# Hickory

Melbourne builder and developer that makes concrete and steel high-rise modules and Sync bathroom pods for its own towers.

- **Operating status:** Active. An April 2026 company notice reports a A$2.5 billion secured workbook, more than 1,000 staff and growth into Sydney and wider New South Wales. [8]
- **Momentum:** Expanding
- **Ownership:** Unknown
- **Headquarters:** Melbourne, Victoria, Australia
- **Founded:** 1991
- **Role:** Manufacturer, Builder, General contractor, Developer
- **Method:** Volumetric modules
- **Material:** Concrete, Other
- **Product:** Room modules, Bathroom pods
- **Builds:** Multifamily, Student housing, Commercial
- **Website:** https://www.hickory.com.au/ (loaded when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/hickory/

## Summary by the Lead Analyst

A Melbourne builder founded in 1991 that runs its own module and bathroom pod factory. Its Hickory Building System places concrete-floored modules with fitted bathrooms and facades; named press confirms 285 modules and 629 pods in the 43-floor Atira tower and a 2021 award for the 60-level Collins House. It reports a A$2.5 billion workbook in 2026. No current factory output, waste or carbon figure was found.

Verify first: Current module output at the Laverton North plant and how much of the 2026 workbook uses the building system.

## What it is

Hickory is a Melbourne construction and property company working on residential, government, industrial and data center projects, and is expanding in Sydney. Brothers Michael and George Argyrou founded it in Melbourne in 1991; Michael Argyrou is group chief executive. [3]
Its Hickory Building System combines an engineered concrete floor, load-bearing columns, fitted bathroom pods and a facade attached in the factory into modules made off site. The company says it cuts construction time by up to 50 percent against conventional concrete and column construction. [2]
Named press reports the system was used for the 43-floor Atira student tower on La Trobe Street, with 285 modules and 629 Sync bathroom pods, and for Collins House, a 60-level tower that won a 2021 CTBUH construction award. [6][7]

## Key facts

- Founded: 1991, Melbourne [3]
- Headquarters: Melbourne, Victoria [3]
- Factory: Laverton North, over six hectares (2021) [7]
- Employees: More than 1,000 (April 2026) [8]
- Order book: A$2.5 billion secured workbook (April 2026) [8]
- Serves: Australia; Victoria, growing in New South Wales [8]

## Production and technology

- Production: Large central factory, One plant in Melbourne's west supplying its own projects [7]
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: Concrete, Other
- Products: Room modules, Bathroom pods
- Building markets: Multifamily, Student housing, Commercial
- Factory: Laverton North, Australia
- Markets served: Australia
- Demonstrated scale: 200 projects delivered, 2026
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Units delivered: 200 projects delivered, 2026 (company-reported, more than 200 projects complete, all methods) [1]

## Factories

- Laverton North, Victoria, Australia: Over six hectares in 2021; 2014 and 2015 reports place it in Brooklyn [7]

## Serves

- Australia (AU) [8]

## Timeline

- 1991 (founded): Founded in Melbourne by Michael and George Argyrou. [3]
- 2014-05 (milestone): A trade magazine reported its Brooklyn factory making two modules a day with about 70 staff, aiming for four a day. [4]
- 2015-05 (milestone): Named Large Manufacturer of the Year at the Victorian Manufacturing Hall of Fame awards for its building systems and Sync pod work. [5]
- 2019-07 (milestone): Press reported the 43-floor Atira tower completed in 24 months using 285 modules and 629 bathroom pods. [6]
- 2021 (milestone): Collins House, a 60-level, 184 meter tower, won a CTBUH Construction Award for Excellence. [7]
- 2023-11 (milestone): The chief executive said Hickory could bid for jobs worth up to A$400 million, about double its earlier limit. [9]
- 2026-04 (leadership): Appointed Sally Capp as chief strategy officer and named a new executive team for growth in New South Wales. [8]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Claims only (level 1)

The company says the system reduces waste, and 2019 press notes temporary steel props were designed for reuse. No waste figure, recycled share or disassembly example is published.

- Evidence: The building system page claims reduced waste without a figure. [2]
- Evidence: Press reports Atira's steel columns were made as temporary props so they could be recycled. [6]
- Gap: Factory waste by weight and what happens to offcuts and temporary steel.

### Energy and Carbon: No public evidence (level 0)

No energy rating, embodied carbon figure or verified emissions data was found for the factory or its towers in the sources read.

- Gap: Embodied carbon per square meter of a module tower and any third-party rating.

### Cost and Access: Claims only (level 1)

Its module towers include 783 student beds at Atira (2019). No price, rent or affordable home count was found.

- Evidence: Press reports Atira has 783 student beds built with the system. [6]
- Gap: Prices or rents and any social or affordable homes delivered.

### Workforce: Specifics published (level 2)

The company reports more than 1,000 staff in April 2026. A 2014 report put the modular division at about 70 staff, with about 100 subcontractors brought in on site. No safety or training figures were found.

- Evidence: The April 2026 notice reports a workforce of more than 1,000. [8]
- Evidence: A 2014 trade feature reported about 70 modular division staff and about 100 on-site subcontractors. [4]
- Gap: Current factory headcount, injury rates and training numbers.

### Delivery Record: Third-party evidence (level 3)

Operating since 1991 with more than 200 projects reported. Named press confirms module towers of 43 floors (Atira, 2019) and 60 levels (Collins House, 2021 award). Its 2015 state manufacturing award is a third-party record.

- Evidence: Engineers Australia's magazine reports 285 modules and 629 pods at Atira. [6]
- Evidence: Press reports Collins House won a 2021 CTBUH award. [7]
- Gap: A count of towers and modules built with the system to date.

## Sources

1. [Hickory home page](https://www.hickory.com.au/) (Hickory)
2. [Hickory Building Systems](https://www.hickory.com.au/hickory-building-systems/) (Hickory)
3. [Leadership and Culture](https://www.hickory.com.au/leadership-culture/) (Hickory)
4. [Featured in AMT Magazine: Hickory Group, building for the future](https://www.hickory.com.au/news/hickory-group-building-for-the-future/) (Hickory)
5. [Victoria's leaders in manufacturing recognised](https://www.hickory.com.au/news/victorias-leaders-in-manufacturing-recognised/) (Hickory)
6. [How this award-winning Melbourne high-rise came together piece by piece](https://createdigital.org.au/award-winning-melbourne-high-rise-came-together-piece-by-piece/) (create digital (Engineers Australia))
7. [Hickory: building innovation](https://businessviewoceania.com/hickory-building-innovation/) (Business View Oceania)
8. [Hickory strengthens executive leadership to drive next phase of growth](https://www.hickory.com.au/news/sally-capp-joins-hickory-executive-leadership-team/) (Hickory)
9. [In the media: meet the builder aiming for a 5pc profit margin](https://www.hickory.com.au/news/in-the-media-meet-the-builder-aiming-for-a-5pc-profit-margin/) (Hickory)
