homes since 2016 is the company's own; the first 70 to 80 homes at The Farm came from a Nebraska factory, Route Fifty reported.

- Evidence: The company site counts more than 1,000 homes since 2016 and 82 homes delivered to Lahaina for FEMA. [1]
- Evidence: Route Fifty reported that the first 70 to 80 homes at The Farm came from a Nebraska factory. [3]
- Evidence: The Vail Daily reported the plant in operation and named customer towns in June 2023. [5]
- Gap: Homes built per year in the Buena Vista plant, ownership and financing of the company, and any second factory.

## Sources

1. [Fading West home page](https://www.fadingwest.com/) (Fading West)
2. [Construction Underway On Fading West Development's Modular Home Manufacturing Facility](https://www.prweb.com/releases/construction-underway-on-fading-west-development-s-modular-home-manufacturing-facility-850952542.html) (Fading West Development, via PRWeb)
3. [Are modular homes the future of affordable housing?](https://www.route-fifty.com/infrastructure/2024/05/are-sleek-modular-homes-future-affordable-housing/396882/) (Route Fifty, first published by Reasons to Be Cheerful)
4. [Fading West: A Growing Force in Workforce Housing](https://www.bc.com/blog/fading-west-a-growing-force-in-workforce-housing/) (Boise Cascade)
5. [This Colorado mountain town is producing the future of workforce housing](https://www.vaildaily.com/news/eagle-county-officials-visit-buena-vista-to-see-the-future-of-mountain-workforce-housing/) (Vail Daily)
6. [Modular house facility being constructed in Buena Vista](https://www.denver7.com/news/local-news/as-mountain-communities-struggle-with-lack-of-housing-one-company-sees-modular-homes-as-a-solution) (Denver7)