# MOD

Makes software and runs a service that checks a developer's design for prefab potential and matches elements to suppliers.

- **Operating status:** Active. Its Zurich and Munich site was live in November 2026, after the company went through Suffolk Technologies' BOOST 6 accelerator in 2025. [1][4]
- **Momentum:** Expanding
- **Ownership:** Independent
- **Headquarters:** Zurich, Switzerland
- **Role:** Software
- **Method:** Other
- **Builds:** Commercial, Hospitality
- **Website:** https://www.mod.construction/ (loaded when checked)

Checked 2026-11-21. Page: https://nowcitylabs.com/fieldguide/construction/p/mod/

## Summary by the Lead Analyst

MOD, run by MOD AG in Zurich and MOD GmbH in Munich, sells real estate developers a check of schematic designs for prefab potential and a sourcing service that compares elements such as walls, slabs, stairs and bathroom pods with suppliers' products and capacity. It went through Suffolk Technologies' BOOST 6 accelerator in 2025, whose participants receive $100,000. No projects, customers or delivered buildings are named in the sources read.

Verify first: Ask for named projects where its supplier matches were built, and the cost and schedule results.

## What it is

MOD describes itself as prefab intelligence for real estate developers and their architects. Its Prefab Check tool, which it says is free and works with Revit, analyzes schematic designs for elements that could be prefabricated, such as walls, stairwells, bathroom pods and floor slabs, and compares them with the products and capacity of manufacturers near the site. It says it has access to more than 20,000 suppliers of prefabricated elements. [1]
It works with elements rather than whole modules, except bathroom pods, and says it is not a modular building system. Developers pay a fixed fee for a service run by its architects and engineers from schematic design to building permit, and selected suppliers pay a success fee when the optional procurement service is used. It lists retail, hospitality, residential and office projects of $20 million to $1 billion. [1]
The company is registered as MOD AG in Zurich, Switzerland, and MOD GmbH in Munich, Germany. Suffolk Technologies selected it for its sixth BOOST accelerator cohort in 2025 and lists it in its portfolio. [2][3][4][5]

## Key facts

- Headquarters: Zurich, Switzerland; office in Munich [1][2]
- Supplier database: 20,000+ prefab suppliers (company) [1]
- Project size: $20 million to $1 billion (company) [1]
- Funding raised: $100,000 BOOST 6 accelerator SAFE, 2025 [4]
- Ownership: Venture-backed; Suffolk Technologies portfolio [3][4]

## Production and technology

- Production: No data
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: No data
- Materials: No data
- Products: No data
- Building markets: Commercial, Hospitality
- Factory: N/A, software company
- Markets served: No data
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: No data
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Thin · Checked Nov 2026

## Timeline

- 2025 (funding): Joined Suffolk Technologies' BOOST 6 accelerator. A Suffolk spokesperson said each participant receives $100,000 on a post-money SAFE for 3 percent equity. [4]
- 2025-11 (milestone): Presented at the BOOST 6 Demo Day as a platform that assesses designs for prefabrication and coordinates supply chain options. [4][5]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No figure on material use or waste from projects using its element matching was found.

- Gap: Material or waste data from a project where its recommended elements were used.

### Energy and Carbon: Claims only (level 1)

The company says each option is evaluated for CO2 impact alongside cost and schedule, but publishes no carbon figure for any project.

- Evidence: The FAQ says options are evaluated on manufacturability, cost, scheduling and CO2 impact. [1]
- Gap: Carbon results for a named project and who checked them.

### Cost and Access: Claims only (level 1)

The company describes a free design check, a fixed developer fee and a supplier success fee, but publishes no fee amounts and no cost results for homes or buildings.

- Evidence: The FAQ describes a free Prefab Check, a fixed developer fee and a supplier success fee. [1]
- Gap: Fee levels and measured cost savings on a delivered building.

### Workforce: No public evidence (level 0)

No headcount, training or labor effect on projects was found in the sources read.

- Gap: Team size and any labor or schedule data from projects.

### Delivery Record: Claims only (level 1)

Trade press confirms MOD took part in Suffolk Technologies' 2025 BOOST 6 cohort. No project, customer or building that used its matching is named, and its 20,000-supplier figure is its own.

- Evidence: Construction Dive lists MOD of Switzerland in the 2025 BOOST cohort. [4]
- Gap: Named projects, customers and buildings delivered with its recommendations.

## Sources

1. [MOD: Prefab intelligence for real-estate developers](https://www.mod.construction/) (MOD)
2. [Imprint](https://www.mod.construction/imprint) (MOD)
3. [Portfolio](https://www.suffolktech.com/portfolio) (Suffolk Technologies)
4. [Suffolk touts its 2025 contech startup picks](https://www.constructiondive.com/news/suffolk-boost-2025-contech-startup-demo-day/806991/) (Construction Dive)
5. [Suffolk Technologies Holds 6th Annual BOOST Demo Day](https://www.high-profile.com/suffolk-technologies-holds-6th-annual-boost-demo-day/) (High-Profile)
