Austrian maker of cross-laminated timber panels, cut to project plans at two plants in Styria and Carinthia.

- **Operating status:** Active. Its site is live and lists two Austrian production companies, and a 2024 trade table gives it the same 150,000 cubic meter capacity for 2023 and 2024. [1][3]
- **Momentum:** Stable
- **Ownership:** Part of Johann Offner Unternehmensgruppe
- **Headquarters:** Teufenbach-Katsch, Styria, Austria
- **Role:** Manufacturer, Supplier
- **Method:** Panels
- **Material:** Mass timber
- **Product:** Panels
- **Builds:** Single-family, Multifamily, Commercial
- **Website:** https://www.klh.at/en/ (loaded when checked)

Checked 2026-11-26. Page: https://nowcitylabs.com/fieldguide/construction/p/klh-massivholz/

## Summary by the Lead Analyst

An Austrian cross-laminated timber maker owned by the Offner family group since 2012. It developed CLT with TU Graz in 1996, opened its Katsch plant in 1999 and a second plant at Wiesenau in 2020. A 2024 trade table lists 150,000 cubic meters of capacity across both. It holds ISO 14001, PEFC and FSC chain of custody and a registered EPD, but publishes no headcount, waste figure or carbon result in the sources read.

Verify first: The plant-by-plant capacity, since company pages give 125,000 and 150,000 cubic meters for Wiesenau alone.

## What it is

KLH makes cross-laminated timber panels from technically dried timber glued with a formaldehyde-free PUR adhesive, then cuts them with CNC machines to the client's plans and delivers them to site for erection by timber contractors. It also supplies raw panels to outside CNC shops. Panels are used in houses, multistory housing, public, office, industrial and commercial buildings, and its references include a ten-flat modular social housing project. [7][10]
The company says it developed cross-laminated timber with the Technical University of Graz in 1996 and opened its Teufenbach-Katsch plant in 1999. A second plant at Wiesenau, near Bad St. Leonhard in Carinthia, was started in 2019 with European Regional Development Fund co-financing and made its first panel at the end of July 2020. The company planned up to 83 jobs there and about 150,000 cubic meters a year at full build-out. [1][2][5]
KLH has been part of the Johann Offner group, a family business based in Wolfsberg with more than 700 employees across tools, timber and garden equipment, since 2012. A wholly owned subsidiary, KLH UK, sells and designs CLT buildings in the United Kingdom. [6][8]

## Key facts

- Headquarters: Teufenbach-Katsch, Styria, Austria [1]
- Factory: Teufenbach-Katsch and Wiesenau, Austria [1]
- Capacity: 150,000 cubic meters a year, 2023 (2024 target same) [3]
- Ownership: Johann Offner group since 2012 [1][6]
- Serves: Austria, United Kingdom, Australia, Norway [1][8]

## Production, technology and cost

- Production: Large central factory, Two Austrian plants; panels tested for the Australian and New Zealand markets [1][8]
- Technology: Automated production, CNC cutting and automatic full-surface glue application [7]
- Cuts cost through: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Panels
- Materials: Mass timber
- Products: Panels
- Building markets: Single-family, Multifamily, Commercial
- Factory: Teufenbach-Katsch, Austria; Bad St. Leonhard im Lavanttal, Austria
- Markets served: Austria, United Kingdom, Australia, Norway
- Demonstrated scale: Not published
- Annual capacity: Not published
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Strong · Checked Nov 2026

## Factories

- Teufenbach-Katsch, Styria, Austria: Opened 1999 and extended in stages [1]
- Bad St. Leonhard im Lavanttal, Carinthia, Austria: Wiesenau plant; first CLT element made in July 2020 [1][5]

## Serves

- Austria (AT) [1]
- United Kingdom (GB) [8]
- Australia (AU) [1][8]
- Norway (NO) [1]

## Timeline

- 1996 (milestone): Developed cross-laminated timber with the Technical University of Graz, per the company. [1]
- 1999 (factory): Opened its production plant in Teufenbach-Katsch, later extended in stages. [1]
- 2012 (acquisition): KLH Massivholz GmbH joined the Johann Offner group. [6]
- 2019 (factory): KLH Massivholz Wiesenau GmbH began building a second CLT plant, planned for about 150,000 cubic meters a year and up to 83 jobs. [2]
- 2020-07 (factory): The Wiesenau plant produced its first CLT element after about 15 months of construction. [5]
- 2024-11 (milestone): A trade press capacity table listed KLH at 150,000 cubic meters for 2023 and the same target for 2024. [3]
- 2026-10 (milestone): A revised environmental product declaration for CLT made at Wiesenau was registered, valid to January 2031. [9]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4.

