# Modscape

Melbourne maker of timber modular homes, apartments and commercial buildings on robotic panel lines.

- **Operating status:** Active. In 2026 it confirmed a planned Yatala, Queensland plant and a 15,000 sq m expansion of its Essendon Fields factory, both due mid-2027; its founders own the business. [3][4][5]
- **Momentum:** Expanding
- **Ownership:** Independent
- **Headquarters:** Essendon Fields, Victoria, Australia
- **Role:** Manufacturer, Designer, Builder
- **Method:** Volumetric modules, Panels
- **Material:** Light wood frame
- **Product:** Whole homes, Room modules, Panels
- **Builds:** Single-family, Multifamily, Commercial, Senior housing, Hospitality, Affordable housing
- **Website:** https://modscape.com.au/ (loaded when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/modscape/

## Summary by the Lead Analyst

A founder-owned Melbourne modular builder that reports more than 600 projects. It moved from Brooklyn to a 20,000 sq m robotic factory at Essendon Fields, built for up to 2,000 modules a year, and in 2026 announced a 55,000 sq m expansion and a Yatala, Queensland plant, both due mid-2027. It reports 97 percent of 2025 factory waste recycled. Output, prices and carbon data are not published or verified.

Verify first: Actual module output at Essendon Fields against the 2,000-a-year design figure before the two 2027 expansions start.

## What it is

Modscape designs and makes modular homes and commercial buildings off site and installs them. Its work covers bespoke homes, multi-residential and mid-rise apartments, accommodation, education, health and aged care, hotels and social and affordable housing. It offers timber volumetric buildings up to five floors and timber and steel hybrids up to eight. [1]
Co-founders Jan Gyrn, its chief executive, and Stefan Seketa own the business. Its robotics arm, Modbotics, has run Randek robotic lines for wall panels and floor and roof cassettes since 2019. [3]
In 2023 it announced a move from a 24,500 sq m Brooklyn site to a 20,000 sq m factory at Essendon Fields built for up to 2,000 modules a year. In 2026 it confirmed a Yatala plant in Queensland and an expansion at Essendon Fields with a second robot cell and a moving module line. [2][4][5]

## Key facts

- Headquarters: Essendon Fields, Victoria [1]
- Factory: Essendon Fields, 20,000 sq m; Archerfield, QLD [1][4]
- Homes delivered: More than 600 projects, per the company [1]
- Employees: 150+, per the company [1]
- Ownership: Owned by its co-founders [3]
- Serves: Australia and the Pacific [1]

## Production and technology

- Production: Large central factory, Factories in Victoria and Queensland serving Australia and the Pacific [1]
- Technology: Robotics, Randek robotic lines for walls and floor and roof cassettes since 2019 [3]
- Technology: Automated production, Conveyor module handling line planned with a second robot cell [5]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules, Panels
- Materials: Light wood frame
- Products: Whole homes, Room modules, Panels
- Building markets: Single-family, Multifamily, Commercial, Senior housing, Hospitality, Affordable housing
- Factory: Essendon Fields, Australia; Archerfield, Australia; Brooklyn, Australia; Yatala, Australia
- Markets served: Australia
- Demonstrated scale: 600 projects delivered, 2026
- Annual capacity: 2,000 modules a year, reported 2023
- Cost: No data
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Units delivered: 600 projects delivered, 2026 (company-reported, more than 600 projects across Australia and the Pacific) [1]
- Capacity per year: 2,000 modules/yr capacity, reported 2023 (company-stated design capacity for Essendon Fields, up to 2,000 a year) [2]
- Plant capital: 35,000,000 AUD to build one plant, 2023 (reported combined construction cost of the Essendon Fields buildings, excl. land) [3]
- Factory floor area: 215,278 sq ft factory floor area [4]

