Runs district heating and Deep Lake Water Cooling for about 200 downtown Toronto buildings, plus systems in Ontario and PEI.

- **Operating status:** Active. Owned by IFM Investors and Ontario Teachers' Pension Plan since 2021; it commissioned a Deep Lake Water Cooling expansion in 2024 and a heat pump plant in Toronto in September 2025. [2][5][7][8]
- **Momentum:** Expanding
- **Ownership:** Part of IFM Investors and Ontario Teachers' Pension Plan Board
- **Headquarters:** Toronto, Ontario, Canada
- **Founded:** 1970
- **Role:** Energy and water system operator, Developer
- **Solution:** District energy, Heat pumps
- **Field Guides:** Green Infrastructure
- **Website:** https://www.enwave.com/ (loaded when checked)

Checked 2026-11-23. Page: https://nowcitylabs.com/fieldguide/green-infrastructure/p/enwave-energy/

## Summary by the Lead Analyst

Enwave Energy, based in Toronto, runs about 200 downtown buildings' heating and cooling, including Deep Lake Water Cooling, and systems in London, Windsor, Markham and Charlottetown. Its US assets were sold to different buyers in 2021; this record covers the Canadian company owned by IFM Investors and Ontario Teachers'. It expanded lake cooling in 2024 and opened a heat pump plant in 2025, backed by a C$600 million federal loan. Carbon figures are projections.

Verify first: Measured emissions cuts against the 77,800 t CO2e per year the federal lender projects, and which network a given building would join.

## What it is

Enwave Energy is a Toronto-based owner and operator of community district energy systems. Its Toronto network serves about 200 buildings and more than 40 million square feet downtown through four linked plants and 25 miles of pipe, and it also lists systems in London, Windsor, Markham and Charlottetown. Its Deep Lake Water Cooling system draws cold water from the bottom of Lake Ontario. [1][3][4]
It traces to the Toronto Hospitals Steam Corporation of 1970, became the nonprofit Toronto District Heating Corporation in 1980 and a for-profit company named Enwave in 1999. Brookfield Infrastructure bought it from the City of Toronto and Borealis in 2012. In 2021 Brookfield sold the business in two deals: IFM Investors and OTPP bought the Canadian portion and QIC and Ullico bought the US assets. [5][6]
The Canada Infrastructure Bank committed a $600 million loan to its expansion in Toronto and Mississauga in 2021. In 2024 it commissioned a fourth lake intake, run with Toronto Water, that raised cooling capacity by 60 percent, and in September 2025 it commissioned a heat pump plant that turns waste heat from cooling customers into hot water. [7][8][9]

## Key facts

- Headquarters: Toronto, Ontario [3]
- Founded: 1970, as Toronto Hospitals Steam Corporation [5]
- Ownership: IFM Investors and Ontario Teachers' since 2021 [2][5]
- Buildings served: About 200 in downtown Toronto [4]
- Serves: Toronto, London, Windsor, Markham, Charlottetown [1]

## Card fields

The same 8 fields every Green Infrastructure card, table row and comparison shows. A missing value says why: No data or Not published.

- Solution: District energy, Heat pumps
- Deployment: 200 buildings served, 2026
- Signature project: Deep Lake Water Cooling fourth intake expansion, Toronto, ON, 2024 (Owner, developer and operator); Pearl Street Green Heat plant, Toronto, ON, 2025 (Owner, developer and operator); The Well thermal storage, Toronto, ON (District energy provider)
- Markets served: Ontario, Prince Edward Island
- Status: Active · Expanding
- Certifications: No data
- Evidence: Partial
- Checked: Nov 2026

## Solution

- District energy, Downtown Toronto heating and cooling network with Deep Lake Water Cooling [1][4]
- Heat pumps, Electrified heat pump recovers heat from cooling customers at Pearl Street [8]

## Signature projects

- Deep Lake Water Cooling fourth intake expansion, Toronto, ON, 2024 (Owner, developer and operator): John Street expansion of the system that draws cold water from Lake Ontario, run with Toronto Water; begun in 2021, it raised cooling capacity by 60 percent, room for 40 more buildings. [7]
- Pearl Street Green Heat plant, Toronto, ON, 2025 (Owner, developer and operator): Heat pump plant that upgrades waste heat from cooling customers into hot water, rated at 62,000 MBH of heating and 3,600 tons of cooling, with up to 11,600 tCO2e displaced. [8]
- The Well thermal storage, Toronto, ON (District energy provider): Enwave serves this development of more than 3 million square feet of office and homes and added a thermal battery that makes and stores energy at night at off-peak cost. [4]

