Was a venture-backed builder that ran its own component and mass timber factories for apartments; it filed for Chapter 11 in 2021.

- **Operating status:** Closed in 2021. ENR and Bisnow reported that it filed for Chapter 11 in June 2021 and said it would wind down its US business. Construction Dive reported that its Spokane and Tracy factories were sold that summer. [2][4]
- **Momentum:** Unknown
- **Ownership:** Unknown
- **Headquarters:** Menlo Park, California, United States
- **Founded:** 2015
- **Role:** Manufacturer, Builder, Designer
- **Method:** Panels
- **Material:** Mass timber
- **Product:** Panels, Components
- **Builds:** Multifamily, Single-family, Commercial, Senior housing
- **Website:** https://www.katerra.com/ (no working site of its own when checked)

Checked 2026-11-20. Page: https://nowcitylabs.com/fieldguide/construction/p/katerra/

## Summary by the Lead Analyst

Katerra was a venture-backed builder founded in 2015 that designed apartments, made components and mass timber in its own plants and built them itself. Press reports more than $2 billion raised, plants in Phoenix, Tracy and Spokane Valley, and about 7,500 employees at its peak. It filed for Chapter 11 in June 2021 and its Spokane and Tracy plants were sold. Not found in the sources read: a count of buildings delivered and the outcome for creditors and workers.

Verify first: Closed in 2021. The Spokane and Tracy plants were sold to Mercer International and Volumetric Building Companies.

## What it is

Katerra was founded in 2015 and set out to cut the cost of apartment construction by designing buildings, making their components in its own factories and building them itself. It bought architecture, engineering and general contracting firms along the way. [1][3]
It raised more than $2 billion, most of it from SoftBank, and grew to about 7,500 employees. It ran component factories in Phoenix and in Tracy, California, and a cross-laminated timber plant in Spokane Valley, Washington. [1][3][5]
The company filed for Chapter 11 in June 2021. ENR reported about 6,400 employees across all units at the time. Mercer International bought the Spokane timber plant and Volumetric Building Companies bought the Tracy plant. [2][6]

## Key facts

- Founded: 2015 [1]
- Headquarters: Menlo Park, California [3]
- Factory: Phoenix, Tracy and Spokane Valley; all closed or sold [4][5]
- Funding raised: More than $2 billion [1]
- Employees: Grew to about 7,500, per Architect magazine [3]
- Ownership: SoftBank was reported to be majority owner at the end [1]

## Production and technology

- Production: No data
- Technology: Robotics, Company said its Tracy plant used highly automated lines and robotics [5]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Panels
- Materials: Mass timber
- Products: Panels, Components
- Building markets: Multifamily, Single-family, Commercial, Senior housing
- Factory: No data
- Markets served: Washington
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Strong · Checked Nov 2026

## Serves

- Washington (US-WA) [4]

## Timeline

- 2015 (founded): Co-founded by Michael Marks, Fritz Wolff and Jim Davidson. [1]
- 2018-01 (funding): Raised $865 million in a round led by SoftBank's Vision Fund. [4]
- 2018 (acquisition): Between May and October bought Michael Green Architecture, Lord Aeck Sargent and Bristlecone Construction. [4]
- 2019-01 (funding): Raised $700 million at a reported $4 billion valuation. [4]
- 2019-09 (factory): Opened a 270,000 square foot mass timber factory in Spokane Valley, Washington. [5]
- 2019-12 (layoffs): Closed its 250,000 square foot Phoenix factory and laid off 200 workers. [5]
- 2020-05 (leadership): Announced a $200 million raise from SoftBank; Paal Kibsgaard replaced Michael Marks as chief executive. [4]
- 2020-06 (layoffs): Laid off a further 7 percent of staff, its fifth round of cuts since fall 2019. [4]
- 2020-12 (funding): SoftBank put in a further $200 million after signs of financial trouble became public in December 2020. Bisnow wrote that the investment reportedly made SoftBank the majority owner. [1][3]
- 2021-05 (layoffs): SoftBank's Vision Fund declined to invest further and about 730 employees were laid off. [2]
- 2021-06 (bankruptcy): Filed for Chapter 11 in federal bankruptcy court in Houston with $35 million of financing from a SoftBank affiliate. [1][2]
- 2021-08 (milestone): In summer 2021 the Spokane timber plant sold to Mercer International for $50 million and the Tracy plant assets sold to Volumetric Building Companies. [4][6]