### Materials and Circularity: Third-party evidence (level 3)

The company holds PEFC chain of custody for both plants and FSC for Katsch, certificates issued by third parties, and says it burns by-products for its own energy. No offcut or waste tonnage and no design-for-disassembly evidence was found.

- Evidence: The company lists PEFC certificates for Katsch and Wiesenau and an FSC certificate for Katsch. [1]
- Evidence: The company says by-products supply its own energy and raw timber comes from PEFC or FSC certified forests. [1]
- Gap: Factory waste by weight and any record of panels recovered and reused.

### Energy and Carbon: Third-party evidence (level 3)

An EPD for CLT made at Wiesenau is registered with the International EPD System, version dated October 2026, and a roof solar array of about 4,200 modules and up to 1,800 kWp powers that plant. The impact results were not shown on the registry page read.

- Evidence: EPD-IES-0027209:002 for KLH CLT (Wiesenau), version dated October 15, 2026, is valid to January 26, 2031. [9]
- Evidence: About 4,200 PV modules on the Wiesenau roofs deliver up to 1,800 kWp, used almost entirely in production. [4]
- Gap: The global warming potential per cubic meter from the EPD, and annual plant energy use.

### Cost and Access: Claims only (level 1)

No panel price was found. The company shows a ten-flat modular social housing project among its references but gives no cost.

- Evidence: The application page shows the Nerf Homes project, ten social housing flats built in modular timber, as a reference. [10]
- Gap: Price per cubic meter and the number of affordable homes built with its panels.

### Workforce: Specifics published (level 2)

The company said the Wiesenau plant would create up to 83 jobs in 2019. No current KLH headcount was found; the parent group reports more than 700 employees across all its businesses.

- Evidence: The Wolfsberg project page planned up to 83 new jobs at the Wiesenau plant. [2]
- Evidence: The Offner group reports more than 700 employees worldwide. [6]
- Gap: KLH headcount by plant, training and safety data.

### Delivery Record: Third-party evidence (level 3)

Trade press confirms the Wiesenau start-up in 2020 and lists 150,000 cubic meters of capacity for 2023, with the same target for 2024. The company has made CLT at Katsch since 1999. No total of panels or buildings delivered was found.

- Evidence: EUWID reported the first CLT element at Wiesenau at the end of July 2020. [5]
- Evidence: Timber-Online listed KLH at 150,000 cubic meters for 2023 and the same target for 2024. [3]
- Gap: Annual output actually produced, turnover and buildings delivered.

## Sources

1. [Company](https://www.klh.at/en/company/) (KLH Massivholz)
2. [Project KLH Wolfsberg](https://www.klh.at/en/news/project-klh-wolfsberg/) (KLH Massivholz)
3. [CLT market keeps growing](https://www.timber-online.net/wood_products/2024/11/clt-market-keeps-growing.html) (Timber-Online)
4. [Green energy](https://www.klh.at/en/news/green_energy/) (KLH Massivholz)
5. [KLH runs CLT production up to speed in Wiesenau](https://www.euwid-wood-products.com/news/companies/klh-runs-clt-production-up-to-speed-in-wiesenau-161220/) (EUWID Wood Products and Panels)
6. [Offner group home page](https://www.offner.at/) (Johann Offner)
7. [Manufacture and assembly](https://www.klh.at/en/manufacture-assembly/) (KLH Massivholz)
8. [KLH UK home page](https://www.klhuk.com/) (KLH UK)
9. [KLH CLT (Wiesenau) EPD](https://environdec.com/library/epd27209) (International EPD System)
10. [Areas of application and product advantages](https://www.klh.at/en/areas-of-application-product-advantages/) (KLH Massivholz)