# Prescient

Designed in its own software and made light-gauge steel structural kits for mid-rise apartments, hotels and dorms.

- **Operating status:** Unverified. It closed its North Carolina plant in 2022 and filed to close its Arvada, Colorado plant in 2023; no later source says whether the company still trades, and its old web address now points elsewhere. [4][5]
- **Momentum:** Unknown
- **Ownership:** Unknown
- **Headquarters:** Charlotte, North Carolina, United States
- **Founded:** 2012
- **Role:** Manufacturer, Software
- **Method:** Kit of parts, Panels
- **Material:** Light-gauge steel
- **Product:** Structural kits, Panels
- **Builds:** Multifamily, Hospitality, Student housing, Senior housing
- **Website:** https://www.prescientco.com/ (no working site of its own when checked)

Checked 2026-11-27. Page: https://nowcitylabs.com/fieldguide/construction/p/prescient/

## Summary by the Lead Analyst

Prescient designed buildings in its own software and made light-gauge steel panels and structural kits for mid-rise apartments, hotels, dorms and senior housing. It reported 57 projects by 2021 and raised 190 million dollars led by JE Dunn and Eldridge that year. It closed its North Carolina plant in 2022 and filed to close its Colorado plant in 2023. No source found says whether the company still operates.

Verify first: Confirm the company still exists and who stands behind warranties on buildings it framed.

## What it is

Prescient was founded in Broomfield, Colorado in 2012 and moved its headquarters to North Carolina in 2017, later to Charlotte. It described itself as a software and structural system maker: buildings were designed in its own patented software, and standardized light-gauge steel panels, trusses and columns were shipped as kits for assembly on site. [1][2][4][5][6]
Its first building, the five-story B Street LoHi apartments in Denver, was framed in six weeks in 2013. By May 2021 Construction Dive counted 57 completed projects, including hotels, student and senior housing, barracks and apartments up to 17 stories, such as West Village at UC Davis and Generation Atlanta. In 2020 it held ICC-ES certification for buildings up to 12 stories in seismic zones. [1][2][3]
Eldridge committed 90 million dollars in 2020, and JE Dunn and Eldridge led a 190 million dollar investment and bonding package in 2021 to grow its multifamily work. In 2022 it closed its 135,000 square foot Mebane plant, cutting 83 jobs. In 2023 it laid off 50 people in Arvada and then filed to close that plant, cutting 60 jobs. [2][3][4][5][6]

## Key facts

- Founded: 2012, Broomfield, Colorado [5]
- Headquarters: Charlotte, North Carolina (last reported) [3][4]
- Factory: Mebane, NC (closed 2022); Arvada, CO (closed 2023) [4][5]
- Funding raised: 190 million dollars in 2021, led by JE Dunn and Eldridge [3]
- Homes delivered: 57 projects completed by May 2021 [3]

## Production, technology and cost

- Production: No data
- Technology: No data
- Cuts cost through: Schedule, Company claimed framing about three times faster than average wood frame [1]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Kit of parts, Panels
- Materials: Light-gauge steel
- Products: Structural kits, Panels
- Building markets: Multifamily, Hospitality, Student housing, Senior housing
- Factory: Mebane, NC; Arvada, CO
- Markets served: California, Georgia, Colorado, Texas
- Demonstrated scale: 57 projects delivered, 2021
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Units delivered: 57 projects delivered, 2021 (projects completed since 2012, as reported by Construction Dive) [3]

## Factories

- Mebane, North Carolina, United States: 135,000 sq ft, Opened 2017, closed July 2022 [4]
- Arvada, Colorado, United States: Closure filed with the state in 2023 [5][6]

## Serves

- California (US-CA) [3]
- Georgia (US-GA) [3]
- Colorado (US-CO) [3]
- Texas (US-TX) [3]

## Timeline

- 2012 (founded): Founded in Broomfield, Colorado. [5]
- 2013-08 (milestone): Completed the frame of its first building, the five-story B Street LoHi apartments in Denver, in six weeks. [1]
- 2017 (factory): Opened a 135,000 square foot plant in Mebane, North Carolina and moved its headquarters to North Carolina. [4][5]
- 2020-06 (funding): Eldridge made a 90 million dollar financing commitment. [2]
- 2021-05 (funding): Closed a 190 million dollar strategic investment and bonding support package led by JE Dunn and Eldridge. [3]
- 2022-07 (closure): Closed the Mebane plant, cutting 83 jobs, per a state notice. [4][5]
- 2023-04 (layoffs): Laid off 50 people at its Arvada plant. [6]
- 2023-09 (closure): Filed a state notice to close the Arvada plant permanently, cutting 60 jobs. [5]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4.

### Materials and Circularity: Specifics published (level 2)

In 2021 the company said its components were made from 100 percent recycled steel and could be taken apart, reused or recycled. No third party verified the recycled content, and no factory waste figure was found.

- Evidence: The company said all components are 100 percent recycled steel that can be disassembled and reused. [3]
- Gap: Certified recycled content and any measured factory or site waste.

### Energy and Carbon: No public evidence (level 0)

No energy or embodied carbon figure for its buildings or plants was found.

- Gap: Embodied carbon data for its steel frames compared with wood or concrete.

### Cost and Access: Claims only (level 1)

In 2013 the company claimed it could deliver a structure at a fraction of the cost of wood, steel or concrete, with no figure. No price or rent data for its buildings was found.

- Evidence: The company claimed structures at a fraction of the cost of other systems. [1]
- Gap: Published cost per square foot for its frames against conventional framing.

### Workforce: Third-party evidence (level 3)

State layoff notices reported by local press show 83 jobs cut at Mebane in 2022 and 50 and then 60 cut at Arvada in 2023. Mebane had been expected to hire about 200, and a state grant was canceled with the company citing hiring difficulties.

- Evidence: The Mebane plant closed with 83 job losses; a state jobs grant was canceled over hiring difficulties. [4]
- Evidence: The Arvada closure notice listed 60 jobs, after 50 layoffs earlier in 2023. [5]
- Gap: What happened to the remaining staff and whether any operations continue.

### Delivery Record: Third-party evidence (level 3)

Construction Dive reported 57 completed projects by May 2021, including buildings up to 17 stories. Both known plants closed by 2023, and no later source confirms the company still trades.

- Evidence: 57 projects completed since 2012, per Construction Dive in May 2021. [3]
- Evidence: The Arvada plant closure was filed in 2023 after the Mebane closure in 2022. [5]
- Gap: A public record or notice on whether the company closed, was sold or still operates.

## Sources

1. [First building constructed with Prescient's standardized light-gauge steel structural system](https://www.fmlink.com/first-building-constructed-with-prescients-standardized-light-gauge-steel-structural-system/) (FMLink)
2. [Prescient receives $90M in funding](https://constructiondive.com/news/prescient-receives-90m-in-funding/579574) (Construction Dive)
3. [Prescient announces $190M in funding](https://www.constructiondive.com/news/prescient-announces-190m-in-funding/599420/) (Construction Dive)
4. [Second Mebane co. to close operations this summer](https://alamancenews.com/second-mebane-co-to-close-operations-this-summer/) (The Alamance News)
5. [Real Estate and Construction, September 5, 2023](https://bizwest.com/?p=370741) (BizWest)
6. [Construction tech company Prescient laying off 50 in Arvada](https://bizwest.com/?p=366734) (BizWest)