- **Operating status:** Active. A September 2025 release said test runs at its new 160,000 cubic meter Äänekoski Kerto LVL mill would begin that October, with production starting at the end of 2026. [5]
- **Momentum:** Expanding
- **Ownership:** Part of Metsä Group
- **Headquarters:** Espoo, Uusimaa, Finland
- **Role:** Manufacturer, Supplier
- **Method:** Other
- **Material:** Mass timber
- **Product:** Components, Panels
- **Builds:** Multifamily, Commercial
- **Website:** https://www.metsagroup.com/metsawood/ (loaded when checked)

Checked 2026-11-26. Page: https://nowcitylabs.com/fieldguide/construction/p/metsa-wood/

## Summary by the Lead Analyst

The engineered wood arm of Metsä Group, with 1,600 staff and EUR 0.5 billion of 2025 sales. It makes Kerto LVL at Lohja and Punkaharju, about 270,000 cubic meters a year combined, and is starting a EUR 300 million, 160,000 cubic meter LVL mill at Äänekoski at the end of 2026. A third-party verified EPD revised in 2026 gives 119 kg CO2e of fossil emissions per cubic meter for A1 to A3. Trade press reports its Suolahti plywood mill closed at the end of May 2026.

Verify first: Whether the Äänekoski mill reached commercial production at the end of 2026 as planned.

## What it is

Metsä Wood makes engineered wood: Kerto laminated veneer lumber beams and panels, birch and spruce plywood and upgraded wood products, sold to construction, industrial and distribution customers. Kerto is used in beams and in floor and wall elements. The company reports about 1,600 employees and EUR 0.5 billion of sales in 2025, and it is part of Metsä Group. [1][10]
Kerto development began at Punkaharju in 1974 and production moved to Lohja in 1980. Lohja now makes about 90,000 cubic meters a year and Punkaharju about 180,000 cubic meters of LVL plus 55,000 of birch plywood. Plywood is also made at Pärnu in Estonia. In England, sites at Boston and King's Lynn make and distribute I-joists, mouldings and treated timber. [2][3][7][8][9][10]
A third Kerto mill at Äänekoski, a EUR 300 million investment with two lines and 45,000 square meters of production area, was set to begin test runs in October 2025. The company says it will add about 160,000 cubic meters a year, a 50 percent increase in Kerto capacity, and about 150 jobs. Trade press reports Metsä Group ended softwood plywood production at Suolahti at the end of May 2026. [4][5][10][14]

## Key facts

- Headquarters: Espoo, Finland [1]
- Factory: Lohja, Punkaharju, Äänekoski (FI); Pärnu (EE) [1]
- Employees: 1,600 (company) [1]
- Ownership: Part of Metsä Group [1]
- Capacity: Kerto LVL 270,000 cubic meters a year before Äänekoski [2][3]

## Production, technology and cost

- Production: Large central factory, Mills in Finland and Estonia, plus two sites in England [1]
- Technology: No data
- Cuts cost through: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: No data
- Materials: Mass timber
- Products: Components, Panels
- Building markets: Multifamily, Commercial
- Factory: 7 factories: Lohja, Finland; Punkaharju, Finland; Äänekoski, Finland and 4 more
- Markets served: Finland, Estonia, United Kingdom
- Demonstrated scale: No data
- Annual capacity: Not published
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Plant capital: 300,000,000 EUR to build one plant, 2025 (company-reported investment in the Äänekoski Kerto LVL mill) [5]

## Factories

- Lohja, Uusimaa, Finland: Kerto LVL, about 90,000 cubic meters a year, 140 staff [2]
- Punkaharju, South Savo, Finland: Kerto LVL 180,000 and birch plywood 55,000 cubic meters a year [3]
- Äänekoski, Central Finland, Finland: 484,376 sq ft, New Kerto LVL mill, 45,000 sq m production area, start planned late 2026 [4][5]
- Äänekoski, Central Finland, Finland: Veneer mill [1]
- Pärnu, Pärnu County, Estonia: Birch plywood, 50,000 cubic meters a year, 220 staff [7]
- King's Lynn, Norfolk, United Kingdom: I-joists and treated timber, 38 staff [9]
- Boston, Lincolnshire, United Kingdom: Mouldings, door frames and panel products, 250 staff [8]

## Serves

- Finland (FI) [1]
- Estonia (EE) [7]
- United Kingdom (GB) [8][9]

## Timeline

- 1974 (milestone): Metsäliitto began developing Kerto LVL at its Punkaharju mill. [10]
- 1980 (factory): Kerto production moved to Lohja, per the company history; the Lohja mill page gives 1981. [10][2]
- 2001 (factory): Kerto LVL production started at Punkaharju, alongside birch plywood made there since 1964. [3]
- 2018 (factory): The Pärnu birch plywood mill in Estonia was established. [7]
- 2025-09 (factory): Announced that test runs on the first line of the Äänekoski mill would begin in October, with production planned for the end of 2026. [5]
- 2026-05 (milestone): Published a revised Kerto LVL EPD cutting fossil GWP for A1 to A3 from 280 to 119 kg CO2e per cubic meter. [11]
- 2026-05 (closure): Metsä Group ended softwood plywood production at its Suolahti mill, which the company listed with 180 staff, per trade press. [6][14]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4.

