# TopHat

Made volumetric timber-framed houses in a Derbyshire factory; wound down in 2024 before a planned Corby plant opened.

- **Operating status:** Closed in 2024. Stopped trading in November 2024 after winding down its factory; TopHat Industries Limited went into compulsory liquidation on July 1, 2026. [1][7]
- **Momentum:** Contracting
- **Ownership:** Independent
- **Headquarters:** Foston, Derbyshire, United Kingdom
- **Founded:** 2016
- **Role:** Manufacturer
- **Method:** Volumetric modules
- **Material:** Light wood frame
- **Product:** Whole homes
- **Builds:** Single-family
- **Website:** https://tophat.io/ (no working site of its own when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/tophat/

## Summary by the Lead Analyst

A Goldman Sachs backed maker of volumetric homes with a 125,000 sq ft plant near Derby rated at up to 800 homes a year. It raised 70 million pounds in 2023 from investors including Persimmon and Aviva and took a 15 million pound Homes England loan, then paused a 650,000 sq ft Corby plant in March 2024, wound down the factory from October 2024 and stopped trading that November. No delivered home count was found.

Verify first: How many homes it actually delivered, and who now stands behind warranties on them.

## What it is

TopHat built volumetric modular homes at a 125,000 sq ft factory near Derby with a stated capacity of up to 800 homes a year. In 2020 BoKlok UK appointed it to make timber framed two and three bedroom houses under a five year contract. [2][3][10]
In 2022 it announced a 650,000 sq ft factory at Magna Park, Corby, planned for up to 4,000 homes a year and 1,000 jobs. The plan was paused in March 2024. [1][2][3]
In October 2024 it began winding down its modular operations, completing existing orders and making most factory staff redundant. Inside Housing reported it stopped trading in November 2024, with losses of about 85 million pounds across five group companies in the year to October 2023. [1][2]

## Key facts

- Founded: Trading since 2016 [4]
- Headquarters: Dove Valley Park, Foston, Derbyshire [6][9]
- Factory: 125,000 sq ft, up to 800 homes a year [2][3]
- Employees: 212 at the factory business, October 2022 [2]
- Funding raised: 70 million pound round in 2023 [4]
- Ownership: Backed by Goldman Sachs [2][4]

## Production and technology

- Production: Large central factory, One 125,000 sq ft plant near Derby; Corby plant planned, then paused [1][2][3]
- Technology: No data

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: Light wood frame
- Products: Whole homes
- Building markets: Single-family
- Factory: Foston, United Kingdom
- Markets served: United Kingdom
- Demonstrated scale: Not published
- Annual capacity: 800 homes a year, reported 2023
- Cost: Not published
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Capacity per year: 800 homes/yr capacity, reported 2023 (company-reported, up to 800 homes a year at the Derby plant) [4][5]
- Factory floor area: 125,000 sq ft factory floor area [2]

## Factories

- Foston, Derbyshire, United Kingdom: 125,000 sq ft, Dove Valley Park; up to 800 homes a year; wound down from October 2024 [2][9]

## Serves

- United Kingdom (GB) [10]

## Timeline

- 2016 (founded): Began trading. [4]
- 2019 (funding): Goldman Sachs made an initial 75 million pound investment. [2]
- 2020-07 (milestone): BoKlok UK appointed it to make timber framed two and three bedroom houses under a five year contract. [10]
- 2022-06 (factory): Announced a 650,000 sq ft factory at Magna Park, Corby, for up to 4,000 homes a year. [3]
- 2023-04 (funding): Raised 70 million pounds from new and existing shareholders including Persimmon, Aviva and Goldman Sachs. [4]
- 2023-11 (funding): Agreed a 15 million pound debt facility with Homes England to speed up production. [5]
- 2024-03 (factory): Paused plans to open the Corby factory. [1][2]
- 2024-10 (layoffs): Began winding down modular operations; most factory staff made redundant and existing orders to be completed. [2][9]
- 2024-11 (closure): Stopped trading. [1]
- 2026-07-01 (bankruptcy): TopHat Industries Limited entered compulsory liquidation on a petition dated May 20, 2026; the Official Receiver was appointed. [7]
- 2026-10-20 (closure): TopHat Communities Limited was dissolved. [8]

