Bedrock Energy was founded in Austin, Texas, in 2022. It designs geothermal loop fields, drills the boreholes and delivers whole projects for developers, owners and builders of industrial, office, hospitality and multifamily buildings. It drills deeper bores than typical geothermal wells, 800 to 1,000 feet in cooling-led markets and 1,000 to 1,200 feet or more in heating-led ones, to fit fields on smaller sites.[1][3][5][7]
Its first project, completed in April 2024, put a 35-ton system on 11 bores at Building D of the Penn Field campus in Austin, owned by a real estate trust operated by CIM Group. TechCrunch reported a second 2024 installation at a resort in Utah. In 2025 it began drilling for the town of Hayden, Colorado, where Canary Media reports a 2 MW thermal network of about 150 bores for a business park, with about half due in 2026 and the rest by 2028.[4][5][6][7]
It raised an $8.5 million seed round in October 2023, a $12 million Series A led by Titanium Ventures in January 2025 and $24 million led by Clean Energy Ventures and Clearvision Ventures in November 2026. ThinkGeoEnergy reported projects across five states and plans for new states in 2027.[2][3][4]