# Vicinity Energy

Owns and runs 19 district steam, hot water and chilled water systems in 12 US cities; based in Boston.

- **Operating status:** Active. Owned by Antin Infrastructure Partners since 2020; in September 2026 Kenon Holdings reported an agreement for an entity it owns with Harrison Street funds to buy a majority interest in Vicinity at a $2.92 billion enterprise value, closing expected in the second quarter of 2027. [4][5][6]
- **Momentum:** Expanding
- **Ownership:** Part of Antin Infrastructure Partners
- **Headquarters:** Boston, Massachusetts, United States
- **Founded:** 2020
- **Role:** Energy and water system operator, Developer
- **Solution:** District energy, Building decarbonization, Heat pumps
- **Field Guides:** Green Infrastructure
- **Website:** https://www.vicinityenergy.us/ (loaded when checked)

Checked 2026-11-23. Page: https://nowcitylabs.com/fieldguide/green-infrastructure/p/vicinity-energy/

## Summary by the Lead Analyst

Vicinity Energy runs 19 district energy systems in 12 US cities, about 1,000 buildings and 250 million square feet, formed in 2020 when Antin Infrastructure Partners bought Veolia North America's US district energy assets. A 42 MW electric boiler in Cambridge has supplied eSteam since November 2024 and a 35 MW river heat pump is due by 2028. Kenon Holdings reported a 2026 agreement to buy a majority interest at a $2.92 billion enterprise value. No measured carbon figure was found.

Verify first: Whether the 2026 sale to Harrison Street and Kenon closes, and what share of a given network's steam is eSteam today.

## What it is

Vicinity Energy, based in Boston, owns and operates 19 district energy systems in 12 US cities, including Boston, Cambridge, Philadelphia, Baltimore and Washington, D.C. It supplies steam, hot water and chilled water through more than 140 miles of pipe to about 250 million square feet of conditioned space, and lists 520 employees. [1][2]
It launched in January 2020 after Antin Infrastructure Partners finalized its purchase of Veolia North America's US district energy assets, then 13 networks in 10 cities. In September 2026 Kenon Holdings reported an agreement under which an entity owned by Kenon and funds managed by Harrison Street Asset Management will buy a majority interest, between about 60 and 100 percent, in Vicinity at a $2.92 billion enterprise value, with closing expected in the second quarter of 2027. [4][5][6]
Its electrification plan centers on eSteam made with grid power. A 42 MW electric boiler at its Kendall facility in Cambridge began supplying customers in Boston and Cambridge in November 2024, and in November 2025 it began work on a 35 MW heat pump complex there that draws heat from the Charles River, with installation planned by 2028. [3][7][8]

## Key facts

- Headquarters: Boston, Massachusetts [1]
- Ownership: Antin Infrastructure Partners; sale agreed in 2026 [5][6]
- Serves: 19 systems in 12 US cities [2]
- Buildings served: About 1,000 buildings, 250 million sq ft [5]
- Employees: 520 (company-reported) [2]
- Revenue: About $611 million in 2025 [5]

## Card fields

The same 8 fields every Green Infrastructure card, table row and comparison shows. A missing value says why: No data or Not published.

- Solution: District energy, Building decarbonization, Heat pumps
- Deployment: 1,000 buildings served, 2026
- Signature project: Kendall electric boiler (eSteam), Cambridge, MA, 2024 (Owner and operator); Kendall river-source heat pump, Cambridge, MA (Owner and developer)
- Markets served: Georgia, Maryland, Massachusetts, Michigan, Missouri, West Virginia, Oklahoma, Pennsylvania, New Jersey, District of Columbia
- Status: Active · Expanding
- Certifications: No data
- Evidence: Strong
- Checked: Nov 2026

## Solution

- District energy, Steam, hot water and chilled water networks in 12 cities [2][5]
- Building decarbonization, 42 MW electric boiler at Kendall supplies eSteam since 2024 [3][8]
- Heat pumps, 35 MW river-source heat pump under construction at Kendall [7]

## Signature projects

- Kendall electric boiler (eSteam), Cambridge, MA, 2024 (Owner and operator): A 42 MW electric boiler at the Kendall facility that replaced a steam turbine and began supplying eSteam to customers in Boston and Cambridge in November 2024. [3][8]
- Kendall river-source heat pump, Cambridge, MA (Owner and developer): A 35 MW heat pump complex drawing heat from the Charles River, replacing a gas boiler, with installation planned by 2028; Everllence supplies the heat pump and DCO Energy installs it. [7]

## Deployment

- Buildings served: 1,000 buildings served, 2026 (approximate count in Kenon Holdings release filed with the SEC) [5]

