Skip to content

Field Guides / Industrialized Construction / Europe

Finch Buildings

Designer · Amsterdam, North Holland, Netherlands · checked November 25, 2026

Designs demountable cross-laminated timber housing modules in Amsterdam; partner factories build them for Dutch landlords.

Finch Buildings logo

Where it standsIts site reports a 2026 public prize at the Dutch national timber building awards and more than 800 homes built; it raised 1 million euros from AMAVI Capital in 2021.[1][2][4]

Lead Analyst summary

Compiled from the five specialist findings. Read the findings.

An Amsterdam design company, founded in 2014, that designs a system of cross-laminated timber modules and leaves production to partner factories, including De Groot Vroomshoop of VolkerWessels. It reports more than 800 homes built in the Netherlands housing over 1,000 people, and modules that can be taken apart. Its 25,000 ton CO2 saving claim has no published method. Funding on record is 1 million euros from AMAVI Capital in 2021.

Verify first. Which partner factory will build a given project, and whether any module has actually been moved and reused.

What it is

Finch Buildings designs a modular system of solid timber units for apartments, studios, care apartments, offices and hotels. It says a residential project takes about nine months.[1]

The company says it is independent of any one factory and works with several manufacturing partners able to make modular timber at scale; clients may choose the final production or construction partner. A 2021 report named De Groot Vroomshoop, part of VolkerWessels, as the Dutch assembler.[3][4]

Its modules use CLT floors, columns and walls with timber frame facades and are demountable, per a 2024 Royal Netherlands Society of Engineers event page. Finch mainly works for housing associations.[5]

At a glance

Status
Active
Role
Designer
Method
Volumetric modules
Material
Mass timber
Product
Room modules
Builds
Multifamily, Affordable housing
Headquarters
Amsterdam, North Holland, Netherlands
Serves
Netherlands
Founded
2014
Units delivered
800 homes delivered, 2026[2]

Production and technology

How the company organizes production, and the production technology a source documents.

Production

On record
No data

Technology

On record
No data
Was this page useful?Send a correction

Finch Buildings

Active · Independent

Visit Finch Buildings

Go deeper with Now City Labs.

Quick scans, market reports and value chain maps for developers, manufacturers, funds and cities.