# Legal & General Modular Homes

Made cross-laminated timber modular houses at Sherburn-in-Elmet for its parent, Legal & General; production ended in 2023.

- **Operating status:** Closed in 2023. Legal & General stopped new production in May 2023; the Sherburn-in-Elmet factory closed that summer and the business moved to a phased wind down. [1][6][7]
- **Momentum:** Contracting
- **Ownership:** Part of Legal & General
- **Headquarters:** London, England, United Kingdom
- **Founded:** 2016
- **Role:** Manufacturer, Developer
- **Method:** Volumetric modules
- **Material:** Mass timber
- **Product:** Whole homes
- **Builds:** Single-family, Multifamily, Affordable housing
- **Website:** https://www.legalandgeneral.com/modular-homes/ (no working site of its own when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/legal-and-general-modular-homes/

## Summary by the Lead Analyst

The modular housing arm of the insurer Legal & General, which built cross-laminated timber houses in a 550,000 sq ft plant near Selby rated for 3,500 homes a year. By late 2022 its pipeline was about 2,200 homes in total. Production stopped in May 2023 with 475 staff at risk, and cumulative pre-tax losses reached 359 million pounds by 2023. Schemes were completed in Broadstairs and Selby, while homes in Bristol had to be dismantled over foundation faults.

Verify first: Whether aftercare and warranties for its homes are still being honored by Legal & General now the unit is wound down.

## What it is

Legal & General opened its modular homes factory at Sherburn-in-Elmet in 2016. The 550,000 sq ft plant was designed to build 3,500 homes a year. Its two and three bedroom houses used cross-laminated timber, while a planned apartment product moved to a concrete and steel hybrid. [1][5]
Its schemes included 154 homes at Portholme Road in Selby, up to 30 percent of them affordable and designed for an EPC A rating, plus sites in Broadstairs and Bristol. [4][6]
In May 2023 it stopped new production and consulted on making most of its 475 staff redundant. Later accounts describe a phased wind down to finish existing developments; the company, Legal & General Homes Modular Limited, was still listed as active on Companies House in November 2026. [1][6][9]

## Key facts

- Founded: 2016 [1]
- Factory: 550,000 sq ft, Sherburn-in-Elmet; closed 2023 [1][7]
- Employees: 475 when production stopped, May 2023 [1]
- Ownership: Unit of Legal & General [1]
- Serves: United Kingdom [2]

## Production and technology

- Production: Large central factory, One 550,000 sq ft plant near Selby [1][5]
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: Mass timber
- Products: Whole homes
- Building markets: Single-family, Multifamily, Affordable housing
- Factory: Sherburn-in-Elmet, United Kingdom
- Markets served: United Kingdom
- Demonstrated scale: Not published
- Annual capacity: 3,500 homes a year, reported 2023
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Strong · Checked Nov 2026

## Measured

- Capacity per year: 3,500 homes/yr capacity, reported 2023 (design capacity reported by Housing Today) [1]
- Factory floor area: 550,000 sq ft factory floor area [1]

## Factories

- Sherburn-in-Elmet, North Yorkshire, United Kingdom: 550,000 sq ft, Opened 2016; production stopped May 2023, closed summer 2023 [1][5]

## Serves

- United Kingdom (GB) [2]

## Timeline

- 2016 (founded): Opened the modular homes factory at Sherburn-in-Elmet. [1]
- 2017-06 (leadership): Rosie Toogood, a former Rolls-Royce executive, was hired to run the business. [1]
- 2019-12 (milestone): Had mainly made prototypes, plus eight homes for Silva Homes in Berkshire; said its apartments would use concrete and steel instead of timber. [5]
- 2020-05 (milestone): Won planning for 154 homes at Portholme Road, Selby, as the factory reopened after the Covid lockdown with 75 of 250 staff back. [4]
- 2023-05 (layoffs): Stopped new module production and began consultation on making most of its 475 staff redundant. [1][2]
- 2023-07 (milestone): Began dismantling dozens of completed homes at the 185 home Bonnington Walk scheme in Bristol over foundation problems. [8]
- 2023-11 (closure): Construction Enquirer reported the factory had closed in summer 2023 and that site commitments would be wound down by June 2025. [7]
- 2024-09 (closure): Accounts for 2023 showed a 61.1 million pound pre-tax loss and a phased wind down, with Bristol as the final live site. [6]