## What public reporting says happened

- Inside Housing reports the company could not secure new large scale contracts, had no pipeline of commercially viable work and struggled to raise more funding. [1]
- Accounts cited by Inside Housing point to a sluggish modular market, the energy crisis, higher interest rates, rising material costs and weak demand in 2023. [1]
- The company itself cited a continued reduction in its pipeline and a challenging market over several years. [2]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No factory waste, material reuse or disassembly evidence was found in the sources read.

- Gap: Factory waste figures and timber sourcing.

### Energy and Carbon: Claims only (level 1)

2023 press coverage of the Homes England loan said the planned Corby factory would make ultra low carbon homes. No energy rating, embodied carbon figure or verifier was found.

- Evidence: Coverage of the Homes England loan said the Corby factory would make up to 4,000 ultra low carbon homes a year. [5]
- Gap: EPC ratings and embodied carbon per home, with a verifier.

### Cost and Access: No public evidence (level 0)

No price per home and no count of affordable homes delivered were found in the sources read.

- Gap: Prices and who moved into the homes.

### Workforce: Third-party evidence (level 3)

Named press reports 212 people at the factory business in accounts to October 2022, and that most factory staff were made redundant from October 2024 during the wind down.

- Evidence: 212 staff per accounts to October 2022; most factory staff made redundant. [2]
- Gap: Final headcount and what support redundant staff received.

### Delivery Record: Third-party evidence (level 3)

Raised at least 75 million pounds from Goldman Sachs in 2019 and 70 million pounds in 2023, plus a 15 million pound Homes England loan. It stopped trading in November 2024; group losses were about 85 million pounds in the year to October 2023. No delivered home count was found.

- Evidence: Stopped trading November 2024; about 85 million pounds of losses across five companies. [1]
- Evidence: Compulsory liquidation of TopHat Industries Limited from July 1, 2026. [7]
- Gap: Total homes delivered and where they are.

## Sources

1. [TopHat losses laid bare as modular builder stops trading](https://www.insidehousing.co.uk/news/tophat-losses-laid-bare-as-modular-builder-stops-trading-90183) (Inside Housing)
2. [TopHat to wind down modular operations](https://insidehousing.co.uk/news/tophat-to-wind-down-modular-operations-88969) (Inside Housing)
3. [Modular specialist TopHat to open vast housing factory](https://www.constructionenquirer.com/2022/06/20/modular-specialist-tophat-to-open-vast-housing-factory) (Construction Enquirer)
4. [Persimmon invests in modular house builder TopHat](https://www.constructionenquirer.com/2023/04/25/persimmon-invests-in-modular-house-builder-top-hat/) (Construction Enquirer)
5. [TopHat agrees 15m loan with Homes England](http://www.constructionenquirer.com/?p=481134) (Construction Enquirer)
6. [TOPHAT INDUSTRIES LIMITED, company 10136060](https://find-and-update.company-information.service.gov.uk/company/10136060) (Companies House)
7. [TOPHAT INDUSTRIES LIMITED, insolvency](https://find-and-update.company-information.service.gov.uk/company/10136060/insolvency) (Companies House)
8. [TOPHAT COMMUNITIES LIMITED, company 10302373](https://find-and-update.company-information.service.gov.uk/company/10302373) (Companies House)
9. [Jobs to go as modular housebuilder set to wind down Derbyshire factory](https://www.thebusinessdesk.com/eastmidlands/news/2091158-jobs-to-go-as-modular-housebuilder-set-to-wind-down-derbyshire-factory) (TheBusinessDesk.com)
10. [BoKlok UK appoints TopHat](https://www.pbctoday.co.uk/news/modular-construction-news/boklok-uk-appoints-tophat/79819/) (PBC Today)