# The Mod Squad Team

Designs, launches and ramps up offsite housing factories for modular developers, manufacturers and investors.

- **Operating status:** Active. Its site was live in November 2026, listing five factory projects for US clients. [1][3]
- **Momentum:** Unknown
- **Ownership:** Unknown
- **Headquarters:** Headquarters not confirmed
- **Role:** Offsite advisor
- **Method:** Volumetric modules
- **Builds:** Affordable housing, Workforce housing
- **Website:** https://themodsquadteam.com/ (loaded when checked)

Checked 2026-11-23. Page: https://nowcitylabs.com/fieldguide/construction/p/mod-squad-team/

## Summary by the Lead Analyst

The Mod Squad Team is a factory planning consultancy for offsite housing: layout, production systems, DfMA, feasibility, commissioning and ramp-up. It names factory work for Fading West in Colorado, AVA Modular in Minnesota, BoulderMOD in Colorado and Full Stack Modular West in California, and reports more than 22 factories launched and 1,550 jobs enabled. These figures are company-reported; no headquarters, founding year or third-party confirmation was found.

Verify first: Factory counts and job figures are its own; ask a named factory client which phases the team led.

## What it is

The Mod Squad Team advises modular developers, manufacturers and investors on designing, launching and scaling offsite factories. Its services cover factory layout, workflow and production line design, DfMA and material strategy, market and feasibility studies, site selection, line commissioning, operator training, labor modeling and standard operating procedures. [1]
Its project page, which is company-stated, names factory layout and ramp-up support for Fading West in Colorado in 2022, factory design and workforce development for BoulderMOD with the City of Boulder and Flatirons Habitat for Humanity in 2025, a multi-line production system for Full Stack Modular West in Carson, California in 2025, a greenfield factory for AVA Modular in Minnesota with a training area for about 150 employees, and a Florida factory design. [3]
Its team page names Jason Carter for factory platform leadership, Jaime Millan for Canadian factory development, Roger Lankford for financial strategy and Clairson Dutra for structural engineering, and says it works across North America. [2]

## Key facts

- Practice areas: Factory design, feasibility, commissioning, ramp-up [1]
- Notable engagements: Fading West, BoulderMOD, Full Stack Modular West [3]
- Factories launched: More than 22 (company claim) [1]
- Leadership: Jason Carter, factory platform leadership [2]
- Serves: US and Canada [2]

## Production and technology

- Production: No data
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: No data
- Products: No data
- Building markets: Affordable housing, Workforce housing
- Factory: N/A, advisory firm
- Markets served: United States, Canada, Colorado, California, Minnesota, Florida
- Demonstrated scale: No data
- Annual capacity: Not published
- Cost: No data
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Serves

- United States (US) [2][3]
- Canada (CA) [2]
- Colorado (US-CO) [3]
- California (US-CA) [3]
- Minnesota (US-MN) [3]
- Florida (US-FL) [3]

## Timeline

- 2022 (milestone): Supported factory layout, sequencing, labor planning and commissioning at Fading West in Colorado, per its project page. [3]
- 2025 (milestone): Listed factory work for BoulderMOD in Boulder and Full Stack Modular West in Carson, California. [3]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

The site lists material strategy as a service but gives no waste or yield figure for any factory it designed.

- Gap: Material yield or waste at a named factory it set up.

### Energy and Carbon: No public evidence (level 0)

No energy or carbon figure for the factories it designed or their homes was found in the sources read.

- Gap: Energy or carbon data from a named factory or its output.

### Cost and Access: Claims only (level 1)

The project page says the Fading West factory delivers workforce and affordable housing and names Flatirons Habitat for Humanity as a BoulderMOD partner, without home counts or prices.

- Evidence: Describes the Fading West facility as delivering workforce and affordable housing. [3]
- Gap: Homes delivered from factories it set up and their cost.

### Workforce: Specifics published (level 2)

The company reports more than 1,550 manufacturing jobs enabled and a training area for about 150 employees at AVA Modular. No third party has confirmed these figures.

- Evidence: Reports more than 1,550 manufacturing jobs enabled. [1]
- Evidence: Designed an on-site training area for about 150 employees at AVA Modular. [3]
- Gap: Employment at named factories confirmed by the factory or public records.

### Delivery Record: Specifics published (level 2)

The site names five factory projects, dated 2022, 2025 and 2028 where a year is given, and reports more than 22 factories launched. These are company statements; no third-party source, headquarters or founding year was found.

- Evidence: Names factory work for Fading West, AVA Modular, BoulderMOD and Full Stack Modular West. [3]
- Evidence: Reports more than 22 factories launched. [1]
- Gap: A factory client or named press confirming its role, and its location and founding date.

## Sources

1. [The Mod Squad Team](https://themodsquadteam.com/) (The Mod Squad Team)
2. [About](https://themodsquadteam.com/about) (The Mod Squad Team)
3. [Projects](https://themodsquadteam.com/projects) (The Mod Squad Team)
