# Ecocem

Makes low-carbon cement from steel slag at plants in Ireland, France and the Netherlands; based in Dublin.

- **Operating status:** Active. The Irish Times reported in March 2025 four plants with 2.4 million metric tons of yearly capacity, 230 staff and investors including Saint-Gobain and Breakthrough Energy Ventures; RTE reported a new French research center and plans for four more lines in October 2025. [1][3]
- **Momentum:** Expanding
- **Ownership:** Independent
- **Headquarters:** Dublin, Ireland
- **Founded:** 2000
- **Role:** Manufacturer, Supplier
- **Solution:** Low-carbon materials, Circular materials
- **Field Guides:** Green Infrastructure
- **Website:** https://www.ecocemglobal.com/ (loaded when checked)

Checked 2026-11-23. Page: https://nowcitylabs.com/fieldguide/green-infrastructure/p/ecocem/

## Summary by the Lead Analyst

Ecocem, founded in Dublin in 2000, makes cement from blast furnace slag at four plants with 2.4 million metric tons of yearly capacity and reported 230 staff in 2025. It reports 18 million metric tons of CO2 avoided to date, with no named verifier. Its new low-clinker ACT cement is in test structures in Dublin and London, and its first ACT production line, at Dunkirk, was described in November 2026 as due to operate the following year.

Verify first: Confirm whether ACT is approved for structural use in your country and whether the Dunkirk line is producing.

## What it is

Ecocem was founded in November 2000 by Donal O'Riain to make cement from ground blast furnace slag, a steelmaking byproduct. It has its head office in Dublin and four plants: Ringsend in Dublin, Fos-sur-Mer and Dunkirk in France, and one in the Netherlands, with a combined capacity of 2.4 million metric tons a year. The Irish Times reported 2023 turnover of 232.4 million euros and 230 employees. [1]
Its newer product, ACT, cuts clinker by about 75 percent and, by company figures, cement emissions by about 70 percent. An EU standard covering it was set in December 2023. A 300,000 metric ton a year ACT line at Dunkirk, co-invested with CB Green, was described in November 2026 as due to operate the following year, and a 2025 partnership licenses the technology to Titan. [1][2][5]
RTE reported in October 2025 that it had opened a research center in France costing over 10 million euros and planned 170 million euros for four new ACT lines in France by 2030. Investors include Saint-Gobain, ArcelorMittal at its French subsidiary, and Breakthrough Energy Ventures. [1][3][4]

## Key facts

- Founded: November 2000, Dublin [1]
- Headquarters: Dublin, Ireland [1]
- Factory: Four plants, 2.4 million metric tons a year capacity [1]
- Employees: 230 in early 2025 [1]
- Ownership: Private; investors include Saint-Gobain and BEV [1]

## Card fields

The same 8 fields every Green Infrastructure card, table row and comparison shows. A missing value says why: No data or Not published.

- Solution: Low-carbon materials, Circular materials
- Deployment: 40 projects, 2026, 18,000,000 t CO2e avoided in total, 2025
- Signature project: Dunkirk ACT plant, Dunkirk, France (Co-investing in the plant with CB Green); Seven Mills scale demonstrator, Dublin, Ireland, 2026 (Supplied ACT cement with a builder-led consortium); Wembley test structure, London, United Kingdom (Supplied ACT cement for a test structure); Aviva Stadium, Dublin, Ireland (Cement supplier, per a trade report); Grand Paris Express, Paris, France (Cement supplier, per a trade report)
- Markets served: Ireland, France, Netherlands, United Kingdom
- Status: Active · Expanding
- Certifications: No data
- Evidence: Strong
- Checked: Nov 2026

## Solution

- Low-carbon materials, Slag cements and the low-clinker ACT cement [1][2]
- Circular materials, Uses blast furnace slag, a steelmaking byproduct [1]

## Signature projects

- Dunkirk ACT plant, Dunkirk, France (Co-investing in the plant with CB Green): A 50 million euro line for its ACT cement at the Dunkirk site, 300,000 metric tons a year, described in November 2026 as due to operate the following year. [1][2]
- Seven Mills scale demonstrator, Dublin, Ireland, 2026 (Supplied ACT cement with a builder-led consortium): A two-story test structure at Cairn Homes' innovation hub, built with Kilsaran and University College Dublin, unveiled in November 2026. [2]
- Wembley test structure, London, United Kingdom (Supplied ACT cement for a test structure): A test structure built with Sisk, Capital Cement and Quintain, with 500,000 euros from Innovate UK. [1]
- Aviva Stadium, Dublin, Ireland (Cement supplier, per a trade report): Listed by Environment+Energy Leader among infrastructure projects using its cement technology. [5]
- Grand Paris Express, Paris, France (Cement supplier, per a trade report): Listed by Environment+Energy Leader among infrastructure projects using its cement technology. [5]

