# Terra CO2

Makes OPUS, a supplementary cementitious material from melted silicate rock that replaces part of the cement in concrete.

- **Operating status:** Active. Closed a $124.5 million Series B in July 2025 and, per World Cement in May 2026, was building a 240,000 ton a year plant in Cleburne, Texas, due to operate in mid-2027. [2][4]
- **Momentum:** Expanding
- **Ownership:** Independent
- **Headquarters:** Golden, Colorado, United States
- **Role:** Manufacturer, Supplier
- **Solution:** Low-carbon materials
- **Field Guides:** Green Infrastructure
- **Website:** https://www.terraco2.com/ (loaded when checked)

Checked 2026-11-26. Page: https://nowcitylabs.com/fieldguide/green-infrastructure/p/terra-co2/

## Summary by the Lead Analyst

Terra CO2, based in Golden, Colorado, melts silicate rock into OPUS, a supplementary cementitious material that it says replaces up to half of portland cement with 70 percent less CO2 per ton displaced; that figure is company-reported. It has raised a $46 million Series A and a Series B that reached $147 million and holds a $52.6 million DOE grant for a Utah plant. Its first commercial plant, in Texas, was due to operate in mid-2027; none ships yet.

Verify first: Check the Cleburne start date and whether OPUS is accepted in your state's concrete specifications before relying on supply.

## What it is

Terra CO2 is based in Golden, Colorado, where it planned a 32,000 square foot headquarters with labs and pilot-scale research in 2026. It melts silicate rocks such as granite and basalt, and mine tailings, into a glassy powder, OPUS SCM, that replaces part of the portland cement in concrete. It is also trialing OPUS ZERO as a full replacement. [1][3][4]
Its first commercial plant, in Cleburne, Texas, is sized at 240,000 tons a year for the Dallas-Fort Worth market and was described in May 2026 as on schedule for mid-2027. A second plant is planned near Salt Lake City with a $52.6 million DOE grant, and it said it was working toward six more sites in North America. [3][4]
Lennar's LenX and Breakthrough Energy Ventures co-led its 2022 Series A. Breakthrough Energy Ventures, Eagle Materials, GenZero and Just Climate co-led a $124.5 million Series B in 2025, with Cemex, Prologis and others joining. ImpactAlpha reported in May 2026 that a $22 million addition from the All Aboard Coalition brought the B round to $147 million. [1][2][5]

## Key facts

- Headquarters: Golden, Colorado [2][4]
- Factory: Cleburne, TX plant under construction [4]
- Funding raised: $46M Series A 2022; $147M Series B 2025-26 [1][5]
- Ownership: Venture-backed [2]
- Employees: Up about 25 percent over 18 months to May 2026 [4]

## Card fields

The same 8 fields every Green Infrastructure card, table row and comparison shows. A missing value says why: No data or Not published.

- Solution: Low-carbon materials
- Deployment: Not published
- Signature project: Cleburne SCM plant, Cleburne, TX (Developer of its first commercial plant); Salt Lake area SCM plant, Magna, UT (Developer; DOE grant recipient); Sugar Land demonstration pour, Sugar Land, TX, 2023 (Supplied SCM for a demonstration pour)
- Markets served: Texas, Utah
- Status: Active · Expanding
- Certifications: No data
- Evidence: Partial
- Checked: Nov 2026

## Solution

- Low-carbon materials, OPUS SCM replaces up to half of portland cement in concrete [4]

## Signature projects

- Cleburne SCM plant, Cleburne, TX (Developer of its first commercial plant): A 240,000 ton a year OPUS SCM plant for the Dallas-Fort Worth market, described in May 2026 as on schedule for mid-2027. [4][3]
- Salt Lake area SCM plant, Magna, UT (Developer; DOE grant recipient): A planned plant west of Salt Lake City of up to 240,000 metric tons a year, using Kennecott copper mine tailings developed with Rio Tinto. [3][4]
- Sugar Land demonstration pour, Sugar Land, TX, 2023 (Supplied SCM for a demonstration pour): A concrete pour at a Porsche dealership in August 2023, reported by Canary Media. [3]

