Where it standsMembers vote on November 26, 2026 on a third site at Thurgauerstrasse in Zurich; its Hobelwerk site in Winterthur was fully occupied in November 2023.[9][6]
mehr als wohnen is a Zurich housing cooperative founded in 2007 and backed by 55 cooperatives. It completed Hunziker Areal in 2015, 13 buildings for 1,200 residents who commit to living without private cars, which it reports was certified as a 2000-Watt site in 2017 and renewed in 2021, and Hobelwerk in Winterthur in 2023. UN-Habitat presented it a World Habitat Award in 2017. Rents, measured energy use and staff figures were not found.
Verify first. Ask for the 2000-Watt certificate, current rents and measured energy data; the sources reviewed give targets but not figures.
What it is
mehr als wohnen is a building cooperative founded in December 2007 by Zurich housing cooperatives as a shared platform for new forms of nonprofit housing. It is now supported by 55 cooperatives, residents and other members.[1]
Its first project, Hunziker Areal, replaced a concrete works in Zurich-Leutschenbach with 13 buildings designed by several architecture teams. Residents moved in from November 2014 to May 2015 and agree not to own a private car, using shared bikes and electric cars instead.[2][4][5]
Its second, Hobelwerk in Winterthur, was built between 2018 and 2023 and houses about 400 people. Members vote in November 2026 on a third project at Thurgauerstrasse in Zurich.[6][9]
Community ownership[1], Walkable neighborhoods[5], Mixed-use[2], Infill[2], Other[3]
Signature projects
Hunziker Areal, Zurich, Switzerland, 2015. Developer and owner 13 buildings on a 41,000 sq m former concrete works, home to 1,200 people with about 150 jobs; residents give up private cars.[2][4][5]
Hobelwerk, Winterthur, Switzerland, 2023. Developer and owner 158 apartments in five buildings for about 400 people on 15,000 sq m by Oberwinterthur station, built 2018 to 2023.[6]
Five AI specialists each read the sourced facts on this page for one question. A level measures the public evidence; the company itself is unrated. How the AI Research Team works.
Materials and Circularity
Where do the offcuts go, and can this building be taken apart and used again?
Claims only
The cooperative states it builds in an ecological way with as few pollutants as possible. No figures on materials, waste or design for disassembly were found.
Evidence
mehr als wohnen describes a low-pollutant, ecological way of building at Hunziker Areal.[3]
Gap
Material and waste data for Hunziker Areal and Hobelwerk.
Energy and Carbon
What is the measured energy use or embodied carbon, and who checked it?
Specifics published
The cooperative reports that Hunziker Areal was certified a 2000-Watt site in operation in 2017 and recertified in 2021, and that about 75 percent of its electricity comes from rooftop solar. No certifier record or measured energy use per resident was found in the sources reviewed.
Evidence
The cooperative reports 2000-Watt site certification in 2017 and recertification in 2021.[3]
About 75 percent of electricity is produced by rooftop solar.[5]
Gap
A certifier record and the factsheet figures for measured energy and emissions per person.
Cost and Access
What does a finished home cost, and who has moved in?
Claims only
The cooperative describes its homes as affordable nonprofit cooperative housing, but no rents or income data were found.
Evidence
The cooperative describes affordable housing as a goal of the Hunziker Areal competition.[1]
Gap
Rents per square meter, subsidized homes and resident incomes.
Workforce
How many people work there, and what happened to them when plans changed?
No public evidence
No public information was found on the cooperative's staff numbers or on construction jobs at its sites.
Gap
Headcount and construction workforce data.
Delivery Record
How many buildings exist today, and is the company still here?
Third-party evidence
UN-Habitat reported in May 2017 that the project produced 13 buildings with 400 housing units involving more than 50 cooperatives. The cooperative reports Hobelwerk complete in November 2023 with 158 apartments.
Evidence
UN-Habitat reported 13 buildings with 400 housing units.[7]
Hobelwerk was fully built and occupied in November 2023 with 158 apartments.[6]
Gap
Filed accounts and an independent count of Hobelwerk homes.
Timeline
December 2007.Founded Zurich housing cooperatives founded mehr als wohnen after a year marking a century of city housing policy.[1]
May 2009.Milestone Four winning teams were chosen in an international architecture competition for Hunziker Areal.[4]
2010.Milestone Took over the Hunziker Areal site on a long-term land lease.[2]
July 2012.Milestone Broke ground at Hunziker Areal.[4]
December 2015.Milestone Finished construction at Hunziker Areal; all 13 buildings were occupied from November 2014 to May 2015.[4]
2017.Milestone The cooperative reports Hunziker Areal was certified as a 2000-Watt site in operation, one of the first five in Switzerland.[3]
May 2017.Milestone Received a World Habitat Award at the UN-Habitat Governing Council in Nairobi.[7]
2021.Milestone The cooperative reports Hunziker Areal was recertified as a 2000-Watt site.[3]
November 2023.Milestone The last three Hobelwerk buildings in Winterthur were completed and occupied.[6]
November 26, 2026.Milestone Members vote on a planning and construction credit for its project at Thurgauerstrasse, Zurich.[9]