# WinSun (Yingchuang)

Prints concrete building elements on large printers in China and assembles them into houses, apartments and offices.

- **Operating status:** Unverified. The latest source read, a December 2019 report on a COBOD white paper, covers past projects only; no source from 2020 on confirms current operations. [7]
- **Momentum:** Unknown
- **Ownership:** Unknown
- **Headquarters:** Shanghai, China
- **Role:** Manufacturer, Builder
- **Method:** 3D printed
- **Material:** Concrete
- **Product:** Panels, Components
- **Builds:** Single-family, Multifamily, Commercial
- **Website:** http://www.winsun3d.com/ (loaded when checked)

Checked 2026-11-25. Page: https://nowcitylabs.com/fieldguide/construction/p/winsun/

## Summary by the Lead Analyst

A Chinese firm that prints concrete wall and frame elements in a factory and assembles them on site. Press in 2014 to 2016 covered ten printed houses, a five-story apartment block and villa in Suzhou, and components for the 2016 Dubai Office of the Future. Its claims were disputed: Contour Crafting's inventor alleged copying in 2015, and COBOD said in 2019 its buildings were assembled from precast printed parts. No source after 2019 was found.

Verify first: Whether the company still prints and delivers buildings; its site sits behind a verification page and no recent project was found.

## What it is

WinSun, reported as WinSun Decoration Design Engineering and based in Shanghai, prints concrete building sections horizontally on a large printer and lifts them into place. In 2014 its chief executive Ma Yihe said the printer was assembled from imported parts in a Suzhou factory, and the company claimed ten 200 square meter houses printed in under 24 hours at under $5,000 each. [3]
In January 2015 it showed a five-story apartment block and a 1,100 square meter villa at Suzhou Industrial Park, printed from a mix of glass fiber, steel, cement, hardening agents and recycled construction waste, with sections assembled like precast parts. ArchDaily reported orders from Tomson Group and the Egyptian government, as stated at the launch. [2]
Its components formed the Dubai Future Foundation's Office of the Future, opened in 2016, designed by Gensler with Thornton Tomasetti. ENR reported the parts were printed in 17 days at WinSun's facility near Shanghai and the office cost about $140,000. In 2019 COBOD wrote that the office was assembled from precast elements printed in Suzhou and finished by hand in Dubai. [4]

## Key facts

- Headquarters: Shanghai (as reported 2014 to 2016) [3][5]
- Factory: Suzhou, Jiangsu [3][7]
- Price range: Under $5,000 a house claimed in 2014 [3]
- Serves: China; Dubai office in 2016 [2][4]

## Production and technology

- Production: Large central factory, Elements printed in Suzhou and shipped, per COBOD [7]
- Technology: Automated production, Concrete printer about 132 feet long [1]

## Card fields

The same twelve fields every card, table row and comparison shows. A missing value says why: No data, Not published, N/A or Not yet rated.

- Method: 3D printed
- Materials: Concrete
- Products: Panels, Components
- Building markets: Single-family, Multifamily, Commercial
- Factory: Suzhou, China
- Markets served: China, United Arab Emirates
- Demonstrated scale: Not published
- Annual capacity: No data
- Cost: No data
- Green: Not yet rated
- Value: Not yet rated
- Evidence: Partial · Checked Nov 2026

## Factories

- Suzhou, Jiangsu, China: Printer assembled here in 2014; Dubai elements printed here, per COBOD [3][7]

## Serves

- China (CN) [2]
- United Arab Emirates (AE) [4]

## Timeline

- 2014-04 (milestone): Claimed ten printed houses of 200 square meters each produced in under 24 hours. [3]
- 2015-01 (milestone): Showed a five-story apartment block and a 1,100 square meter villa at Suzhou Industrial Park. [2]
- 2015-04 (milestone): Contour Crafting inventor Berok Khoshnevis alleged, via 3DPrint.com, that WinSun copied his work and overstated its buildings; WinSun did not respond. [6]
- 2016-06 (milestone): The Dubai Office of the Future opened, built from components printed in 17 days at its China facility. [4]
- 2016-12 (milestone): Partnered with developer Jiayuan International Group to print landscape products, then buildings once national standards were set. [5]
- 2019-12 (milestone): A COBOD white paper said its buildings were assembled from elements printed earlier in a factory. [7]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Claims only (level 1)

Press in 2015 relayed the company's claim that its printing mix uses ground construction waste and recycled industrial waste. No share by weight, test or third-party check was found.

- Evidence: PBS NewsHour reported the material was made from construction and industrial waste in January 2015. [1]
- Gap: Recycled content by weight and test results for the printed mix.

### Energy and Carbon: No public evidence (level 0)

No energy standard, emissions or embodied carbon figure was found for its printed buildings.

- Gap: Cement content and embodied carbon per square meter.

### Cost and Access: Specifics published (level 2)

Reported prices span a claimed under $5,000 per house in 2014, a $160,000 villa in 2015 and about $140,000 for the Dubai office, the last from the client. No occupied homes were documented.

- Evidence: Core77 reported a cost under $5,000 per house in April 2014. [3]
- Evidence: ENR reported the Dubai Future Foundation put the office cost at about $140,000. [4]
- Gap: Evidence that anyone lives in a WinSun-printed home and what it cost them.

### Workforce: Claims only (level 1)

The Dubai Future Foundation reported 70 percent labor savings on the 2016 office. No headcount, factory jobs or safety data was found.

- Evidence: ENR relays a reported 70 percent saving on labor costs for the Dubai office. [4]
- Gap: Number of workers and conditions at the Suzhou plant.

### Delivery Record: Third-party evidence (level 3)

Named press confirms demonstration buildings in Suzhou in 2015 and the Dubai office in 2016. The extent of printing was disputed in 2015 and 2019, and no project after 2016 or source after 2019 was found.

- Evidence: ENR names Gensler and Thornton Tomasetti on the Dubai office built from WinSun components. [4]
- Evidence: COBOD said in 2019 the Dubai office was precast elements printed in Suzhou. [7]
- Gap: Any building completed since 2016 and whether the company still trades.

## Sources

1. [World's first 3-D printed apartment building debuts in China](https://www.pbs.org/newshour/world/worlds-first-3-d-printed-apartment-building-debuts-china) (PBS NewsHour)
2. [Chinese Company Constructs the World's Tallest 3D Printed Building](https://www.archdaily.com/591331/chinese-company-constructs-the-worlds-tallest-3d-printed-building) (ArchDaily)
3. [China on the Forefront of 3D-Printed Housing](https://www.core77.com/posts/26858/china-on-the-forefront-of-3d-printed-housing-26858) (Core77)
4. [Office Built Out of 3D-Printed Components Opens in Dubai](https://www.enr.com/articles/39692-office-built-out-of-3d-printed-components-opens-in-dubai) (ENR)
5. [Jiayuan International Group Partners with WinSun to 3D Print Landscaping Projects](https://3dprint.com/157904/jiayuan-international-winsun/) (3DPrint.com)
6. [How Winsun Stole IP from Contour Crafting and Is Faking Their 3D Printed Homes](https://3dprint.com/57764/winsun-3d-print-fake/) (3DPrint.com)
7. [The Truth in 3D Printed Construction: Nobody 3D Printed an Entire Building](https://3dprint.com/261045/truth-in-3d-printed-construction-nobody-3d-printed-an-entire-building/) (3DPrint.com)
