# Ameresco

Designs, builds, owns and runs efficiency, solar, battery, microgrid and renewable gas projects in North America and Europe.

- **Operating status:** Active. Its results for the quarter ended September 30, 2026 report 827 MWe of operating energy assets and a record $7.2 billion backlog; its 2025 10-K says shares held by founder George P. Sakellaris and certain family members carry about 74.5 percent of the combined voting power. [1][2]
- **Momentum:** Expanding
- **Ownership:** Independent
- **Headquarters:** Framingham, Massachusetts, United States
- **Founded:** 2000
- **Role:** Developer, Energy and water system operator, General contractor
- **Solution:** Solar and storage, Microgrids, Building decarbonization, District energy, Resilience
- **Field Guides:** Green Infrastructure
- **Website:** https://www.ameresco.com/ (loaded when checked)

Checked 2026-11-23. Page: https://nowcitylabs.com/fieldguide/green-infrastructure/p/ameresco/

## Summary by the Lead Analyst

Ameresco designs, builds and operates efficiency, solar, storage, microgrid and renewable gas projects, mostly for public bodies, and SEC filings report 827 MWe of operating assets at September 2026 and a $7.2 billion backlog. It reports 18 million metric tons of CO2e avoided in 2025, self-reported. Its 537.5 MW SCE battery contract ran past its 2022 target, with up to $89 million in damages at risk. The founder and family hold about 74.5 percent of votes.

Verify first: Ask how the SCE battery delays were resolved and whether its avoided emissions figures have third-party assurance.

## What it is

Ameresco, based in Framingham, Massachusetts, was founded in 2000 and listed on the New York Stock Exchange in 2010. It designs, builds, finances and operates energy projects: efficiency and HVAC upgrades, solar, battery storage, microgrids, combined heat and power, and landfill gas and renewable natural gas plants. Its 10-K says about 61 percent of 2025 revenue came from federal, state, provincial or local governments. [2][3][4]
At the end of 2025 the 10-K reports 227 small-scale renewable plants it owns and operates, about 838 MWe, plus about 853 MWe in development or construction. Its results for the quarter ended September 30, 2026 report 827 MWe of operating energy assets on the release's own definition, 500 MWe in development and a total project backlog of $7.2 billion. [1][2]
Signature work includes a $91 million energy security project at Marine Corps Recruit Depot Parris Island, completed in 2019, and a 2021 contract to build 537.5 MW of battery storage for Southern California Edison. Those battery projects ran past their August 2022 target, and the 10-K reports up to $89 million in liquidated damages at risk. [2][5][6]

## Key facts

- Founded: 2000; listed on the NYSE in 2010 [3][4]
- Headquarters: Framingham, Massachusetts [2]
- Employees: 1,601 at December 31, 2025 [2]
- Ownership: Public; founder and family hold about 74.5% of votes [2]
- Operating assets: 827 MWe at September 30, 2026 [1]
- Serves: North America and Europe [2]

## Card fields

The same 8 fields every Green Infrastructure card, table row and comparison shows. A missing value says why: No data or Not published.

- Solution: Solar and storage, Microgrids, Building decarbonization, District energy, Resilience
- Deployment: 827 MW installed, 2026, 227 projects, 2025, 18,000,000 t CO2e avoided a year, 2025
- Signature project: Marine Corps Recruit Depot Parris Island energy security project, Parris Island, SC, 2019 (Designed, built and operates under a 22-year ESPC); Southern California Edison distribution battery storage, Rancho Cucamonga, Long Beach and San Joaquin Valley sites, CA (Turnkey EPCM contractor for three battery systems); Savannah River Site cogeneration facility, Savannah River Site, SC (Subsidiary contracted to build and operate it)
- Markets served: United States, Canada, United Kingdom, Greece, Romania
- Status: Active · Expanding
- Certifications: No data
- Evidence: Strong
- Checked: Nov 2026

## Solution

- Solar and storage, Solar and battery storage, including 537.5 MW of batteries for SCE [2][5][6]
- Microgrids, Microgrid controls with island mode at a Marine Corps base [2][6]
- Building decarbonization, Efficiency, HVAC, building envelope, LED lighting and controls [2]
- District energy, Central plants and cogeneration supplying power, heat or cooling [2][6]
- Resilience, Energy security projects for military bases and the SCE grid [5][6]

## Signature projects

- Marine Corps Recruit Depot Parris Island energy security project, Parris Island, SC, 2019 (Designed, built and operates under a 22-year ESPC): A $91 million project with 5.5 MW of solar, a 4 MW, 8 MWh battery, a 3.5 MW combined heat and power plant and microgrid controls that can run the base in island mode. [6]
- Southern California Edison distribution battery storage, Rancho Cucamonga, Long Beach and San Joaquin Valley sites, CA (Turnkey EPCM contractor for three battery systems): Three four-hour battery systems totaling 537.5 MW and 2,150 MWh at SCE substation parcels, contracted in 2021 for August 2022; the 10-K reports two of three substantially complete. [2][5]
- Savannah River Site cogeneration facility, Savannah River Site, SC (Subsidiary contracted to build and operate it): A cogeneration facility at the U.S. Department of Energy Savannah River Site that a subsidiary is contracted to build and operate, per the 10-K; the filing gives no capacity or date here. [2]