## Factories

- Essendon Fields, Victoria, Australia: 215,278 sq ft, 20,000 sq m; expansion to 55,000 sq m due mid-2027 [4]
- Archerfield, Queensland, Australia: Listed by the company as office and factory [1]
- Brooklyn, Victoria, Australia: 263,716 sq ft, Former plant, 24,500 sq m; move to Essendon Fields set for 2024 [2]
- Yatala, Queensland, Australia: Planned 50,000 sq m site; operations expected mid-2027 [4]

## Serves

- Australia (AU) [1]

## Timeline

- 2019-02 (milestone): Began working with Swedish maker Randek on robotic wall panel lines, later run by its Modbotics arm. [3]
- 2023-06 (factory): Announced a move to a 20,000 sq m factory at Essendon Fields on a 15-year lease, to replace its Brooklyn plant and triple output to up to 2,000 modules a year. [2][3]
- 2026-02 (factory): Confirmed a planned plant of about 50,000 sq m at Yatala, Queensland, with works from July 2026 and operations expected mid-2027. [4]
- 2026-06 (factory): Announced a 15,000 sq m expansion at Essendon Fields to 55,000 sq m, with a second Randek robot cell and a conveyor module line, due mid-2027. [5]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Specifics published (level 2)

The company states that 97 percent of its manufacturing waste was recycled in 2025. No tonnage, method or third-party audit is published.

- Evidence: The home page states 97 percent of manufacturing waste was recycled in 2025. [1]
- Gap: Waste tonnage, where it goes and an independent check of the 97 percent figure.

### Energy and Carbon: Claims only (level 1)

The company presents its timber buildings as lower impact. Its robotic lines make passive house walls, per 2023 press, but no energy rating, certified building or carbon figure was found.

- Evidence: 2023 press reports the robotic lines make passive house walls. [3]
- Gap: Certified energy ratings of delivered buildings and embodied carbon per module.

### Cost and Access: Claims only (level 1)

It lists social and affordable housing as a sector and quotes bespoke homes for projects over A$2 million. No affordable homes delivered or per-home price for multi-unit work was found.

- Evidence: The home page lists social and affordable housing and states a A$2 million threshold for bespoke homes. [1]
- Gap: Counts of social or affordable homes delivered and their cost.

### Workforce: Claims only (level 1)

The company states more than 150 employees. No safety, training or factory headcount figures were found.

- Evidence: The home page states 150+ employees. [1]
- Gap: Factory headcount, injury rates and training data.

### Delivery Record: Third-party evidence (level 3)

The company reports more than 600 projects. Trade press in 2023 and 2026 reports the Essendon Fields factory, its robotic lines and the Queensland plan, so the expansion is on record; delivered volumes are company figures only.

- Evidence: Trade press reports 600 projects over 19 years and the Yatala plan. [4]
- Evidence: Trade press reports the 2026 Essendon Fields expansion. [5]
- Gap: Modules produced per year and a list of completed multi-unit buildings.

## Sources

1. [Modscape + Modbotics home page](https://modscape.com.au/) (Modscape)
2. [Modscape announces move to Essendon Fields](https://modscape.com.au/modscape-announces-move-to-essendon-fields/) (Modscape)
3. [Melbourne modular builder puts their shoulder to wheel of offsite construction history](https://builtoffsite.com.au/news/melbourne-modular-builder-puts-their-shoulder-to-wheel-of-offsite-construction-history-to-construct-the-largest-advanced-prefabricated-manufacturing-facility-in-the-southern-hemisphere/) (Built Offsite)
4. [Modscape + Modbotics confirms Yatala manufacturing facility](https://builtoffsite.com.au/news/modscape-modbotics-confirms-yatala-manufacturing-facility/) (Built Offsite)
5. [Modscape + Modbotics expand Essendon Fields factory and double automated output](https://builtoffsite.com.au/news/modscape-modbotics-expand-automated-manufacturing-capacity-as-demand-for-industrialised-construction-grows/) (Built Offsite)