# Volumetric Building Companies

Makes wood-framed volumetric modules for apartments, hotels and student housing at plants in California, Pennsylvania and Poland.

- **Operating status:** Active. Its site is live and lists factories in Tracy, California, Berwick, Pennsylvania and Chojnice, Poland, with 6,500 units manufactured. The latest independent report found on the Tracy plant is from June 2023. [1][5]
- **Momentum:** Unknown
- **Ownership:** Unknown
- **Headquarters:** Philadelphia, Pennsylvania, United States
- **Role:** Manufacturer, Builder, Designer
- **Method:** Volumetric modules
- **Material:** Light wood frame
- **Product:** Room modules, Components
- **Builds:** Multifamily, Affordable housing, Hospitality, Student housing, Emergency shelter, Commercial
- **Website:** https://www.vbc.co/ (loaded when checked)

Checked 2026-11-20. Page: https://nowcitylabs.com/fieldguide/construction/p/volumetric-building-companies/

## Summary by the Lead Analyst

VBC is a Philadelphia modular company that bought Katerra's Tracy, California assets, including the lease on a 577,000 square foot plant, out of bankruptcy in 2021 and began making modules there in December 2022. Trade press in 2023 described a line able to make 10 modules a shift. Its site claims 6,500 units manufactured and lists plants in Tracy, Berwick and Poland. No report on Tracy after June 2023, no headcount, and no ownership or financial information was found.

Verify first: Whether the Tracy plant is producing today; the last independent report found is from June 2023.

## What it is

Volumetric Building Companies designs, makes and installs volumetric modules for apartments, affordable housing, hotels, student housing, healthcare and refugee housing. Its site lists factories in Tracy, California, Berwick, Pennsylvania and Chojnice, Poland, and offices in Philadelphia, Boston, Monaghan in Ireland and Gdansk. [1]
In August 2021 it completed the purchase of Katerra's Tracy assets, including the lease on a 577,000 square foot factory; the price was reported at $25 million. It began with windows, cabinets and countertops, made training modules in September 2022 and began turning out its first modules that December for a Bay Area building. [2][3][5]
Offsite Builder described the Tracy module line in 2023 as timber stud framed, with a 28-station assembly line, capacity of about 10 modules a shift or 21,000 square feet a week, and a cabinet line making about 1,500 units a week. [5]

## Key facts

- Headquarters: Philadelphia, Pennsylvania [2]
- Factory: Tracy 577,000 sq ft; Berwick; Chojnice, Poland [1][2]
- Homes delivered: 6,500 units manufactured, the company says [1]
- Employees: About 50 in California in late 2021 [4]
- Serves: United States, Europe, Middle East and Africa, it says [1]

## Production and technology

- Production: No data
- Technology: Automated production, Two automated lines at Tracy, including a Randek AutoWall machine [5]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: Volumetric modules
- Materials: Light wood frame
- Products: Room modules, Components
- Building markets: Multifamily, Affordable housing, Hospitality, Student housing, Emergency shelter, Commercial
- Factory: Tracy, CA; Berwick, PA; Chojnice, Poland; Hamlet, NC
- Markets served: California, Pennsylvania, District of Columbia, New York, United Kingdom
- Demonstrated scale: 6,500 homes delivered, 2026
- Annual capacity: Not published
- Cost: No data
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Measured

- Units delivered: 6,500 homes delivered, 2026 (company site, as read 2026-11: units manufactured, all building types) [1]

## Factories

- Tracy, California, United States: 577,000 sq ft, Lease bought from the Katerra estate in 2021; first modules December 2022 [2][5]
- Berwick, Pennsylvania, United States [1]
- Chojnice, Poland [1]
- Hamlet, North Carolina, United States: Named as a VBC factory in 2021 press; not on the company site in 2026 [3]

## Serves

- California (US-CA) [5]
- Pennsylvania (US-PA) [1]
- District of Columbia (US-DC) [1]
- New York (US-NY) [1]
- United Kingdom (GB) [1]

## Timeline

- 2021-08-17 (acquisition): Completed the purchase of Katerra's Tracy, California assets after bankruptcy court approval. Trade press reported the price at $25 million. [2][3]
- 2021-09 (factory): Planned to begin making windows, cabinets and countertops at Tracy, with 150 jobs rehired or created by the end of 2022. [2]
- 2022-01-02 (milestone): Chief executive Vaughan Buckley told Pro Builder the Tracy plant had about 50 employees and had built its first few hundred kitchens. [4]
- 2022-12 (factory): Began producing its first modules at Tracy, for a multistory Bay Area project. [5]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No public figure or statement on factory waste, material sourcing, reuse or disassembly was found.

- Gap: Factory waste figures at Tracy and Berwick, lumber sourcing, and any design for disassembly.

### Energy and Carbon: No public evidence (level 0)

No energy standard, measured energy use or embodied carbon figure was found on the company site or in the trade press read.

- Gap: Energy performance of delivered buildings and embodied carbon per module.

### Cost and Access: Claims only (level 1)

The company lists affordable housing and refugee housing among its product lines. The projects it features are market-rate apartments, student housing and hotels, and no cost figure was found.

- Evidence: The company site lists affordable housing and refugee housing product lines and features market-rate, student and hotel projects. [1]
- Gap: Named affordable projects with unit counts and costs.

### Workforce: Specifics published (level 2)

A 2021 company release anticipated 150 jobs at Tracy by the end of 2022, and its chief executive reported about 50 employees there in late 2021. No later headcount, wage or safety data was found.

- Evidence: The August 2021 release anticipated 150 jobs rehired or created by the end of 2022. [2]
- Evidence: Pro Builder reported about 50 California employees in late November 2021. [4]
- Gap: Current headcount at each plant, wages and safety record.

### Delivery Record: Third-party evidence (level 3)

Named trade press confirms the 2021 purchase of the Tracy plant and first modules in December 2022. The 6,500 unit total and the featured projects in Philadelphia, Washington, Brooklyn and London are the company's own listing.

- Evidence: PR Newswire and HousingWire reported the Tracy purchase in August 2021. [2][3]
- Evidence: Offsite Builder reported first modules from Tracy in December 2022. [5]
- Evidence: The company site claims 6,500 units manufactured. [1]
- Gap: Output by plant and year, founding date and ownership, and the status of the Tracy and Hamlet plants.

## Sources

1. [VBC home page](https://www.vbc.co/) (Volumetric Building Companies)
2. [Volumetric Building Companies Completes Purchase of Katerra's Tracy, CA Assets Signaling Expansion to West Coast](https://www.prnewswire.com/news-releases/volumetric-building-companies-completes-purchase-of-katerras-tracy-ca-assets-signaling-expansion-to-west-coast-301356945.html) (Volumetric Building Companies, via PR Newswire)
3. [Tracy Reboot: VBC Breathes Life Into Plant Out Of Katerra's Ashes](https://www.housingwire.com/articles/tracys-2nd-chance-breathing-life-out-of-katerras-ashes/) (HousingWire)
4. [Vaughan Buckley on Restarting a Former Katerra Factory](https://www.probuilder.com/interview-buckley) (Pro Builder)
5. [Katerra Plant Gets a New Life](https://offsitebuilder.com/katerra-plant-gets-a-new-life/) (Offsite Builder)