## What public reporting says happened

- Katerra's own statement cited the pandemic, unsuccessful attempts to secure more capital and business, and the insolvency proceedings of a former lender, which it said left it unable to procure bonding for projects. Architect magazine identified the lender as Greensill Capital. [2][3]
- ENR reported, citing the bankruptcy filing, that the company raised close to $3 billion in equity over six years without generating a profit and lost money on many projects through cost overruns. The filing named maximum price guarantees and discounts for certain legacy customers as a large source of the losses. [2]
- Writing in Architect magazine, Daniel Davis named three shortcomings: a lack of focus, the wrong talent, and an inability to generate efficiencies from vertical integration. [3]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Specifics published (level 2)

Architect magazine reported that the Spokane Valley cross-laminated timber plant, opened in 2019, raised North American mass timber capacity by about half. Timber Processing put its capacity at about 140,000 cubic meters a year. No factory waste or disassembly data was found.

- Evidence: Architect magazine said the Spokane Valley plant raised North American mass timber capacity by about half. [3]
- Evidence: Timber Processing put the plant's capacity at about 140,000 cubic meters of panels a year. [6]
- Gap: Factory waste and offcut data, timber sourcing, and any design for disassembly.

### Energy and Carbon: Claims only (level 1)

The 165,000 square foot Catalyst building in Spokane, built with its timber, won a 2020 AIA Innovation Award. No measured energy use or embodied carbon result for any Katerra building, and no verifier, was found in the sources read.

- Evidence: The 165,000 square foot Catalyst building in Spokane, built with its timber, won a 2020 AIA Innovation Award. [3]
- Gap: Measured energy use or embodied carbon for any Katerra building, and who verified it.

### Cost and Access: Specifics published (level 2)

Press names apartment and senior housing projects in Spokane and a January 2020 contract worth $650 million for 8,000 homes in Saudi Arabia. ENR reported cost overruns on many projects. No delivered cost per unit, rents or count of homes finished was found.

- Evidence: Construction Dive named Spokane projects including River House Senior Apartments and a $650 million contract for 8,000 homes in Saudi Arabia. [4]
- Evidence: ENR reported cost overruns on its projects. [2]
- Gap: Cost per unit on completed buildings, counts of homes finished, and who lives in them.

### Workforce: Third-party evidence (level 3)

Construction Dive reported 200 layoffs with the Phoenix closure in December 2019 and a fifth round of cuts by June 2020. ENR reported about 730 layoffs in May 2021. Architect magazine reported a class action by three employees over termination notice; its outcome was not found.

- Evidence: Construction Dive reported 200 layoffs with the Phoenix closure in December 2019. [5]
- Evidence: Bisnow, citing The Information, reported that an executive told staff there were no funds for severance or unused paid time off. [1]
- Evidence: Architect magazine reported that three employees filed a class action over inadequate notice of termination. [3]
- Gap: The outcome of the worker lawsuit, final job loss totals by site, and any factory safety record.

### Delivery Record: Third-party evidence (level 3)

Named press reports six years of operation, more than $2 billion raised, three factories and a Chapter 11 filing in June 2021. Two plants were sold in August 2021. No complete list of buildings delivered and no final outcome for creditors were found.

- Evidence: Bisnow reported more than $2 billion raised and the Chapter 11 filing in June 2021. [1]
- Evidence: Construction Dive reported the 2021 sale of the Tracy and Spokane plants. [4]
- Evidence: The Real Deal, cited by Architect magazine, reported in 2019 that roughly a dozen projects had not been completed. [3]
- Gap: A complete list of buildings delivered, and the final outcome of the bankruptcy for creditors.

## Sources

1. [SoftBank-Backed Construction Startup Katerra Files For Chapter 11](https://www.bisnow.com/national/news/construction-development/construction-startup-katerra-going-belly-up-report-109093) (Bisnow)
2. [Katerra Files for Bankruptcy, Seeks to Reorganize US Operations](https://www.enr.com/articles/51869-katerra-files-for-bankruptcy-seeks-to-reorganize-us-operations) (Engineering News-Record)
3. [Katerra's $2 Billion Legacy](https://www.architectmagazine.com/technology/katerras-2-billion-legacy_o) (Architect Magazine)
4. [What does Katerra's demise mean for the contech and modular industries?](https://www.constructiondive.com/news/what-does-katerras-demise-mean-for-the-contech-and-modular-industries/608037/) (Construction Dive)
5. [Katerra closing Phoenix modular building facility, laying off 200 workers](https://www.constructiondive.com/news/katerra-closing-phoenix-modular-building-facility-laying-off-200-workers/568807/) (Construction Dive)
6. [Mercer Purchases Katerra CLT Facility](https://www.timberprocessing.com/mercer-purchases-katerra-clt-facility/) (Timber Processing)