## Deployment

- Buildings served: 200 buildings served, 2026 (company-reported buildings on its Toronto network page, undated) [4]

## Serves

- Ontario (CA-ON) [1][9]
- Prince Edward Island (CA-PE) [1][3]

## Timeline

- 1970 (founded): Founded as the Toronto Hospitals Steam Corporation to heat hospitals on University Avenue. [5]
- 1980 (new name): Became the nonprofit Toronto District Heating Corporation. [5]
- 1999 (new name): Restructured as a for-profit company named Enwave, held by the City of Toronto and Borealis Infrastructure. [5]
- 2012 (acquisition): Brookfield Infrastructure bought the City of Toronto's 43 percent and Borealis's 57 percent stakes. [5]
- 2021-06 (acquisition): IFM Investors and Ontario Teachers' Pension Plan bought the Canadian business from Brookfield, each taking 50 percent; the US assets went to QIC and Ullico. [5][6]
- 2021 (funding): The Canada Infrastructure Bank committed a $600 million, 16-year loan for expansion in Toronto and Mississauga. [7][9]
- 2024 (milestone): Commissioned the fourth intake expansion of Deep Lake Water Cooling, adding 60 percent cooling capacity. [7]
- 2025-09 (milestone): Commissioned the Green Heat heat pump plant at Pearl Street in Toronto. [8]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No public evidence was found on materials reuse, construction waste or end of life for its plants and pipes. The heat pump plant reuses waste heat, which the carbon lens covers.

- Gap: Any reporting on construction waste, equipment reuse or decommissioning of retired plant.

### Energy and Carbon: Specifics published (level 2)

The Canada Infrastructure Bank projects a 77,800 t CO2e annual cut from the expansion it funds, and press reports the 2025 heat pump plant can displace up to 11,600 tCO2e. Both are design figures; no measured or verified result was found.

- Evidence: CIB project page lists a 77,800 t CO2e per year reduction. [9]
- Evidence: ReNew Canada reports up to 11,600 tCO2e displaced by the Pearl Street plant. [8]
- Evidence: ReNew Canada reports the lake cooling system avoids over 60 MW of peak grid demand. [7]
- Gap: Measured annual emissions for the Toronto network, verified by a third party.

### Cost and Access: No public evidence (level 0)

No published rates, connection costs or affordable housing served were found.

- Gap: Published heating and cooling rates and connection terms for new buildings.

### Workforce: No public evidence (level 0)

No employee count, training or safety figures were found; the company site names its leadership only.

- Gap: Headcount, safety record and training programs.

### Delivery Record: Third-party evidence (level 3)

The company reports about 200 Toronto buildings and 40 million square feet served. Named press and a federal lender record a 1970 origin, two ownership sales in 2012 and 2021, a C$600 million loan in 2021 and expansions commissioned in 2024 and 2025.

- Evidence: Toronto page lists 200 buildings and four linked plants. [4]
- Evidence: Gowling WLG sets out the history from 1970 to the 2021 sale. [5]
- Evidence: CIB lists its $600 million commitment as under construction. [9]
- Gap: Building counts and capacity for its London, Windsor, Markham and Charlottetown systems.

## Sources

1. [Enwave Energy Corporation](https://www.enwave.com/) (Enwave)
2. [About](https://www.enwave.com/about) (Enwave)
3. [Contact](https://www.enwave.com/contact) (Enwave)
4. [Toronto](https://www.enwave.com/locations/toronto) (Enwave)
5. [Enwave's evolution: a case study in utility transformation](https://gowlingwlg.com/en-ae/insights-resources/articles/2025/enwaves-evolution-a-case-study-in-utility-transformation) (Gowling WLG)
6. [Brookfield sells Enwave Energy for $4.1bn in two transactions](https://infrastructureinvestor.com/brookfield-sells-enwave-energy-for-4-1bn-in-two-transactions) (Infrastructure Investor)
7. [Enwave commissions expansion of Toronto's Deep Lake Water Cooling System](https://www.renewcanada.net/enwave-commissions-expansion-of-torontos-deep-lake-water-cooling-system/) (ReNew Canada)
8. [Enwave commissions Green Heat Plant at Pearl Street](https://www.renewcanada.net/?p=5000105136) (ReNew Canada)
9. [Enwave District Energy](https://cib-bic.ca/en/projects/clean-power/enwave-district-energy/) (Canada Infrastructure Bank)