FVB Energy

Engineer · Headquarters not confirmed · checked November 23, 2026

Employee-owned engineering firm that plans and designs district heating and cooling systems in Canada, the US, Sweden and the UK.

Where it standsIts site describes a 100 percent employee-owned firm with over 200 staff, and its project pages report district energy work in design and construction from 2024 to 2026.[2][5][7]

Lead Analyst summary

Compiled from the five specialist findings. Read the findings.

FVB Energy is an employee-owned engineering firm, begun in Sweden in 1970, that plans and designs district heating and cooling. It reports over 200 staff and more than 50 systems started up in North America. Its project pages describe sewage and effluent heat recovery work in Vancouver, Mississauga and Markham. Evidence of its role is company-published; city releases confirm the systems but do not name the firm. No head office is stated.

Verify first. Ask clients to confirm FVB's role and the measured output of the systems it designed; third-party sources here do not name the firm.

What it is

FVB Energy describes itself as an engineering firm focused on district energy: low-carbon heating and cooling networks, energy master planning, campus steam-to-hot-water conversions and combined heat and power.[1]

FVB Sverige AB was founded in Sweden in 1970. North American offices opened in 1980, a Canadian office in 1992 and a UK company in 2016. The firm reports over 200 staff in 16 offices in four countries and says it is 100 percent employee owned.[2]

Its project pages describe design and owner's engineer roles on neighborhood systems in Vancouver, Mississauga and Markham that recover heat from sewage or treated wastewater.[4][6][7]

At a glance

Status
Active
Role
Engineer
Serves
BC, ON, United States, Sweden, +1
Founded
1970
Practice
District systems[4][5][6][7]
Solution
District energy[1][2][4]
Projects
50 projects, 2026[2]

Signature projects

  • Southeast False Creek Neighbourhood Energy Utility, Vancouver, BC. Feasibility study, detailed design and owner's engineer City of Vancouver utility that recovers heat from raw sewage with a 2.7 MW heat pump. FVB reports 34 buildings and 4,920 residential suites connected as of 2019.[4]
  • River District Energy Centre, Vancouver, BC. Design and mechanical engineer of record Energy center with 30 MW of heating capacity, linked to Metro Vancouver's waste-to-energy facility, serving the River District neighborhood. Full-load firing was completed in the 2025 to 2026 winter.[5]
  • Lakeview Village district energy, Mississauga, ON. Feasibility, business case and owner's engineer System for a 177-acre former coal plant site planned for 16,000 homes, to draw heat from treated wastewater. Construction began in October 2024 with Enwave as owner and operator.[6][8]
  • Markham wastewater energy transfer project, Markham, ON. Prime consultant and engineer of record Up to 18.75 MW of heating and 3,600 tons of cooling from a trunk sewer for Markham District Energy. Construction began in July 2024 with operation expected by 2026.[7]