Skip to content

Field Guides / Industrialized Construction / Europe

Kleusberg

Volumetric manufacturer and general contractor · Wissen, Rhineland-Palatinate, Germany · checked November 26, 2026

German maker of steel modular buildings and rental space units, with plants in Wissen, Kabelsketal and Morsbach.

Where it standsIt held a topping-out for a new production hall in Wissen in September 2026 as part of a 50 million euro plant program due to finish in 2028.[3][6][7]

Lead Analyst summary

Compiled from the five specialist findings. Read the findings.

A German modular builder founded in 1948 that makes steel room modules for schools, offices and other public and commercial buildings, rents mobile space units and builds in-hall offices. It lists production plants at Wissen, Kabelsketal and Morsbach. Trade press reports 65 to 80 modules a week at Wissen in 2026, a 50 million euro upgrade aiming for 150 a week, and KUKA welding robots planned near Halle from 2027. Owners and audited figures were not found.

Verify first. Whether the Wissen upgrade and the robot line reach the stated output by 2028.

What it is

Kleusberg builds modular buildings for industry, trade, public clients and the construction industry, rents mobile space units and makes rooms that are built inside factory halls. Its locations page lists production at Wissen (Werk 1 and Werk 8), Kabelsketal-Dölbau near Halle (Werk 2) and Morsbach (Werk 7), refurbishment yards for rental units at Remseck, Kabelsketal-Gröbers, Frankenthal and Hövels, a timber competence center in Berlin and sales offices across Germany and in Austria.[1][2]

In September 2026 the company and the trade magazine bau.bi reported a 50 million euro program at the Wissen-Wisserhof plant, started in 2023 and due to finish in 2028, with robotic welding, semi-automated lines and powder coating. bau.bi put output at 65 to 80 modules a week, aiming for up to 150. The Rhein-Zeitung reported nearly 600 staff at Wisserhof, 252 of them in production. A rotation school for the city of Frechen is being built from 319 steel modules.[3][6][7][8]

In October 2025 KUKA announced it would supply five robots to weld floor and ceiling frames at the Kleusberg plant near Halle from 2027, more than 2,000 meters of frame a week on over 1,000 square meters of floor space.[4]

At a glance

Status
Active
Role
Volumetric manufacturer and general contractor
Method
Volumetric modules
Product
Room modules
Builds
Commercial
Headquarters
Wissen, Rhineland-Palatinate, Germany
Factory
Wissen, Germany +3
Serves
Germany, Austria
Founded
1948
Plant capital
50,000,000 EUR to build one plant, 2026[6]

Production, technology and cost

How the company organizes production, the production technology a source documents, and where a source says it cuts construction cost.

Production

Large central factory
Module plants at Wissen and Kabelsketal, rental refurbishment yards[2]

Technology

Robotics
Five KUKA welding robots for floor and ceiling frames, planned 2027[4]

Cuts cost through

On record
No data
Was this page useful?Send a correction

Kleusberg

Active

Visit Kleusberg

Work with us.

Commission deeper research and reporting. Or get help building your industrialized construction value chain: partnerships, cost estimates and deal structures.