# Modulous

Made TESSA housing design software and a kit of parts for modular apartments, built by partner suppliers, not its own plant.

- **Operating status:** Closed in 2024. Modulous Limited entered creditors' voluntary liquidation in March 2024 and was dissolved in August 2025, per the UK register; its website was still online in November 2026. [1][3][4]
- **Momentum:** Unknown
- **Ownership:** Independent
- **Headquarters:** London, England, United Kingdom
- **Founded:** 2018
- **Role:** Software, Proptech, Designer
- **Method:** Volumetric modules, Kit of parts
- **Builds:** Multifamily
- **Website:** https://www.modulous.com/ (loaded when checked)

Checked 2026-11-27. Page: https://nowcitylabs.com/fieldguide/construction/p/modulous/

## Summary by the Lead Analyst

Modulous, a London company founded in 2018, paired TESSA design and cost software with a kit of parts that partner suppliers made into modules for apartments. It raised a 10 million pound Series A in 2022, made its staff redundant in November 2023 and entered liquidation in early 2024 owing about 6.2 million pounds. Press reported its only kit project, a 12-home Bristol pilot, half built at the collapse. The UK register shows the company dissolved in August 2025.

Verify first: The website is still online after the company was dissolved; anyone citing TESSA or the kit should confirm who, if anyone, now holds them.

## What it is

Modulous Limited was incorporated in London in August 2018. Its chief executive was Chris Bone. It offered TESSA, software that generated multifamily housing schemes for a site with floor plans, area schedules, cost plans and embodied carbon figures, and a Kit of Parts, a standard set of assemblies made by supply chain partners so that no dedicated factory was needed. Modules were to be assembled near the site and set with a standard crane. [1][2][3]
It raised a 10 million pound Series A in September 2022 and listed a second office in Seattle. Its only kit client at the collapse was Bristol City Council, for a 12-home pilot on Romney Avenue that was half built in January 2024, with modules made and waiting. [1][2][5][7]
All staff were made redundant at the end of November 2023. A planned administration was not filed, a sale of TESSA fell through, and liquidators wrote to staff in late January 2024. The UK register records a creditors' voluntary liquidation from 21 March 2024 and dissolution in August 2025. [4][5][6]

## Key facts

- Founded: 2018, London [3]
- Headquarters: London, England [1][2]
- Funding raised: 10 million pound Series A (2022) [2]
- Employees: 52, all made redundant November 2023 [5]
- Ownership: Venture-backed [2]

## Production, technology and cost

- Production: No data
- Technology: No data
- Cuts cost through: Schedule, Company claimed a 50 percent time saving on project delivery [2]
- Cuts cost through: Waste, Company claimed a 70 percent cut in construction waste [2]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules, Kit of parts
- Materials: No data
- Products: No data
- Building markets: Multifamily
- Factory: N/A, design firm
- Markets served: United Kingdom
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: No data
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Serves

- United Kingdom (GB) [5]

## Timeline

- 2018-08-17 (founded): Modulous Limited was incorporated, per the UK companies register. [3]
- 2022-09-12 (funding): Raised a 10 million pound Series A to build out its software and kit of parts. [2]
- 2023-11 (layoffs): All 52 staff were made redundant at the end of November, according to Building. [5]
- 2024-01 (closure): A planned administration was not filed and a sale of the TESSA software fell through; liquidators Opus Restructuring wrote to staff on 26 January. [6]
- 2024-03-21 (bankruptcy): The UK register records a creditors' voluntary liquidation beginning on this date. Building reported debts of 6.2 million pounds. [4][7]
- 2025-08-20 (milestone): Modulous Limited was dissolved, per the UK companies register. [3]

## What public reporting says happened

- Former chief executive Chris Bone said the company had 30 million pounds pledged, but one funder pulled out and the rest was delayed, so it ran out of cash before the money arrived. [5][6]
- Bone said venture funders expect fast growth while UK construction and planning move slowly, and that delays finding a site hurt the Bristol project. [5]
- Building reported a 9.5 million pound loss on turnover of 91,000 pounds, with Bristol City Council its only client at the collapse. [7]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4.

### Materials and Circularity: Claims only (level 1)

In 2022 the company claimed a 70 percent cut in construction waste for its system. No measured waste figure from a built project was published before it closed.

- Evidence: Tech.eu reported company claims of 70 percent less construction waste. [2]
- Gap: Measured waste from any completed Modulous project.

### Energy and Carbon: Claims only (level 1)

The company claimed a 60 percent cut in embodied carbon and said TESSA calculated embodied carbon per scheme. No verified figure for a built project was found.

- Evidence: Tech.eu reported company claims of 60 percent less embodied carbon. [2]
- Evidence: The site says TESSA produced embodied carbon calculations. [1]
- Gap: Embodied carbon measured and checked on a completed building.

### Cost and Access: Claims only (level 1)

Its one kit client was Bristol City Council, for a 12-home pilot that was half built when the company failed in January 2024. No price per home and no completed homes were reported.

- Evidence: Building reported a 12-home Bristol City Council pilot, half built in January 2024. [5]
- Gap: Whether the Bristol homes were finished, and at what cost.

### Workforce: Third-party evidence (level 3)

Named press reports all 52 staff were made redundant at the end of November 2023; Building later reported 60 employees owed about 1.4 million pounds in total.

- Evidence: Building reported 52 staff made redundant at the end of November 2023. [5]
- Evidence: Building reported 60 employees owed about 1.4 million pounds. [7]
- Gap: Whether staff recovered what they were owed.

### Delivery Record: Third-party evidence (level 3)

The UK register shows incorporation in 2018, liquidation from March 2024 and dissolution in August 2025. It raised 10 million pounds in 2022; press reported its only kit project half built at the collapse and a loss of 9.5 million pounds on turnover of 91,000 pounds.

- Evidence: The register shows a creditors' voluntary liquidation from 21 March 2024. [4]
- Evidence: Building reported a 9.5 million pound loss on 91,000 pounds of turnover. [7]
- Gap: A record of any building completed with the kit.

## Sources

1. [Modulous](https://www.modulous.com/) (Modulous)
2. [London-based construction tech Modulous scores 10 million pounds to build net-zero modular homes](https://tech.eu/2022/09/12/london-based-construction-tech-modulous-scores-ps10-million-to-build-net-zero-modular-homes/) (Tech.eu)
3. [MODULOUS LIMITED, company 11523631](https://find-and-update.company-information.service.gov.uk/company/11523631) (Companies House)
4. [MODULOUS LIMITED insolvency](https://find-and-update.company-information.service.gov.uk/company/11523631/insolvency) (Companies House)
5. [It's been a torrid time: Modulous boss Chris Bone on the offsite housing firm's collapse](https://www.building.co.uk/its-been-a-torrid-time-modulous-boss-chris-bone-on-the-offsite-housing-firms-collapse/5127145.article) (Building)
6. [Modular housing firm Modulous enters liquidation after buyer deal fails to materialise](https://www.bdonline.co.uk/news/modular-housing-firm-modulous-enters-liquidation-after-buyer-deal-fails-to-materialise/5127538.article) (Building Design)
7. [Modulous collapsed owing more than 6m](https://building.co.uk/news/modulous-collapsed-owing-more-than-6m/5128887.article) (Building)