### Materials and Circularity: Claims only (level 1)

The company says Kerto beams use about half the material of comparable glulam and that Äänekoski will use about 400,000 cubic meters of Finnish logs. No figure for mill residues, offcut use or certified wood share was found in the sources read.

- Evidence: The 2026 Kerto history article says LVL beams use roughly half the material of comparable glulam. [10]
- Evidence: The Äänekoski mill will use about 400,000 cubic meters of log procured from Finland. [4]
- Gap: Residue and offcut handling by mill and the share of certified wood.

### Energy and Carbon: Third-party evidence (level 3)

A third-party verified EPD for seven Kerto LVL products is registered as EPD-IES-0026805:002, version dated February 2026. The company reports fossil GWP for A1 to A3 fell from 280 to 119 kg CO2e per cubic meter, citing fossil-free electricity at all its mills.

- Evidence: EPD-IES-0026805:002 for Kerto LVL is valid to February 15, 2031. [13]
- Evidence: The May 2026 release gives 119 kg CO2e per cubic meter, A1 to A3, down from 280. [11]
- Gap: The named verifier and results for the plywood products.

### Cost and Access: No public evidence (level 0)

No price for Kerto LVL or plywood and no count of affordable homes built with its products was found.

- Gap: Published prices and housing projects that used its products.

### Workforce: Specifics published (level 2)

The company publishes staff counts by site: about 1,600 in total, 500 at Punkaharju, 140 at Lohja, 220 at Pärnu, 250 at Boston and 38 at King's Lynn. Its Suolahti mill, listed with 180 staff, closed at the end of May 2026 per trade press; Äänekoski adds about 150 jobs.

- Evidence: EUWID reported Metsä Group ended softwood plywood production at Suolahti at the end of May 2026; the company page lists 180 employees there. [6][14]
- Evidence: The Äänekoski release says the mill will employ about 150 people. [5]
- Gap: What happened to Suolahti staff, and safety data.

### Delivery Record: Third-party evidence (level 3)

Kerto LVL has been made at Lohja since 1980 (company history) or 1981 (mill page) and since 2001 at Punkaharju, with stated capacity of about 270,000 cubic meters a year before Äänekoski. The Äänekoski test start planned for October 2025 is reported by the company only.

- Evidence: The Lohja page gives about 90,000 cubic meters of Kerto LVL a year and Kerto production since 1981. [2]
- Evidence: The Punkaharju page gives 180,000 cubic meters of Kerto LVL a year. [3]
- Evidence: The company reports EUR 0.5 billion of sales in 2025. [1]
- Gap: Actual output by mill and independent confirmation of the Äänekoski start-up.

## Sources

1. [About Metsä Wood](https://www.metsagroup.com/metsawood/about-metsa-wood/) (Metsä Wood)
2. [Lohja Kerto LVL mill](https://www.metsagroup.com/metsawood/about-metsa-wood/production-units/lohja-kerto-lvl-mill/) (Metsä Wood)
3. [Punkaharju Kerto LVL and plywood mill](https://www.metsagroup.com/metsawood/about-metsa-wood/production-units/punkaharju-kerto-lvl-and-plywood-mill/) (Metsä Wood)
4. [Äänekoski Kerto LVL mill](https://www.metsagroup.com/metsawood/about-metsa-wood/projects/future-aanekoski-kerto-lvl-mill/) (Metsä Wood)
5. [Test production is starting at new Äänekoski Kerto LVL mill](https://www.metsagroup.com/metsawood/news-and-publications/news/2025/test-production-is-starting-at-new-aanekoski-kerto-lvl-mill/) (Metsä Wood)
6. [Suolahti plywood mill](https://www.metsagroup.com/metsawood/about-metsa-wood/production-units/suolahti-plywood-mill/) (Metsä Wood)
7. [Pärnu plywood mill](https://www.metsagroup.com/metsawood/about-metsa-wood/production-units/parnu-plywood-mill/) (Metsä Wood)
8. [Boston site](https://www.metsagroup.com/metsawood/about-metsa-wood/production-units/boston-site/) (Metsä Wood)
9. [King's Lynn site](https://www.metsagroup.com/metsawood/about-metsa-wood/production-units/kings-lynn-site/) (Metsä Wood)
10. [Five decades of engineered wood development](https://www.metsagroup.com/metsawood/news-and-publications/articles/fifty-years-innovation-kerto-lvl/) (Metsä Wood)
11. [New carbon values for Kerto LVL have been published](https://www.metsagroup.com/metsawood/news-and-publications/news/2026/new-carbon-values-for-kerto-lvl/) (Metsä Wood)
12. [Metsä Wood](https://en.wikipedia.org/wiki/Mets%C3%A4_Wood) (Wikipedia)
13. [Kerto LVL EPD](https://www.environdec.com/library/epd26805) (International EPD System)
14. [Metsä Group closes softwood plywood mill in Suolahti](https://www.euwid-wood-products.com/news/companies/metsae-group-closes-softwood-plywood-mill-in-suolahti-010726/) (EUWID Wood Products and Panels)