# Swinerton

Employee-owned California general contractor that builds mass timber offices and civic buildings with its affiliate Timberlab.

- **Operating status:** Active. Employee owned, it built a 192,000 sq ft CLT plant at Millersburg, Oregon that topped out in November 2025 for its mass timber unit Timberlab. [1][4][5]
- **Momentum:** Expanding
- **Ownership:** Independent
- **Headquarters:** Concord, California, United States
- **Founded:** 1888
- **Role:** General contractor
- **Method:** Other
- **Material:** Mass timber
- **Builds:** Commercial
- **Website:** https://swinerton.com/ (loaded when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/swinerton/

## Summary by the Lead Analyst

Swinerton is a 100 percent employee-owned general contractor founded in 1888. It says it began mass timber work in 2016 and, with its affiliate Timberlab, has completed more than 80 mass timber buildings and 6.5 million sq ft since 2017. Named press confirms Timberlab's role on the Portland airport terminal roof and the Millersburg CLT plant Swinerton built for it. Carbon and waste figures for its mass timber work are not published.

Verify first: Project counts are company figures; check which mass timber scope Swinerton built and which Timberlab supplied.

## What it is

Swinerton traces its start to a brick masonry and contracting business founded in 1888. It is 100 percent employee owned, reports more than 4,300 employees and 24 regional offices, and lists offices in California, Oregon and Washington among others. [1][7]
The company says its mass timber work began in 2016 with what was then the largest mass timber office building in the US. Timberlab, a Swinerton Incorporated company formerly called Swinerton Mass Timber, supplies timber manufacturing, fabrication and engineering. Together they report more than 80 completed mass timber buildings, 6.5 million sq ft since 2017 and 1.3 billion dollars completed in five years. [3][2][8]
Named projects include the Portland airport terminal core, Thesis Headquarters in Portland, Hidden Creek Community Center in Hillsboro, Oregon, the Orange County Sanitation District headquarters in Fountain Valley, California, and Live Oak Bank Building 4 in Wilmington, North Carolina. [2]

## Key facts

- Founded: 1888 [1]
- Offices: 24 regional offices, incl. Concord and San Francisco [1][7]
- Ownership: 100 percent employee owned [1]
- Employees: More than 4,300, as the company reports [1]
- Mass timber: 80+ buildings, 6.5M sq ft since 2017 (company) [2]

## Production and technology

- Production: No data
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: No data
- Materials: Mass timber
- Products: No data
- Building markets: Commercial
- Factory: N/A, general contractor
- Markets served: California, Oregon, Washington, North Carolina, Texas
- Demonstrated scale: 80 projects delivered, 2026
- Annual capacity: No data
- Cost: No data
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Strong · Checked Nov 2026

## Measured

- Units delivered: 80 projects delivered, 2026 (company-reported, more than 80 mass timber buildings with Timberlab) [2]

## Serves

- California (US-CA) [2][7]
- Oregon (US-OR) [2][7]
- Washington (US-WA) [7]
- North Carolina (US-NC) [2]
- Texas (US-TX) [3]

## Timeline

- 1888 (founded): Founded as a brick masonry and contracting business. [1]
- 2016 (milestone): Began mass timber work on what the company calls the largest mass timber office building in the US at the time. [3]
- 2024-03 (milestone): ENR reported Timberlab was handling the timber scope of the Portland airport terminal roof, about 380,000 sq ft, for Hoffman Skanska. [9]
- 2024-08 (milestone): The Portland airport main terminal opened under its mass timber roof, with Timberlab among four timber fabricators. [10]
- 2025-11-20 (factory): The Millersburg, Oregon CLT plant, built by Swinerton Builders for Timberlab, topped out; planned output is 7 to 9 million sq ft a year. [4][5]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Specifics published (level 2)

Mass timber is its bio-based material. ENR reports that on the Portland airport roof Timberlab sourced wood within 300 miles from 13 family companies or tribal nations. No factory or site waste figure and no design for disassembly evidence was found.

- Evidence: ENR reported the airport roof wood came from within 300 miles, from 13 family companies or tribal nations. [9]
- Gap: Construction waste diversion and wood certification across its mass timber projects.

### Energy and Carbon: Claims only (level 1)

The company refers to high-performance and net zero buildings without figures. Carbon results reported for the Portland airport belong to the owner and architect, not to Swinerton. No EPD or embodied carbon figure from Swinerton or Timberlab was found.

- Evidence: The mass timber page mentions net zero buildings without figures. [3]
- Gap: Embodied carbon figures or EPDs for its mass timber buildings and the Millersburg CLT.

### Cost and Access: Specifics published (level 2)

The company states mass timber rates 4 percent cheaper than structural steel and builds four months faster than the industry average. No affordable housing project or price per square foot was found.

- Evidence: Swinerton states mass timber rates 4 percent cheaper than structural steel and four months faster than the industry average. [3]
- Gap: Independent cost comparisons and any mass timber housing it has built.

### Workforce: Third-party evidence (level 3)

The company reports more than 4,300 employees and 100 percent employee ownership. Construction Dive reports the Millersburg plant will employ about 100 people at full capacity with average total pay of 80,000 dollars.

- Evidence: Swinerton reports over 4,300 employees and full employee ownership. [1]
- Evidence: Construction Dive reported about 100 plant jobs at an average of 80,000 dollars in total pay. [5]
- Gap: Safety records and training data for mass timber crews.

### Delivery Record: Third-party evidence (level 3)

In business since 1888. The company reports more than 80 mass timber buildings and 6.5 million sq ft since 2017. ENR and Dezeen confirm Timberlab's role on the Portland airport roof, and Construction Dive confirms the Millersburg plant.

- Evidence: ENR reported Timberlab, Swinerton's mass timber company, worked on the airport roof. [9]
- Evidence: Construction Dive reported the 192,000 sq ft Millersburg plant built by Swinerton Builders. [5]
- Evidence: The company reports 80+ mass timber buildings completed. [2]
- Gap: An independent list of its mass timber buildings and which Swinerton built. Company counts differ: more than 70 projects in a November 2025 release, more than 80 buildings on its current page.

## Sources

1. [About Us](https://swinerton.com/about-us/) (Swinerton)
2. [Swinerton x Timberlab: Better Together](https://swinerton.com/markets/mass-timber/better-together/) (Swinerton)
3. [Mass Timber](https://swinerton.com/markets/mass-timber/) (Swinerton)
4. [Strengthening America's Mass Timber Supply Chain: Landmark Cross-Laminated Timber Facility Tops Out](https://swinerton.com/strengthening-americas-mass-timber-supply-chain-landmark-cross-laminated-timber-facility-tops-out/) (Swinerton)
5. [Swinerton, Timberlab top out mass timber factory](https://www.constructiondive.com/news/swinerton-timberlab-mass-timber-manufacturing-oregon/806959/) (Construction Dive)
6. [Swinerton](https://en.wikipedia.org/wiki/Swinerton) (Wikipedia)
7. [Locations](https://swinerton.com/locations/) (Swinerton)
8. [Contractor Unveils New Timberlab Brand](https://swinerton.com/?p=17401) (Swinerton)
9. [Wood Wizardry in Oregon: Innovation Raises the Roof for PDX Terminal](https://enr.com/articles/58352-wood-wizardry-in-oregon-innovation-raises-the-roof-for-pdx-terminal) (ENR)
10. [ZGF Architects places nine-acre mass-timber roof on Portland airport terminal](https://www.dezeen.com/2024/08/15/zgf-mass-timber-roof-portland-airport-terminal/) (Dezeen)
