Mikhail Riches is a London architecture practice. Its record rests on two documented projects: Goldsmith Street in Norwich, about 100 certified Passivhaus council homes that won the 2019 RIBA Stirling Prize, and Park Hill Phase 2 in Sheffield, a retrofit of 195 flats in a listed estate completed in March 2022. Founding year, headcount, ownership and a full list of completed projects are not confirmed by the sources checked.
Verify first. Founding date and ownership are not settled by an opened source; confirm both before citing them.
What it is
Mikhail Riches is an architecture practice based on D'Arblay Street in London. Urban Splash describes its work across housing, education, mixed use, master planning and retrofit.[1][7]
With Cathy Hawley it designed Goldsmith Street, about 100 homes for Norwich City Council built to Passivhaus, which won the 2019 RIBA Stirling Prize. Architectural Record reported annual energy costs estimated at 70 percent below an average household's.[2][3][4]
For Urban Splash and Places for People it designed Park Hill Phase 2 in Sheffield, which kept the listed concrete frame and reconfigured it into 195 flats. Construction finished in March 2022.[5][6]
Goldsmith Street, Norwich, United Kingdom. Architect, with Cathy Hawley About 100 council homes for Norwich City Council in two and three story terraces, built to Passivhaus. Won the 2019 RIBA Stirling Prize and the first Neave Brown Award for housing.[2][3][4]
Park Hill Phase 2, Sheffield, United Kingdom, 2022. Architect Retrofit of the central section of a listed brutalist estate for Urban Splash and Places for People: 195 flats and 2,000 square meters of commercial space, with the original frame kept.[5][6]
Five AI specialists each read the sourced facts on this page for one question. A level measures the public evidence; the company itself is unrated. How the AI Research Team works.
Materials and Circularity
Where do the offcuts go, and can this building be taken apart and used again?
Third-party evidence
RIBA and the Housing Design Awards report that Park Hill Phase 2 kept as much of the listed concrete frame as possible and insulated it rather than rebuilding. No material reuse or waste quantities are published in the sources checked.
Evidence
RIBA reports the original concrete frame was retained and the flats reconfigured.[5]
The Housing Design Awards entry says the team aimed to retain as much of the existing building as possible.[6]
Gap
Quantities of retained and new material, and construction waste figures.
Energy and Carbon
What is the measured energy use or embodied carbon, and who checked it?
Third-party evidence
The Passivhaus Trust lists Goldsmith Street as Passivhaus, with Etude as certifier. Park Hill Phase 2 is all electric, with an estimated 87 percent cut in operational emissions in its awards entry; that figure is an estimate, not a measurement.
Evidence
The Passivhaus Trust names Etude as certifier for Goldsmith Street.[2]
The Housing Design Awards entry estimates an 87 percent reduction in operational emissions at Park Hill Phase 2.[6]
Gap
Measured energy use after occupancy and embodied carbon figures.
Cost and Access
What does a finished home cost, and who has moved in?
Third-party evidence
Goldsmith Street delivered about 100 council homes for Norwich City Council, with energy costs estimated at 70 percent below the average household's. Park Hill Phase 2 is 100 percent private ownership; affordable homes there sit in other phases.
Evidence
The Passivhaus Trust names Norwich City Council as client.[2]
Architectural Record reported about 100 homes and estimated energy costs 70 percent below average.[3]
The Housing Design Awards entry lists Park Hill Phase 2 as 100 percent private ownership.[6]
Gap
Rents at Goldsmith Street and any later changes in tenure.
Workforce
How many people work there, and what happened to them when plans changed?
No public evidence
No headcount, ownership, training or employment data were found in the sources opened.
Gap
Staff numbers, ownership structure and any workforce disclosures.
Delivery Record
How many buildings exist today, and is the company still here?
Third-party evidence
Two completed projects are confirmed by RIBA and named press: Goldsmith Street (Stirling Prize, 2019) and Park Hill Phase 2 (completed March 2022, RIBA National Award 2024). The practice's founding year is not settled by the sources opened.
Evidence
Architect magazine reported the 2019 Stirling Prize and Neave Brown Award for Goldsmith Street.[4]
RIBA lists Park Hill Phase 2 by Mikhail Riches as a 2024 National Award winner.[5]
Gap
Founding year, total completed projects and revenue.
Timeline
October 8, 2019.Milestone Goldsmith Street won the RIBA Stirling Prize and the first Neave Brown Award for housing.[2][4]
December 2021.Milestone First completed homes at Park Hill Phase 2 were handed over.[6]
March 2022.Milestone Construction of Park Hill Phase 2 was completed.[6]
2024.Milestone Park Hill Phase 2 won a RIBA National Award and was shortlisted for the Stirling Prize.[5]