## Deployment

- Projects: 40 projects, 2026 (Irish Times: its low-carbon cement used in more than 40 European projects) [2]
- CO2e avoided: 18,000,000 t CO2e avoided in total, 2025 (company-reported CO2 reductions achieved to date, as reported by RTE; verified by self-reported) [3][5]

## Factories

- Dublin, Ireland: Ringsend plant [1]
- Fos-sur-Mer, Provence-Alpes-Cote d'Azur, France: Opened 2010 [1]
- Dunkirk, Hauts-de-France, France: Slag cement plant; ACT line expected to operate in 2027 [1][2]

## Serves

- Ireland (IE) [1]
- France (FR) [1][3]
- Netherlands (NL) [1]
- United Kingdom (GB) [1]

## Timeline

- 2000-11 (founded): Founded by Donal O'Riain to make cement from blast furnace slag. [1]
- 2010 (factory): Opened its plant at Fos-sur-Mer in southern France. [1]
- 2021-05 (funding): Completed a 22.5 million euro equity investment from Breakthrough Energy Ventures and Breakthrough Energy Ventures-Europe. [4]
- 2023-12 (milestone): The EU set a standard that allows ACT to be sold across the bloc once compliant. [1]
- 2025-01 (factory): Announced a 50 million euro ACT plant at Dunkirk, co-invested with CB Green. [1]
- 2025-04 (milestone): Announced a partnership with TITAN Group to co-develop low-carbon cements, starting in Greece. [5]
- 2025-10 (milestone): Opened a research and innovation center in France and set out 170 million euros for four new ACT lines by 2030. [3]
- 2026-11 (milestone): A two-story ACT demonstrator built with Cairn Homes, Kilsaran and UCD was unveiled in Dublin. [2]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Third-party evidence (level 3)

The Irish Times describes its cement as made from blast furnace slag, a steelmaking byproduct, since 2000, and RTE reports a new center for cements using alternative supplementary materials. No tonnage of slag processed per year was found.

- Evidence: The Irish Times describes cement made from blast furnace slag, a steelmaking waste product. [1]
- Evidence: RTE reports the French research center works on cements that use alternative supplementary cementitious materials in place of clinker. [3]
- Gap: Metric tons of slag and other byproducts used per year.

### Energy and Carbon: Specifics published (level 2)

The company reports 18 million metric tons of CO2 avoided to date and about 70 percent lower emissions for ACT; the Irish Times repeats the 70 percent figure as the company's. No independent verification of either was found.

- Evidence: RTE reports 18 million metric tons of CO2 reductions achieved. [3]
- Evidence: The Irish Times reports a 70 percent emissions cut for ACT, by company figures. [1]
- Gap: Third-party verified EPDs and an audited total of CO2 avoided.

### Cost and Access: Claims only (level 1)

The Dublin consortium says ACT is designed to be cost-competitive with no green premium; no price was published.

- Evidence: The Irish Times reports the consortium's statement that the cement carries no green premium. [2]
- Gap: Published prices compared with conventional cement.

### Workforce: Specifics published (level 2)

The Irish Times reported 230 employees in early 2025, expected to reach 250 by year end, with about 40 in innovation. No training, safety or layoff figure was found.

- Evidence: The Irish Times gives the 2025 headcount. [1]
- Gap: Training and safety records at its plants.

### Delivery Record: Third-party evidence (level 3)

Named press reports 25 years of operation, four plants with 2.4 million metric tons of yearly capacity and 2023 turnover of 232.4 million euros. The Irish Times reported its low-carbon cement in more than 40 European projects in November 2026; the first ACT line was not yet operating.

- Evidence: The Irish Times reports plants, capacity and turnover. [1]
- Evidence: The Irish Times reports the Dunkirk ACT plant expected to operate the following year. [2]
- Gap: Metric tons of cement delivered per year and a list of the buildings that used ACT.

## Sources

1. [There is an urgency here, says the Irish man reinventing cement](https://www.irishtimes.com/business/2025/03/28/there-is-an-urgency-here-says-the-irish-man-reinventing-cement) (The Irish Times)
2. [Ecocem's low-carbon cement offers hope of cutting construction sector emissions](https://www.irishtimes.com/business/2026/11/11/structure-built-with-new-low-carbon-cement-unveiled-at-dublin-event/) (The Irish Times)
3. [Ecocem opens new research and innovation lab in France](https://www.rte.ie/news/business/2025/1001/1536250-ecocem-opens-new-research-and-innovation-lab-in-france) (RTE)
4. [Ecocem announces completion of equity investment by Breakthrough Energy Ventures and Breakthrough Energy Ventures-Europe](https://www.worldcement.com/europe-cis/07052021/ecocem-announces-completion-of-equity-investment-by-breakthrough-energy-ventures-and-breakthrough-energy-ventures-europe) (World Cement)
5. [Ecocem and TITAN Partner to Advance Low-Carbon Cement Solutions](https://environmentenergyleader.com/stories/ecocem-and-titan-partner-to-advance-low-carbon-cement-solutions,72199) (Environment+Energy Leader)