# Stack Modular

Builds finished structural steel volumetric modules in Shanghai and ships them to hotel and housing sites in Canada and the US.

- **Operating status:** Active. Its site lists three Shanghai plants and offices in Vancouver and Irvine; Bird Construction sold its 50 percent stake in 2025 and no new owner is named. [1][8]
- **Momentum:** Unknown
- **Ownership:** Unknown
- **Headquarters:** Vancouver, British Columbia, Canada
- **Founded:** 2009
- **Role:** Manufacturer
- **Method:** Volumetric modules
- **Material:** Structural steel
- **Product:** Room modules
- **Builds:** Hospitality, Multifamily, Workforce housing, Senior housing, Student housing, Affordable housing
- **Website:** https://stackmodular.com/ (loaded when checked)

Checked 2026-11-26. Page: https://nowcitylabs.com/fieldguide/construction/p/stack-modular/

## Summary by the Lead Analyst

A steel volumetric module maker with plants in Shanghai that ships finished modules across the Pacific. Bird Construction owned half of it from 2017 until mid-2025, when Bird sold the stake citing tariff and geopolitical uncertainty; the buyer is not named. Its documented delivery is the Iqaluit hotel, opened in late 2020 from 62 China-made modules. United States work is claimed on its site without named projects. Prices, waste and verified carbon data are not public.

Verify first: Who owns it after Bird's 2025 sale, which projects it completed in 2024, and whether it has shipped to any named United States site.

## What it is

Stack Modular designs and makes structural steel volumetric modules for hotels, multifamily, senior, student and workforce housing. The company says it was established in 2009 and runs three factory facilities in Shanghai totaling more than 750,000 sq ft, with North American offices in Vancouver and Irvine, California. [1][3]
Modules are finished in China, shipped by sea and trucked to site. For the Aqsarniit hotel in Iqaluit, Nunavut, it built 62 steel modules that sailed from Shanghai through the Panama Canal in just over 50 days, and Bird Construction set them in 10 days. Trade press reports different suite counts for the hotel, 104 in 2019 and 94 in 2021. [3][4]
Bird Construction bought 50 percent of Stack in 2017 and treated it as its steel modular business. In 2023 Bird won the construction management contract for a 14-story modular supportive housing building on East King Edward Avenue in Vancouver, with final design by Stantec and Stack, built to the Passive House standard. Bird sold its stake in the second quarter of 2025, booking a $3.8 million impairment, and said tariffs and geopolitical measures on foreign-made goods imported into Canada and the United States drove the decision. Bird also said Stack had completed a number of projects in 2024, without naming them. [5][8][9]

## Key facts

- Founded: 2009 [1]
- Headquarters: Vancouver; Calgary in a 2019 report [2][3]
- Factory: Three plants in Shanghai, 750,000+ sq ft [1]
- Ownership: Bird Construction held 50 percent, 2017 to 2025 [9][8]
- Employees: About 30 staff and 200 to 300 in production (2019) [3]
- Serves: Canada and the US, per the company [1]

## Production and technology

- Production: Large central factory, Modules built near Shanghai and shipped by sea to North America [3]
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: Structural steel
- Products: Room modules
- Building markets: Hospitality, Multifamily, Workforce housing, Senior housing, Student housing, Affordable housing
- Factory: Shanghai, China
- Markets served: Nunavut, British Columbia, Ontario, Canada, United States
- Demonstrated scale: No data
- Annual capacity: No data
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Strong · Checked Nov 2026

## Measured

- Factory floor area: 750,000 sq ft factory floor area [1]

## Factories

- Shanghai, China: 750,000 sq ft, Three facilities in Shanghai, over 750,000 sq ft in all, per the company [1]

## Serves

- Nunavut (CA-NU) [3]
- British Columbia (CA-BC) [5]
- Ontario (CA-ON) [4]
- Canada (CA) [1]
- United States (US) [1]

## Timeline

- 2009 (founded): Established, per the company. [1]
- 2017-09 (acquisition): Bird Construction bought 50 percent of Stack Modular Structures and its Hong Kong company for an undisclosed price. [9]
- 2019-12 (milestone): Trade press reported 62 steel modules built in China and set in 10 days for a hotel in Iqaluit, Nunavut. [3]
- 2020 (milestone): The Aqsarniit Hotel in Iqaluit opened in late 2020. [4]
- 2021-04 (milestone): The Iqaluit hotel won first place from the Modular Building Institute for a permanent modular hotel over 10,000 sq ft. [4]
- 2023-05 (milestone): Bird won the contract for a 14-story, 109-home modular supportive housing building in Vancouver designed with Stack. [5]
- 2025-06 (milestone): Bird Construction sold its 50 percent stake, citing tariff and geopolitical measures on imported foreign-made goods, and booked a $3.8 million impairment. The buyer was not named. [8]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No public figure on factory waste, recycled steel content or module reuse was found in the sources read.