## Factories

- Cleburne, Texas, United States: Under construction, 240,000 t/yr SCM, operation expected mid-2027 [4]

## Serves

- Texas (US-TX) [3][4]
- Utah (US-UT) [3][4]

## Timeline

- 2022-07 (funding): Closed a $46 million Series A co-led by Breakthrough Energy Ventures and LenX, bringing venture funding to $61 million. [1]
- 2023-08 (milestone): Its SCM was used in a demonstration pour at a Porsche dealership in Sugar Land, Texas. [3]
- 2024-10 (funding): Provisionally selected for a $52.6 million DOE grant for a plant near Salt Lake City; World Cement reported in 2026 that it retained the grant. [3][4]
- 2025-07-02 (funding): Closed a $124.5 million Series B to build its Texas plant. [2]
- 2026-05 (milestone): Reported Cleburne construction on schedule for mid-2027 and planned a new Golden headquarters with pilot-scale labs. [4]
- 2026-05 (funding): The All Aboard Coalition invested $22 million as an addition to its Series B, bringing the round to $147 million. [5]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Specifics published (level 2)

Canary Media reports the Utah plant is to use tailings from the Kennecott copper mine, developed with Rio Tinto, and Trellis lists mining waste among its feedstocks. No tonnage of waste used was found.

- Evidence: Canary Media reports Kennecott tailings as the Utah feedstock. [3]
- Evidence: Trellis lists mining waste streams among feedstocks. [1]
- Gap: Metric tons of tailings or waste rock used per year.

### Energy and Carbon: Specifics published (level 2)

The company reports 70 percent less CO2 per ton of portland cement displaced, as Canary Media attributes it; TechCrunch states the figure without attribution. Trellis names Braun Intertec and WesTest as testers, without saying they checked carbon.

- Evidence: Canary Media reports the chief executive's 70 percent estimate. [3]
- Evidence: Trellis names third-party testing firms. [1]
- Gap: A third-party verified EPD for OPUS SCM.

### Cost and Access: No public evidence (level 0)

No price for OPUS SCM was found.

- Gap: Published prices compared with portland cement and fly ash.

### Workforce: Claims only (level 1)

World Cement reports headcount grew about 25 percent over the 18 months to May 2026, with no base number. No training or safety figure was found.

- Evidence: World Cement reports the 25 percent growth. [4]
- Gap: Headcount and jobs planned at the Texas and Utah plants.

### Delivery Record: Specifics published (level 2)

Named press reports $193 million in Series A and B funding, a demonstration pour in 2023 and a Texas plant under construction for mid-2027. No commercial plant operates yet.

- Evidence: World Cement reports the Cleburne schedule. [4]
- Evidence: TechCrunch reports the Series B. [2]
- Evidence: ImpactAlpha reports the B round reaching $147 million. [5]
- Gap: Tons of SCM shipped and a list of projects using it.

## Sources

1. [Materials startup raises $46 million to replace cement](https://trellis.net/article/materials-startup-raises-46-million-replace-cement/) (Trellis)
2. [Terra CO2 cements $124M Series B to slash concrete's carbon footprint](https://techcrunch.com/2025/07/02/terra-co2-cements-124m-series-b-to-slash-concretes-carbon-footprint) (TechCrunch)
3. [A former Utah coal town could soon become a hub for low-carbon cement](https://www.canarymedia.com/articles/clean-industry/a-former-utah-coal-town-could-soon-become-a-hub-for-low-carbon-cement) (Canary Media)
4. [Terra extends momentum across production, technology and deployment of sustainable cement](https://www.worldcement.com/the-americas/11052026/terra-extends-momentum-across-production-technology-and-deployment-of-sustainable-cement/) (World Cement)
5. [All Aboard Coalition backs ready-to-scale green cement maker Terra](https://impactalpha.com/?p=125479) (ImpactAlpha)