# FullStack Modular

Makes steel volumetric modules for mid- and high-rise apartments, hotels and student housing.

- **Operating status:** Active. Announced a 130,000 square foot factory in Carson, California in December 2024. Building Design+Construction reported in July 2025 that it is the module maker for Cal Poly's 4,200-bed student housing project. [3][4]
- **Momentum:** Expanding
- **Ownership:** Independent
- **Headquarters:** Carson, California, United States
- **Founded:** 2016
- **Role:** Manufacturer
- **Method:** Volumetric modules
- **Material:** Other
- **Product:** Room modules
- **Builds:** Multifamily, Hospitality, Student housing
- **Website:** https://www.fullstackmodular.com/ (loaded when checked)

Checked 2026-11-19. Page: https://nowcitylabs.com/fieldguide/construction/p/full-stack-modular/

## Summary by the Lead Analyst

FullStack Modular makes all-steel volumetric modules for mid- and high-rise apartments, hotels and student housing. It announced a 130,000 square foot factory in Carson, California in December 2024 and is the module maker for Cal Poly's 4,200-bed housing program. Its predecessor built the 363-unit 461 Dean Street tower in Brooklyn. Not public: production capacity, prices, modules delivered since 2016 and the current state of its Connecticut plant.

Verify first: Verify delivery of the first Cal Poly phase, expected by fall 2026, and whether the Connecticut plant still produces.

## What it is

FullStack Modular designs, engineers and fabricates steel-framed modules that stack into mid- and high-rise buildings. It targets apartments, hotels and student housing. [1][3]
The business came out of Forest City Ratner's modular unit, which built the 32-story, 363-unit tower at 461 Dean Street in Brooklyn from a factory in the Brooklyn Navy Yard. Roger Krulak acquired the company from Forest City in September 2016 and is its founder and president. [2][3][5]
The company announced a move from Brooklyn to Hamden, Connecticut in 2023 and added the Carson factory in 2024. Its site lists only the Carson address. Its largest current job is Cal Poly San Luis Obispo's nine-building student housing program. [5][3][1][4]

## Key facts

- Founded: 2016 [2]
- Headquarters: Carson, California (address on its site) [1]
- Factory: 130,000 sq ft, Carson, California [3]
- Employees: About 140 jobs announced for Carson [3]
- Ownership: Acquired by Roger Krulak in 2016 [2]

## Production and technology

- Production: No data
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: Other
- Products: Room modules
- Building markets: Multifamily, Hospitality, Student housing
- Factory: Carson, CA
- Markets served: California
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Strong · Checked Nov 2026

## Factories

- Carson, California, United States: 130,000 sq ft, Opening announced December 2024 [3]

## Serves

- California (US-CA) [3]

## Timeline

- 2016-09 (founded): Roger Krulak acquired the modular business from Forest City Ratner Companies. [2]
- 2017-06 (factory): Announced a $6 million investment to scale production at its Brooklyn Navy Yard factory, according to Atlantic Yards Report. [5]
- 2023-04 (factory): Announced a move from Brooklyn to Hamden, Connecticut, with 100 jobs and an investment of $8 million to $12 million. [5]
- 2024-12-17 (factory): Announced the opening of a 130,000 square foot factory in Carson, California, and said it would create about 140 new jobs. [3]
- 2025 (milestone): Building Design+Construction reported that prototype units went into production at the Los Angeles area factory in January and that manufacturing for Cal Poly's 4,200-bed, nine-building student housing project was scheduled to begin in late winter 2025, with a first phase expected by fall 2026. [4]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Claims only (level 1)

The company site states 67 percent less waste than conventional construction. It does not say how the figure was measured or where offcuts go, and publishes nothing on recycled steel content or disassembly.

- Evidence: The company site claims 67 percent less waste. [1]
- Gap: No measured waste data, recycled steel content or disassembly information.

### Energy and Carbon: Specifics published (level 2)

Building Design+Construction reported in July 2025 that the Cal Poly housing project is designed to achieve LEED Gold. That is a design target on a client project. No certified results, energy use or embodied carbon figures for its modules are public.

- Evidence: Building Design+Construction reported that the Cal Poly housing project is designed to achieve LEED Gold certification. [4]
- Gap: No certified results, energy use data or embodied carbon figures for its modules.

### Cost and Access: Specifics published (level 2)

Project sizes are public: 4,200 student beds in nine buildings at Cal Poly and 363 apartments at 461 Dean Street in Brooklyn. The company states up to 25 percent lower building cost and publishes no prices, cost per unit or count of affordable homes.

- Evidence: The Cal Poly project will provide 4,200 beds in nine buildings. [4]
- Evidence: The company claims up to 25 percent lower building cost. [1]
- Gap: No cost per unit, rents or count of affordable homes delivered.

### Workforce: Specifics published (level 2)

Company announcements give about 140 jobs for the Carson factory in December 2024 and 100 for the 2023 move to Hamden, Connecticut. Atlantic Yards Report wrote that production left Brooklyn in 2023. No current headcount by site or safety record is public.

- Evidence: The company said the Carson factory would create about 140 jobs. [3]
- Evidence: Atlantic Yards Report wrote that the 2023 move to Connecticut involved 100 jobs and that the company said it had employed more than 250 New York workers over time. [5]
- Gap: No current headcount by site, safety record or account of what happened to the Brooklyn workers.

### Delivery Record: Third-party evidence (level 3)

Press confirms the 32-story, 363-unit tower at 461 Dean Street, built under the predecessor business, and in July 2025 named FullStack as module maker on Cal Poly's project of more than $1 billion. No list of buildings completed since 2016 or financial figures is public.

- Evidence: 461 Dean Street has 32 floors and 363 units; Atlantic Yards Report notes the work was done under the predecessor company. [2][5]
- Evidence: Building Design+Construction named FullStack as modular manufacturer on Cal Poly's project, which costs more than $1 billion. [4]
- Gap: No list of completed buildings since 2016 and no public funding or financial figures.

## Sources

1. [FullStack Modular home page](https://www.fullstackmodular.com/) (FullStack Modular)
2. [History](https://www.fullstackmodular.com/history/) (FullStack Modular)
3. [FullStack Modular Opens West Coast Factory, Ushering in a New Era of Construction in California](https://www.prnewswire.com/news-releases/fullstack-modular-opens-west-coast-factory-ushering-in-a-new-era-of-construction-in-california-302331358.html) (PR Newswire (FullStack Modular press release))
4. [Cal Poly takes a modular approach to deliver 4,200 beds in nine new student housing buildings](https://www.bdcnetwork.com/building-sector-reports/modular-building/news/55300726/cal-poly-takes-a-modular-approach-to-deliver-4200-beds-in-nine-new-student-housing-buildings) (Building Design+Construction)
5. [Catching up on FullStack Modular move](https://atlanticyardsreport.blogspot.com/2025/01/catching-up-on-fullstack-modular-move.html) (Atlantic Yards/Pacific Park Report)