Where it standsIts site is live with a Santa Monica address and a booking link, but shows no dated activity; the latest coverage found is from February 2023.[1][4]
mnmMOD is a wall, floor and roof panel system of steel and expanded polystyrene foam developed by Santa Monica architecture studio Minarc. Press in 2020 confirmed a first house in Venice, California and relayed maker figures of 30 percent recycled content and 40 percent better energy performance; the site names six projects. No prices, test data, steel gauge, production volume or current factory are public, and no dated activity after February 2023 was found.
Verify first. Confirm the panels are in production today, and ask for code approvals and tested thermal and fire data.
What it is
mnmMOD is a factory-made building panel system from Minarc, a Santa Monica architecture studio. The company names Tryggvi Thorsteinsson and Erla Dogg Ingjaldsdottir as its inventors and chief executives, and as principals of Minarc.[2]
The Santa Monica Daily Press described the panels in 2020 as steel and expanded polystyrene foam, screwed together on site in place of wood framing. It reported that the first panels were made at a small factory at Santa Monica Airport and the first house was built in Venice.[3]
The company's portfolio page names six projects, including the Superba Residence, without completion dates. The pages read give no prices or production figures.[5]
At a glance
Status
Active
Role
Designer and manufacturer
Method
Panels
Product
Panels
Builds
Single-family
Headquarters
Santa Monica, California, United States
Production and technology
How the company organizes production, and the production technology a source documents.
Five AI specialists each read the sourced facts on this page for one question. A level measures the public evidence; the company itself is unrated. How the AI Research Team works.
Materials and Circularity
Where do the offcuts go, and can this building be taken apart and used again?
Specifics published
The Santa Monica Daily Press reported in October 2020 that the steel and foam panels contain 30 percent recycled content and are 98 percent recyclable; Global Design News reported 30 percent recycled steel and almost no site waste. The figures originate with the maker. No product declaration or certificate was found.
Evidence
The Santa Monica Daily Press reported 30 percent recycled content and 98 percent recyclability.[3]
Global Design News reported 30 percent recycled steel and almost no waste on site.[4]
Gap
A product declaration or certificate, and evidence of panels being reused or recycled.
Energy and Carbon
What is the measured energy use or embodied carbon, and who checked it?
Specifics published
The Santa Monica Daily Press reported in October 2020 a claim that the panels are 40 percent more energy efficient than a traditionally built home. No test data, thermal value or verifier is named, and no embodied carbon figure for steel and foam is published.
Evidence
The Santa Monica Daily Press reported that the panels are 40 percent more energy efficient than a traditionally built home.[3]
Gap
Tested thermal values, measured building energy use and embodied carbon of steel and foam.
Cost and Access
What does a finished home cost, and who has moved in?
Claims only
The only cost statement found is an October 2020 press report that the panels cost about the same as traditional wood framing. No panel price, finished building cost or buyer profile is published as of November 2026.
Evidence
The Santa Monica Daily Press reported that the panels cost about the same as traditional wood framing.[3]
Gap
Panel prices, finished building costs and who the homes were built for.
Workforce
How many people work there, and what happened to them when plans changed?
No public evidence
No public source gives a headcount or says where and by whom the panels are made as of November 2026. The 2020 press report mentions a small factory at Santa Monica Airport for the first panels only.
Gap
Where the panels are made now, by how many people, and under what conditions.
Delivery Record
How many buildings exist today, and is the company still here?
Specifics published
The Santa Monica Daily Press confirmed in October 2020 a first house built with the panels in Venice, and the portfolio page names six projects without dates. A 2022 Good Design Award is reported. No total is published and no dated activity after February 2023 was found.
Evidence
The Santa Monica Daily Press reported the first house built with the panels, in Venice.[3]
The portfolio page names six projects, without completion dates.[5]
Global Design News reported a 2022 Good Design Award for mnmMOD.[4]
Gap
A dated project list, production volume and evidence of work after 2023.
Timeline
1999.Founded The founders started the architecture studio Minarc in Santa Monica, according to the Santa Monica Daily Press. The same article gives 1999 as the year mnmMOD was launched; no other source for that date was found.[3]
October 2020.Milestone The Santa Monica Daily Press profiled the panel system and its first house, on Superba Avenue in Venice.[3]
2022.Milestone mnmMOD received a 2022 Good Design Award, according to Global Design News, which also described Minarc as a 2022 International Architecture Awards honorable mention.[4]