- Gap: Factory waste data, recycled content of the steel and any design for disassembly.

### Energy and Carbon: Specifics published (level 2)

Bird's 2023 release says the Vancouver tower will follow the Passive House standard, and the companies said the Iqaluit hotel uses about 10 percent less energy than a conventional building. Neither figure has third-party verification on record.

- Evidence: Bird said the King Edward Avenue building will follow the Passive House standard. [5]
- Evidence: The companies said the Iqaluit hotel is about 10 percent more energy efficient than a conventional building. [4]
- Gap: A Passive House certificate, measured energy use and embodied carbon that counts ocean shipping.

### Cost and Access: Specifics published (level 2)

The Vancouver tower is to hold 109 studio homes for BC Housing's permanent supportive housing program, run by two nonprofit housing societies. No price per module, per unit or per sq ft is published.

- Evidence: Bird's release describes 109 studio homes under the Permanent Supportive Housing Initiative, operated by two Vancouver nonprofit housing societies. [5]
- Gap: Module or per-unit prices and landed cost in Canada or the US.

### Workforce: Specifics published (level 2)

A 2019 trade report gave about 30 full-time management and staff in China plus 200 to 300 production workers when modules are in production. No safety, wage or training data was found.

- Evidence: Journal of Commerce reported about 30 staff and 200 to 300 production staff in China in 2019. [3]
- Gap: Current headcount, safety record and working conditions at the Shanghai plants.

### Delivery Record: Third-party evidence (level 3)

Trade press confirms the Iqaluit hotel, built from 62 China-made modules, opened in late 2020. Bird's 2025 filing says Stack completed a number of projects in 2024, unnamed, before Bird sold its stake. United States deliveries are claimed by the company without named projects.

- Evidence: On-Site Magazine reported the Iqaluit hotel opened in late 2020 and won a 2021 award. [4]
- Evidence: Journal of Commerce reported 62 modules shipped from Shanghai for the hotel. [3]
- Evidence: Bird's Q2 2025 report says Stack had a number of projects completed in 2024 and that Bird sold its stake in the quarter. [8]
- Gap: A dated project list with module counts, named United States projects, and the current owner.

## Sources

1. [Stack Modular home page](https://stackmodular.com/) (Stack Modular)
2. [Stack Modular factory profile](https://housinginnovation.co/factory/stack-modular/) (Housing Innovation Collaborative)
3. [Iqaluit Hotel being built using pre-fab Chinese modules](https://canada.constructconnect.com/joc/news/projects/2019/12/iqaluit-hotel-being-built-using-pre-fab-chinese-modules) (Journal of Commerce)
4. [Iqaluit hotel first of many time- and cost-saving projects for Stack Modular, Bird](https://www.on-sitemag.com/construction/iqaluit-hotel-first-of-many-time-and-cost-saving-projects-for-stack-modular-bird/1003972867/) (On-Site Magazine)
5. [Bird awarded Canada's tallest modular build](https://www.newswire.ca/news-releases/bird-awarded-canada-s-tallest-modular-build-813381362.html) (Bird Construction via Newswire)
6. [China shows the potential for high-speed modular construction](https://canada.constructconnect.com/?p=470537) (Daily Commercial News)
7. [How Stack Modular Is Using AI to De-Risk Mid- to High-Rise Modular Construction](https://www.modular.org/2026/02/27/how-stack-modular-is-using-ai-to-de-risk-mid-to-high-rise-modular-construction/) (Modular Building Institute)
8. [Management's Discussion and Analysis, Q2 2025](https://cdn.bird.ca/2025/08/13193105/Bird-Q2-2025-MDA.pdf) (Bird Construction)
9. [Bird Construction Inc. acquires 50% of Stack Modular group of companies](https://newswire.ca/news-releases/bird-construction-inc-acquires-50-of-stack-modular-group-of-companies-644286913.html) (Bird Construction via Newswire)