## Serves

- Georgia (US-GA) [2]
- Maryland (US-MD) [2]
- Massachusetts (US-MA) [2]
- Michigan (US-MI) [2]
- Missouri (US-MO) [2]
- West Virginia (US-WV) [2]
- Oklahoma (US-OK) [2]
- Pennsylvania (US-PA) [2]
- New Jersey (US-NJ) [2]
- District of Columbia (US-DC) [2]

## Timeline

- 2020-01-27 (acquisition): Antin Infrastructure Partners finalized its purchase of Veolia North America's US district energy assets, renamed Vicinity Energy. [4]
- 2024-11 (milestone): Began supplying eSteam from a 42 MW electric boiler at its Kendall facility in Cambridge to customers in Boston and Cambridge. [3][8]
- 2025-11 (milestone): Began construction of a 35 MW river-source heat pump complex at Kendall, with Everllence and DCO Energy, planned by 2028. [7]
- 2026-09-30 (milestone): Kenon Holdings reported an agreement for an entity it owns with Harrison Street funds to buy a majority interest in Vicinity at a $2.92 billion enterprise value, closing expected in the second quarter of 2027. [5][6]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: No public evidence (level 0)

No public evidence was found on materials reuse, waste or end of life for its plants and pipe networks.

- Gap: Any reporting on equipment reuse, pipe replacement waste or decommissioning of retired boilers.

### Energy and Carbon: Specifics published (level 2)

The company documents a 42 MW electric boiler in Cambridge supplying eSteam since November 2024 and a 35 MW river heat pump due by 2028, and a 2050 net zero goal stated in 2020. No measured or third-party verified emissions figure was found.

- Evidence: Company page documents the 42 MW Cambridge electric boiler installed in 2024. [3]
- Evidence: IDEA reports the 35 MW Kendall heat pump complex, planned by 2028. [7]
- Evidence: The 2020 launch release states a goal of net zero carbon across its portfolio by 2050. [4]
- Gap: Measured annual emissions by network and the share of steam made with electricity, verified by a third party.

### Cost and Access: Specifics published (level 2)

A September 2026 Kenon filing describes largely long-term contracts with about a 15-year weighted tenor, inflation-linked escalators and fuel cost pass-throughs. No published rates were found.

- Evidence: Kenon's SEC-filed release describes contract tenor, escalators and fuel pass-throughs. [5]
- Gap: Published steam and chilled water rates and how eSteam is priced against gas-made steam.

### Workforce: Specifics published (level 2)

The company lists 520 employees. Its 2020 launch release says most engineers and operators stayed on after the Veolia sale. No figures on training, safety or turnover were found.

- Evidence: About page lists 520 employees. [2]
- Evidence: Launch release says leadership and most engineers, operators and energy experts remained. [4]
- Gap: Safety record, training programs and any staffing changes tied to the 2026 sale.

### Delivery Record: Third-party evidence (level 3)

An SEC-filed Kenon release reports about 1,000 buildings, more than 700 customers, 250 million square feet and about $611 million in 2025 revenue. Named press reports more than 160 new building connections under Antin since 2020.

- Evidence: Kenon release filed with the SEC gives buildings, customers and 2025 revenue. [5]
- Evidence: Power Technology reports more than 160 new buildings connected under Antin. [6]
- Gap: Building counts by city and audited financials published by Vicinity itself.

## Sources

1. [Vicinity Energy](https://www.vicinityenergy.us/) (Vicinity Energy)
2. [About Vicinity](https://www.vicinityenergy.us/company/about/) (Vicinity Energy)
3. [Electric boilers](https://www.vicinityenergy.us/clean-energy-future/sustainability/electric-boilers/) (Vicinity Energy)
4. [Vicinity Energy is Now the Largest Provider of District Energy Solutions in North America](https://www.vicinityenergy.us/press-releases/vicinity-energy-largest-provider-district-energy-solutions-north-america/) (Vicinity Energy)
5. [Kenon Holdings Ltd. Form 6-K, Exhibit 99.1](https://www.sec.gov/Archives/edgar/data/0001611005/000117891326004650/exhibit_99-1.htm) (US Securities and Exchange Commission)
6. [Antin to sell majority stake in Vicinity Energy](https://www.power-technology.com/news/antin-sell-stake-vicinity-energy/) (Power Technology)
7. [Vicinity Energy Commences Construction of Industrial-Scale Heat Pump Complex](https://www.districtenergy.org/blogs/district-energy/2025/11/05/vicinity-energy-commences-construction-of-industri) (International District Energy Association)
8. [Electrifying Boston and Cambridge's steam system](https://www.districtenergy.org/blogs/district-energy/2024/12/19/electrifying-boston-and-cambridges-steam-system-vi) (International District Energy Association)