## Deployment

- Installed capacity: 827 MW installed, 2026 (Q3 2026 earnings release: total operating energy assets, MWe) [1]
- Projects: 227 projects, 2025 (10-K: small-scale renewable plants owned and operated, year end) [2]
- CO2e avoided: 18,000,000 t CO2e avoided a year, 2025 (Company impact report: about 18 million, owned assets and customer projects; verified by self-reported) [3]

## Serves

- United States (US) [2]
- Canada (CA) [2]
- United Kingdom (GB) [2]
- Greece (GR) [2]
- Romania (RO) [2]

## Timeline

- 2000 (founded): Founded; the company marked 25 years of operation in its 2025 impact report. [3]
- 2010 (milestone): Completed its initial public offering. [4]
- 2019-06 (milestone): Completed the $91 million energy security project at Marine Corps Recruit Depot Parris Island, with solar, a battery and a CHP plant. [6]
- 2021-10 (milestone): Signed a turnkey contract with Southern California Edison for three battery systems totaling 537.5 MW and 2,150 MWh, targeted for August 2022. [5]
- 2026 (milestone): Its 2025 10-K reports agreement with SCE on substantial completion of two of the three battery projects, with up to $89 million in liquidated damages at risk. [2]
- 2026-09 (milestone): Reported a record total project backlog of $7.2 billion and 827 MWe of operating energy assets for the third quarter. [1]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Claims only (level 1)

The 2025 10-K lists landfill gas to energy, biogas and renewable natural gas among its generation lines. No figure for gas captured, construction waste or equipment reuse was found.

- Evidence: The 10-K lists biogas, landfill gas to energy and renewable natural gas plants among its services. [2]
- Gap: Volumes of landfill gas captured and waste or reuse figures for its construction and retrofit work.

### Energy and Carbon: Specifics published (level 2)

The company reports about 18 million metric tons of CO2e avoided in 2025 and more than 140 million cumulative, from owned assets and customer projects, and 827 MWe of operating assets at September 2026. No third-party assurance of the carbon figures was found.

- Evidence: The April 2026 impact report release gives about 18 million metric tons of CO2e avoided in 2025. [3]
- Evidence: The Q3 2026 release reports 827 MWe of operating energy assets. [1]
- Gap: Third-party assurance of the avoided emissions figures and the method behind them.

### Cost and Access: Specifics published (level 2)

The Parris Island project cost $91 million with no upfront capital from the base, financed through an energy savings performance contract, and was reported to save $6.9 million a year. About 61 percent of 2025 revenue came from public bodies.

- Evidence: The 2019 release reports a $91 million ESPC project with $6.9 million in annual savings. [6]
- Evidence: The 10-K reports about 61 percent of revenue from government entities. [2]
- Gap: Independent measurement of savings delivered under its performance contracts.

### Workforce: Specifics published (level 2)

The 10-K reports 1,601 employees at December 31, 2025, across 45 US states and DC, eight Canadian provinces and sites in the UK, Italy and Greece. No safety rate or training figure was found.

- Evidence: The 10-K gives 1,601 employees at year end 2025. [2]
- Gap: Recordable injury rates, craft training figures and subcontractor safety data.

### Delivery Record: Third-party evidence (level 3)

SEC filings report 227 owned and operated renewable plants at about 838 MWe at end of 2025 and 827 MWe of operating assets at September 2026, after listing in 2010. The 10-K also records delays on the SCE battery contract signed in 2021.

- Evidence: The 10-K reports 227 plants and about 838 MWe owned and operated. [2]
- Evidence: The Q3 2026 release, filed with the SEC, reports 827 MWe and a $7.2 billion backlog. [1]
- Gap: A project-by-project list of operating assets with commissioning dates.

## Sources

1. [Ameresco Reports Third Quarter 2026 Financial Results (Form 8-K, Exhibit 99.1)](https://www.sec.gov/Archives/edgar/data/0001488139/000162828026072159/amrc_20260930x8-kxexx991.htm) (U.S. Securities and Exchange Commission)
2. [Ameresco, Inc. Form 10-K for the fiscal year ended December 31, 2025](https://www.sec.gov/Archives/edgar/data/1488139/000162828026013574/amrc_20251231x10-k.htm) (U.S. Securities and Exchange Commission)
3. [Ameresco Releases 2025 Impact Report, Highlighting Progress Across People, Planet, and Policy](https://ir.ameresco.com/news-events/press-releases/detail/752/ameresco-releases-2025-impact-report-highlighting-progress) (Ameresco)
4. [Impact](https://www.ameresco.com/impact/) (Ameresco)
5. [Ameresco Announces an EPCM Contract for Large Distribution Battery Energy Storage Systems for a Total of 537.5 MW / 2.15 GWh](https://www.ameresco.com/ameresco-announces-an-epcm-contract-for-large-distribution-battery-energy-storage-systems-for-a-total-of-537-5-mw-2-15-gwh/) (Ameresco)
6. [Ameresco Completes 10 Megawatt Distributed Energy Security Project at Marine Corps Recruit Depot Parris Island](https://ir.ameresco.com/news-events/press-releases/detail/351/ameresco-completes-10-megawatt-distributed-energy-security) (Ameresco)