## What public reporting says happened

- Legal & General said it could not secure the scale of pipeline needed to cover the factory's fixed costs. [1][2]
- The company cited long planning delays and the Covid pandemic as reasons its site pipeline fell short. [1][3]
- Construction Enquirer reports planning hold ups, mould in units stored outside the factory and foundation faults in Bristol as problems that came to a head. [7]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No factory waste figure, timber certification or disassembly evidence was found in the sources read.

- Gap: Waste by weight and timber sourcing for the CLT houses.

### Energy and Carbon: Specifics published (level 2)

The company said in May 2020 that all 154 homes at its Selby scheme were designed to reach EPC A. No measured performance or embodied carbon figure was found.

- Evidence: Selby homes designed to achieve EPC A. [4]
- Gap: Lodged EPC certificates and embodied carbon per home.

### Cost and Access: Specifics published (level 2)

The Selby scheme planned up to 30 percent affordable homes, per the company in 2020. No price per home or count of affordable homes delivered was found.

- Evidence: Up to 30 percent of the 154 Selby homes affordable. [4]
- Gap: Prices and affordable homes handed over.

### Workforce: Third-party evidence (level 3)

Named press reports 475 staff when production stopped in May 2023 and a consultation to make most of them redundant, with a small team kept for aftercare.

- Evidence: 475 employed; majority of roles to be made redundant. [1]
- Gap: Final redundancy count and redeployment within the group.

### Delivery Record: Third-party evidence (level 3)

Built in a plant rated for 3,500 homes a year but had won a pipeline of about 2,200 homes in total by late 2022. Completed Broadstairs and Selby schemes; cumulative pre-tax losses reached 359 million pounds over eight years to 2023.

- Evidence: Cumulative pre-tax loss of 359 million pounds; completed schemes at Broadstairs and Selby. [6]
- Evidence: Pipeline of around 2,200 homes in total. [1]
- Gap: Total homes delivered by the factory.

## Sources

1. [L&G to cease production at flagship modular housing factory](https://www.housingtoday.co.uk/news/landg-to-cease-production-at-flagship-modular-housing-factory/5123028.article) (Housing Today)
2. [Legal & General quits modular housing factory](https://www.theconstructionindex.co.uk/news/view/legal-general-quits-modular-housing-factory) (The Construction Index)
3. [L&G to shut down Selby modular factory](https://placeyorkshire.co.uk/lg-to-shut-down-selby) (Place Yorkshire)
4. [Legal & General achieves planning for major modular homes scheme in Selby as factory reopens following Covid lockdown](https://group.legalandgeneral.com/newsroom/press-releases/2020/5/legal-general-achieves-planning-for-major-modular-homes-scheme-in-selby-as-factory-reopens-following-covid-lockdown/) (Legal & General Group)
5. [L&G ditches structural timber in modular flats](https://www.building.co.uk/news/landg-ditches-structural-timber-in-modular-flats/5103249.article) (Building)
6. [L&G's failed modular housing business records 61.1m loss as it continues phased wind-down](https://www.building.co.uk/landgs-failed-modular-housing-business-records-611m-loss-as-it-continues-phased-wind-down/5131906.article) (Building)
7. [L&G modular homes foray amassed 295m of losses](https://www.constructionenquirer.com/2023/11/06/lg-modular-homes-foray-amassed-295m-of-losses) (Construction Enquirer)
8. [L&G Modular forced to dismantle new Bristol homes](https://www.constructionenquirer.com/2023/07/27/lg-modular-forced-to-dismantle-new-bristol-homes) (Construction Enquirer)