# Misawa Homes

Tokyo maker of factory-built wood panel homes, made to order in Japanese plants; part of Prime Life Technologies.

- **Operating status:** Active. A July 2025 release from its parent describes shared trucking between Misawa plants in Gunma, Aichi, Okayama and Fukuoka and other group plants. [1]
- **Momentum:** Unknown
- **Ownership:** Part of Prime Life Technologies
- **Headquarters:** Tokyo, Japan
- **Founded:** 1967
- **Role:** Manufacturer, Builder
- **Method:** Panels
- **Product:** Panels, Components
- **Builds:** Single-family
- **Website:** https://www.misawa.co.jp/ (loaded when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/misawa-homes/

## Summary by the Lead Analyst

A Tokyo builder of factory-made wood panel homes, now a wholly owned company of Prime Life Technologies, the 2020 housing venture of Toyota and Panasonic. Its parent names four Misawa plants, in Gunma, Aichi, Okayama and Fukuoka. The Gunma plant makes components one order at a time. In 2013 the land ministry reported 1,619 Misawa prefab homes suspected of missing wall bracing. Output, prices and current plant capacity are not published in the sources read.

Verify first: Whether the 2013 bracing remediation was completed, and current output of the four plants.

## What it is

Misawa Homes was first incorporated in 1967; the present company dates from 2003. Its group lists 7,894 consolidated employees and a head office in the Shinjuku NS Building, Tokyo. Its history notes a capital tie-up with Toyota Home and its later conversion into a wholly owned subsidiary of Prime Life Technologies. [2]
Prime Life Technologies was set up by Panasonic and Toyota in equal shares and was scheduled to start on January 7, 2020. Its housing companies Panasonic Homes, Toyota Homes and Misawa Homes have 14 production sites and 85 logistics sites between them. [3][1]
Techno F&C runs the Numata plant in Gunma, which it calls Misawa's main production plant. It makes wood housing components for Misawa to order, one house at a time, from about 150,000 structural part variations, and can ship in as little as three days. It is also moving into large panels for conventional post-and-beam construction. [4][5]

## Key facts

- Founded: 1967; present company 2003 [2]
- Headquarters: Shinjuku, Tokyo [2]
- Factory: Numata, Konan, Bizen and Kurate [1]
- Employees: 7,894 consolidated, per a group listing [2]
- Ownership: Wholly owned by Prime Life Technologies [2]

## Production and technology

- Production: Large central factory, Four plants; Numata is the main plant [1]
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Panels
- Materials: No data
- Products: Panels, Components
- Building markets: Single-family
- Factory: Numata, Japan; Konan, Japan; Bizen, Japan; Kurate, Japan
- Markets served: Japan
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Factories

- Numata, Gunma, Japan: Run by Techno F&C, which calls it Misawa's main plant [1][4][5]
- Konan, Aichi, Japan: Nagoya plant [1]
- Bizen, Okayama, Japan: Okayama plant [1]
- Kurate, Fukuoka, Japan: Fukuoka plant; also assembles roof panels for group firms [1]

## Serves

- Japan (JP) [6]

## Timeline

- 1967-10 (founded): The original Misawa Homes company was incorporated. [2]
- 2003-08 (milestone): The present Misawa Homes company was established. [2]
- 2013-11-29 (milestone): The land ministry reported 1,619 Misawa prefab homes suspected of missing gypsum or plywood wall bracing, mostly in Okayama, and ordered a fix and a cause review. [6]
- 2020-01 (acquisition): Toyota and Panasonic set up Prime Life Technologies in equal shares to hold their housing companies, including Misawa Homes. [3][2]
- 2025-07 (milestone): Its parent reported shared trucking among Misawa, Toyota Homes and Panasonic Homes plants, cutting 26 t of transport CO2 a year. [1]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No factory waste, recycled content or disassembly figure was found in the sources read.

- Gap: Plant waste and recycling rates and timber sourcing.

### Energy and Carbon: Specifics published (level 2)

Its parent reports shared trucking among the three group house makers that cut transport emissions by 26 t CO2 a year by fiscal 2024. No home energy rating or embodied carbon figure was found.

- Evidence: Group logistics changes cut 26 t CO2 a year by the end of fiscal 2024. [1]
- Gap: Energy ratings of homes sold and embodied carbon per home.

### Cost and Access: No public evidence (level 0)

No price per home and no affordable housing count was found in the sources read.

- Gap: Published prices.

### Workforce: Specifics published (level 2)

The Numata plant operator lists 433 employees, 387 men and 46 women, and holds ISO 9001 and ISO 14001. The group lists 7,894 consolidated employees. No safety data was found.

- Evidence: 433 employees at Techno F&C, Numata, with ISO 9001 and ISO 14001. [4]
- Gap: Plant safety records and headcount at the other three plants.

### Delivery Record: Specifics published (level 2)

A 2013 land ministry notice records 1,619 Misawa prefab homes suspected of missing wall bracing, 1,063 of them in Okayama; five sampled homes were found structurally safe. Total homes built were not found in the sources read.

- Evidence: Ministry notice of November 29, 2013 on 1,619 homes with suspected bracing defects. [6]
- Gap: Cumulative and annual homes delivered, and the outcome of the 2013 remediation.

## Sources

1. [新たなPLT輸送連合の取り組みで物流効率化、CO2排出量削減を実現 (July 24, 2025)](https://homes.panasonic.com/company/news/release/2025/pdf/0724.pdf) (Prime Life Technologies)
2. [ミサワホームグループ 会社概要](https://job.mynavi.jp/28/pc/search/corp1479/outline.html) (Mynavi)
3. [Panasonic and Toyota confirm location and executive structure of joint venture (December 4, 2019)](https://global.toyota/en/newsroom/corporate/30919382.html) (Toyota Motor Corporation)
4. [テクノエフアンドシー株式会社沼田工場 企業PR情報シート](https://jsite.mhlw.go.jp/gunma-roudoukyoku/content/contents/002657782.pdf) (Gunma Labour Bureau, Ministry of Health, Labour and Welfare)
5. [テクノエフアンドシー](https://techno-fc.misawa.co.jp/) (Techno F&C)
6. [ミサワホーム(株)が建設したプレハブ住宅における施工不備について (November 29, 2013)](https://www.mlit.go.jp/common/001020567.pdf) (Ministry of Land, Infrastructure, Transport and Tourism)
